{"id":1833,"date":"2016-11-23T14:00:35","date_gmt":"2016-11-23T06:00:35","guid":{"rendered":"http:\/\/people.utm.my\/baharinmesir\/?p=1833"},"modified":"2016-11-21T13:05:52","modified_gmt":"2016-11-21T05:05:52","slug":"the-20-key-bim-terms-3-4","status":"publish","type":"post","link":"https:\/\/people.utm.my\/baharinmesir\/the-20-key-bim-terms-3-4\/","title":{"rendered":"The 20 key BIM terms you need to know (3-4)"},"content":{"rendered":"<h2>3. BIM execution plan (BEP)<\/h2>\n<p>PAS 1192-2 (see below) proposes that a BIM Execution Plan is created for managing the delivery of the project. This in turn is split into a \u2018pre-contract\u2019 BEP, in response to the Employer\u2019s Information Requirements (in other words, comparable to \u2018contractor\u2019s proposals\u2019 in a Design &amp; Build contract) and a \u2018post-contract\u2019 BEP which sets out the contracted delivery details.<\/p>\n<h2>4. CIC BIM protocol<\/h2>\n<p>A supplementary legal agreement which is designed to be used by construction clients and contractor clients. It is incorporated into professional services appointments and construction contracts \u2013 an amendment to standard terms, creating additional rights and obligations for the employer and the contracted party to facilitate collaborative working, while safeguarding intellectual property ownership and liability differentiation between those involved.<\/p>\n<p>Source:\u00a0<em><a href=\"https:\/\/www.thenbs.com\/knowledge\/the-20-key-bim-terms-you-need-to-know\">The 20 key BIM terms you need to know | NBS<\/a><\/em><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>3. BIM execution plan (BEP) PAS 1192-2 (see below) proposes that a BIM Execution Plan is created for managing the delivery of the project. This in turn is split into a \u2018pre-contract\u2019 BEP, in response to the Employer\u2019s Information Requirements (in other words, comparable to \u2018contractor\u2019s proposals\u2019 in a Design &amp; Build contract) and a [&hellip;]<\/p>\n","protected":false},"author":7436,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[51],"tags":[284,52,285],"class_list":["post-1833","post","type-post","status-publish","format-standard","hentry","category-bim","tag-20-key","tag-bim","tag-terms"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/1833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/users\/7436"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/comments?post=1833"}],"version-history":[{"count":0,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/1833\/revisions"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/media?parent=1833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/categories?post=1833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/tags?post=1833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}