{"id":1830,"date":"2016-11-22T13:54:17","date_gmt":"2016-11-22T05:54:17","guid":{"rendered":"http:\/\/people.utm.my\/baharinmesir\/?p=1830"},"modified":"2016-11-21T13:01:45","modified_gmt":"2016-11-21T05:01:45","slug":"20-key-bim-terms-1-2","status":"publish","type":"post","link":"https:\/\/people.utm.my\/baharinmesir\/20-key-bim-terms-1-2\/","title":{"rendered":"The 20 key BIM terms you need to know (1-2)"},"content":{"rendered":"<p><a href=\"https:\/\/www.thenbs.com\/knowledge\/the-20-key-bim-terms-you-need-to-know\"><img decoding=\"async\" class=\"alignnone size-full\" src=\"https:\/\/people.utm.my\/baharinmesir\/wp-content\/uploads\/sites\/654\/2016\/11\/20_hero.jpg\" alt=\"\" \/><\/a><\/p>\n<h2>1. 4D, 5D, 6D<\/h2>\n<p>First there was 2D CAD, then 3D CAD \u2013 now there are extra dimensions to refer to the linking of the BIM model with time-, cost- and schedule-related information (although the precise order hasn\u2019t to date been agreed across the whole industry).<\/p>\n<h2>2. Asset Information Model (AIM), Building Information Model (BIM), Project Information Model (PIM)<\/h2>\n<p>Not only is there the \u2018Building\u2019 information model, but the \u2018Asset\u2019 information model \u2013 which is the name given to the same model post-construction, i.e. supplemented with the data needed to assist in the running of the completed asset. Note that \u2018asset\u2019 can also refer to civil engineering and infrastructure work (see also Uniclass, below<\/p>\n<p>Conversely, the \u2018Project\u2019 information model is the name given during the design and construction stage, i.e. what\u2019s commonly known as the project among the design team.<\/p>\n<p>Source: <em><a href=\"https:\/\/www.thenbs.com\/knowledge\/the-20-key-bim-terms-you-need-to-know\">The 20 key BIM terms you need to know | NBS<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1. 4D, 5D, 6D First there was 2D CAD, then 3D CAD \u2013 now there are extra dimensions to refer to the linking of the BIM model with time-, cost- and schedule-related information (although the precise order hasn\u2019t to date been agreed across the whole industry). 2. Asset Information Model (AIM), Building Information Model (BIM), [&hellip;]<\/p>\n","protected":false},"author":7436,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[51,36],"tags":[284,52,285],"class_list":["post-1830","post","type-post","status-publish","format-standard","hentry","category-bim","category-technology","tag-20-key","tag-bim","tag-terms"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/1830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/users\/7436"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/comments?post=1830"}],"version-history":[{"count":0,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/1830\/revisions"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/media?parent=1830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/categories?post=1830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/tags?post=1830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}