{"id":1843,"date":"2016-11-28T13:21:06","date_gmt":"2016-11-28T05:21:06","guid":{"rendered":"http:\/\/people.utm.my\/baharinmesir\/?p=1843"},"modified":"2016-11-21T13:23:49","modified_gmt":"2016-11-21T05:23:49","slug":"20-key-bim-terms-13-14","status":"publish","type":"post","link":"https:\/\/people.utm.my\/baharinmesir\/20-key-bim-terms-13-14\/","title":{"rendered":"The 20 key BIM terms you need to know (13-14)"},"content":{"rendered":"<h2>13. Information Delivery Manual (IDM)<\/h2>\n<p>To make BIM effective, information needs to be:]<\/p>\n<ul>\n<li>made available when it is needed and<\/li>\n<li>to a satisfactory quality.<\/li>\n<\/ul>\n<p>This can be achieved by using an Information Delivery Manual, that identifies the various construction processes, and the information required at each stage. ISO 29481-1 specifies a methodology for the format of the IDM.<\/p>\n<p>IDM also forms one part of the BuildingSMART interoperability model; the other two parts being the Data Dictionary (mapping alternative terms for common elements) and IFC (see above). Note that this is beyond the scope of Level 2 requirements.<\/p>\n<h2>14. Information Manager<\/h2>\n<p>The CIC BIM Protocol (see above) refers to and provides for the appointment of an \u2018Information Manager\u2019 by the employer. This is, in essence, a project manager, who is responsible for managing the delivery of the asset using BIM procedures and methods. This is expected to form part of a wider set of duties under an existing appointment and is likely to be performed either by the Design Lead or the Project Lead.<\/p>\n<p>&nbsp;<\/p>\n<p>Source:\u00a0<em><a href=\"https:\/\/www.thenbs.com\/knowledge\/the-20-key-bim-terms-you-need-to-know\">The 20 key BIM terms you need to know | NBS<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>13. Information Delivery Manual (IDM) To make BIM effective, information needs to be:] made available when it is needed and to a satisfactory quality. This can be achieved by using an Information Delivery Manual, that identifies the various construction processes, and the information required at each stage. ISO 29481-1 specifies a methodology for the format [&hellip;]<\/p>\n","protected":false},"author":7436,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[51],"tags":[284,52,285],"class_list":["post-1843","post","type-post","status-publish","format-standard","hentry","category-bim","tag-20-key","tag-bim","tag-terms"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/1843","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/users\/7436"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/comments?post=1843"}],"version-history":[{"count":0,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/1843\/revisions"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/media?parent=1843"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/categories?post=1843"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/tags?post=1843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}