{"id":768,"date":"2023-05-29T09:25:30","date_gmt":"2023-05-29T09:25:30","guid":{"rendered":"https:\/\/people.utm.my\/henrykang\/?page_id=768"},"modified":"2025-09-06T12:31:20","modified_gmt":"2025-09-06T12:31:20","slug":"consultancy","status":"publish","type":"page","link":"https:\/\/people.utm.my\/henrykang\/consultancy\/","title":{"rendered":"Consultancy"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><em>Jul<\/em><\/strong><strong><em> 2025 \u2013 Aug<\/em><\/strong><strong><em> <\/em><\/strong><strong><em>202<\/em><\/strong><strong><em>5<\/em><\/strong><strong><em> <\/em><\/strong>Coordinator, Maritime Silk Road Malaysia Ecological Environment and Climate Change Scientific Training Program, Nanjing University, UTSB 2732.<\/li>\n\n\n\n<li><strong><em>Sep<\/em><\/strong><strong><em> 2024 <\/em><\/strong>Member, 14th International Conference on Marine Technology (Martec 2024).<\/li>\n\n\n\n<li><strong><em>Jan<\/em><\/strong><strong><em> 2024 \u2013 Nov<\/em><\/strong><strong><em> <\/em><\/strong><strong><em>202<\/em><\/strong><strong><em>4<\/em><\/strong><strong><em> <\/em><\/strong>Member, The Provision of Current Load and Tow Tests, MISC Berhad, UTSB 2182 (2024).<\/li>\n\n\n\n<li><strong><em>Jun<\/em><\/strong><strong><em> 2024 \u2013 Dec 202<\/em><\/strong><strong><em>4<\/em><\/strong><strong><em> <\/em><\/strong>Member, River Floating Plastic Debris Monitoring Using New Technique, The Ocean Cleanup Interception B.V., UTSB 2504.<\/li>\n\n\n\n<li><strong><em>Jun<\/em><\/strong><strong><em> 2024 \u2013 Oct 202<\/em><\/strong><strong><em>4<\/em><\/strong><strong><em> <\/em><\/strong>Member, Resistance Test and Roll Decay Test, Naval Arch Marine Sdn. Bhd..<\/li>\n\n\n\n<li><strong><em>May<\/em><\/strong><strong><em> 2024 \u2013 Nov 202<\/em><\/strong><strong><em>4<\/em><\/strong><strong><em> <\/em><\/strong>Member, In-Situ Visual Counting of Floating Plastic Debris for Catch Monitoring and River Efficacy Monitoring, The Ocean Cleanup Interception B.V., UTSB 2500.<\/li>\n\n\n\n<li><strong><em>Dec<\/em><\/strong><strong><em> 2023 \u2013 Jan 202<\/em><\/strong><strong><em>4<\/em><\/strong><strong><em> <\/em><\/strong>Member, Provision for Bare Hull Model Test, MTC Engineering Consultancy Sdn. Bhd., UTSB 2409.<\/li>\n\n\n\n<li><strong><em>Nov<\/em><\/strong><strong><em> 202<\/em><\/strong><strong><em>3<\/em><\/strong><strong><em> \u2013 <\/em><\/strong><strong><em>Oct <\/em><\/strong><strong><em>202<\/em><\/strong><strong><em>4<\/em><\/strong><strong><em> <\/em><\/strong>Co-Principal Investigator, Hydrokinetics Turbine Powered System, UTP Procurement, UTSB 2443.<\/li>\n\n\n\n<li><strong><em>Sep<\/em><\/strong><strong><em> 202<\/em><\/strong><strong><em>3<\/em><\/strong><strong><em> \u2013 <\/em><\/strong><strong><em>Oct <\/em><\/strong><strong><em>2023 &nbsp;<\/em><\/strong>Member, Short Course on Basic Naval Architecture 2023.<\/li>\n\n\n\n<li><strong><em>Mar<\/em><\/strong><strong><em> 202<\/em><\/strong><strong><em>3<\/em><\/strong><strong><em> \u2013 May<\/em><\/strong><strong><em> <\/em><\/strong><strong><em>2023 &nbsp;<\/em><\/strong>Member, CFD Resistance and Seakeeping Analysis, Geliga Slipway Sdn Bhd, UTSB 2224.<\/li>\n\n\n\n<li><strong><em>Nov<\/em><\/strong><strong><em> 202<\/em><\/strong><strong><em>2<\/em><\/strong><strong><em> \u2013 Mar<\/em><\/strong><strong><em> <\/em><\/strong><strong><em>2023 &nbsp;<\/em><\/strong>Member, Bare Hull Model Making and Testing, Malaysia Marine and Heavy Engineering Sdn Bhd, UTSB 2141.<\/li>\n\n\n\n<li><strong><em>Jan<\/em><\/strong><strong><em> 2023 \u2013 Dec<\/em><\/strong><strong><em> <\/em><\/strong><strong><em>2023 \u00a0<\/em><\/strong>Member, The Provision of Current Load and Tow Tests, MISC Berhad, UTSB 2182.