{"id":766,"date":"2016-11-12T11:43:28","date_gmt":"2016-11-12T03:43:28","guid":{"rendered":"http:\/\/people.utm.my\/baharinmesir\/?p=766"},"modified":"2016-11-07T11:45:13","modified_gmt":"2016-11-07T03:45:13","slug":"top-10-bim-myths-4","status":"publish","type":"post","link":"https:\/\/people.utm.my\/baharinmesir\/top-10-bim-myths-4\/","title":{"rendered":"Top 10 BIM myths"},"content":{"rendered":"<h4>Myth #4: BIM&#8217;s just for the &#8216;big&#8217; &#8211; big companies, big buildings, big (government) projects<\/h4>\n<p><a href=\"https:\/\/people.utm.my\/baharinmesir\/?attachment_id=756\" rel=\"attachment wp-att-756\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-756\" src=\"https:\/\/people.utm.my\/baharinmesir\/wp-content\/uploads\/sites\/654\/2016\/11\/Bim4.jpg\" alt=\"bim4\" width=\"211\" height=\"239\" \/><\/a><\/p>\n<p>Bleeding edge &#8216;case studies&#8217; and &#8216;exemplar projects&#8217; focussed on the big and impressive, but this should not be taken to mean that these are the only kinds of projects that can benefit from a BIM approach. Indeed, smaller companies potentially have most to gain from the efficiencies and collaboration brought about by BIM. The fact is that all <span id=\"RadESpellError_12\" class=\"RadEWrongWord\">organisations<\/span> typically incur the same kinds of financial costs (though on differing scales) in delivering projects.<\/p>\n<p>Though governments are increasingly encouraging or even mandating the use of BIM on their projects, taken by the benefits and efficiencies that can be <span id=\"RadESpellError_13\" class=\"RadEWrongWord\">realised<\/span>, such an approach is not restricted to large, public-sector projects. Indeed, private sector clients are increasingly seizing the opportunities across a range of projects &#8211; both large and small, of varying levels of complexity.<\/p>\n<p><strong>The truth? Big or small, complex or simple, government or public sector &#8211; all projects and participants stand to benefit from a BIM approach.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Myth #4: BIM&#8217;s just for the &#8216;big&#8217; &#8211; big companies, big buildings, big (government) projects Bleeding edge &#8216;case studies&#8217; and &#8216;exemplar projects&#8217; focussed on the big and impressive, but this should not be taken to mean that these are the only kinds of projects that can benefit from a BIM approach. Indeed, smaller companies potentially [&hellip;]<\/p>\n","protected":false},"author":7436,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[51],"tags":[52,124,123],"class_list":["post-766","post","type-post","status-publish","format-standard","hentry","category-bim","tag-bim","tag-myths","tag-top-10"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/766","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/users\/7436"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/comments?post=766"}],"version-history":[{"count":0,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/766\/revisions"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/media?parent=766"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/categories?post=766"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/tags?post=766"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}