{"id":770,"date":"2016-11-14T11:47:08","date_gmt":"2016-11-14T03:47:08","guid":{"rendered":"http:\/\/people.utm.my\/baharinmesir\/?p=770"},"modified":"2016-11-07T11:49:47","modified_gmt":"2016-11-07T03:49:47","slug":"top-10-bim-myths-6","status":"publish","type":"post","link":"https:\/\/people.utm.my\/baharinmesir\/top-10-bim-myths-6\/","title":{"rendered":"Top 10 BIM Myths"},"content":{"rendered":"<h4>Myth #6: BIM only benefits those involved in design and construction<\/h4>\n<p><a href=\"https:\/\/people.utm.my\/baharinmesir\/?attachment_id=758\" rel=\"attachment wp-att-758\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-758\" src=\"https:\/\/people.utm.my\/baharinmesir\/wp-content\/uploads\/sites\/654\/2016\/11\/Bim6-300x169.jpg\" alt=\"bim6\" width=\"300\" height=\"169\" srcset=\"https:\/\/people.utm.my\/baharinmesir\/wp-content\/uploads\/sites\/654\/2016\/11\/Bim6-300x169.jpg 300w, https:\/\/people.utm.my\/baharinmesir\/wp-content\/uploads\/sites\/654\/2016\/11\/Bim6-768x432.jpg 768w, https:\/\/people.utm.my\/baharinmesir\/wp-content\/uploads\/sites\/654\/2016\/11\/Bim6-1024x576.jpg 1024w, https:\/\/people.utm.my\/baharinmesir\/wp-content\/uploads\/sites\/654\/2016\/11\/Bim6.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>BIM uncovers all views of the same underlying information, so all project participants stand to gain from these new ways of working. Designers can spend more time actually designing, safe in the knowledge that their designs look good and perform as expected. By co-<span id=\"RadESpellError_18\" class=\"RadEWrongWord\">ordinating<\/span> data, owners and contractors can accurately communicate design intent to clients. Using consistent, structured digital asset data should make it easy to see where operational costs lie for those interested in post-occupational decisions.<\/p>\n<p><strong>The truth? It&#8217;s not just design and construction teams who stand to benefit from BIM &#8211; everyone does!<br \/>\n<\/strong><\/p>\n<h4><\/h4>\n","protected":false},"excerpt":{"rendered":"<p>Myth #6: BIM only benefits those involved in design and construction BIM uncovers all views of the same underlying information, so all project participants stand to gain from these new ways of working. Designers can spend more time actually designing, safe in the knowledge that their designs look good and perform as expected. By co-ordinating [&hellip;]<\/p>\n","protected":false},"author":7436,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[51],"tags":[52,124,123],"class_list":["post-770","post","type-post","status-publish","format-standard","hentry","category-bim","tag-bim","tag-myths","tag-top-10"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/users\/7436"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/comments?post=770"}],"version-history":[{"count":0,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/posts\/770\/revisions"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/media?parent=770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/categories?post=770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/people.utm.my\/baharinmesir\/wp-json\/wp\/v2\/tags?post=770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}