Completed Projects

1. Evaluation of Design Criteria for Inflow and Infiltration of Medium Scale Sewerage Catchment – VOT:74281, (23rd October 2004- 31st December 2006). Research Member

2. Integrated Models in Adaptation to Climate Change Impact for Reservoir Operation at Bukit Merah Reservoir System – Vote. 4L828, TRGS, MOHE (RM64,000.00), December 2012 – December 2015. Research Member.

3. Rainwater Harvesting in UTM Catchment –Vot. 01G19, GUP (RM), April 2013 – March 2014. Research Member.

4. Influence of Catchment Morphometry on Flood Characteristics for Kelantan River Basin – Vote. 4L828, TRGS, MOHE (RM133,400.00), April 2015 – Mac 2016. Principal Investigator

5. Computational Modelling of Kelantan River for December Event – Vote 4L833, TRGS, MOHE (RM99,000.00), April 2015 – Mac 2016. Research Member

6. Developing Vulnerability Indices to Flooding for the Kelantan River Basin – Vote. 4L827, TRGS, MOHE (RM119,200.00), April 2015 – Mac 2016. Research Member

7. Reducing Flood Hazard based on structural and non-structural approaches: A perspective from Geaospatial Technology and Hydrodynamic Simulation Vote 4F699, FRGS, MOHE (RM70,000.00 ), April 2015 – Mac 2016. Research Member

8. Hydrodynamic Simulation of Kelantan River Bank Erosion and Channel Change During Heavy Floods. Vote 4F692, FRGS, MOHE (RM36,500.00 ),April 2015 – Mac 2016. Research Member