<\/li>\n\n\n\n<li><strong><em>Jan<\/em><\/strong><strong><em> 2023 \u2013 Feb<\/em><\/strong><strong><em> <\/em><\/strong><strong><em>2023 \u00a0<\/em><\/strong>Member, On-Site Consultancy and Facilities Support for River Efficacy Assessment, The Ocean Cleanup Interception B.V., UTSB 2209.<\/li>\n\n\n\n<li><strong><em>Mar<\/em><\/strong><strong><em> 2023 \u2013 Jul 2023 &nbsp;<\/em><\/strong>Member, Images Processing Using Artificial Intelligence and RMS Dismantlement and Re-Installation, The Ocean Cleanup Interception B.V., UTSB 2269.<\/li>\n\n\n\n<li><strong><em>Mar<\/em><\/strong><strong><em> 2023 \u2013 May 2023 &nbsp;<\/em><\/strong>Member, Resistance Test of Buoy Laying Vessel, GB Marine Pte Ltd, UTSB 2216.<\/li>\n\n\n\n<li><strong><em>Jul<\/em><\/strong><strong><em> 2022 \u2013 Oct 2022 &nbsp;<\/em><\/strong>Member, Bare Hull Model Test &#8211; Half Load Condition, Gading Marine Industry (M) Sdn Bhd.<\/li>\n\n\n\n<li><strong><em>Jul<\/em><\/strong><strong><em> 2022 \u2013 Oct 2022 &nbsp;<\/em><\/strong>Member, Bare Hull Model, Gading Marine Industry (M) Sdn Bhd.<\/li>\n\n\n\n<li><strong><em>May 2022 &#8211; Jan 2023 <\/em><\/strong>Principal Investigator, Feasibility Study and Testing of System Services, Malaysia Marine and Heavy Engineering, UTSB 1956 (2023).<\/li>\n\n\n\n<li><strong><em>Aug 2021 &#8211; Nov 2021 <\/em><\/strong>Member, Bare Hull Model Making and Resistance Test, Naval Arch Marine Sdn. Bhd.<\/li>\n\n\n\n<li><strong><em>Aug 2021 &#8211; Nov 2021 <\/em><\/strong>Member, Bare Hull Model Making and Resistance Test at Trim Conditions, Sandakan Jaya Teknik Sdn. Bhd.<\/li>\n\n\n\n<li><strong><em>Oct 2020 &#8211; Dec 2020 <\/em><\/strong>Member, Bare Hull Model Making and Resistance Test, Decagon Construction &amp; Services Ltd.<\/li>\n\n\n\n<li><strong><em>Aug 2020 &#8211; Dec 2020 <\/em><\/strong>Member, Bare Hull Resistance with and without Heating Effects.<\/li>\n\n\n\n<li><strong><em>Jul 2020 &#8211; Dec 2020<\/em><\/strong> Member, Model Test, Naval Arch Marine Sdn. Bhd.<\/li>\n\n\n\n<li><strong><em>Dec 2019 &#8211; Mac 2020<\/em><\/strong> Member, Model Test, Asia Marine Design Centre (AMDEC), Malaysia.<\/li>\n\n\n\n<li><strong><em>Oct 2019 &#8211; Feb 2020<\/em><\/strong> Member, Model Test, MISC Berhad, Malaysia, UTSB 1583 (2021).<\/li>\n\n\n\n<li><strong><em>Nov 2018 &#8211; Feb 2020<\/em><\/strong> Member, TAD and TLP Model Test, National University of Singapore.<\/li>\n\n\n\n<li><strong><em>Nov 2018 &#8211; Sep 2019<\/em><\/strong> Member, Simulation for intact, damage and dynamic conditions, TS Maritime Sdn. Bhd., Malaysia.<\/li>\n\n\n\n<li><strong><em>Aug 2018<\/em><\/strong>&nbsp; Member, Model Test (Resistance and Propulsion Test), Bangladesh.<\/li>\n\n\n\n<li><strong><em>Mar 2017<\/em><\/strong>&nbsp; Principal Investigator, Model Test (Resistance Test), Naval Arch Marine Sdn. Bhd., Malaysia.<\/li>\n\n\n\n<li><strong><em>May 2017 <\/em><\/strong>&nbsp;Member, Seakeeping Analysis (Resistance Test), Naval Arch Marine Sdn. Bhd., Malaysia.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":25524,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-768","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/henrykang\/wp-json\/wp\/v2\/pages\/768","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/henrykang\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/people.utm.my\/henrykang\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/henrykang\/wp-json\/wp\/v2\/users\/25524"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/henrykang\/wp-json\/wp\/v2\/comments?post=768"}],"version-history":[{"count":5,"href":"https:\/\/people.utm.my\/henrykang\/wp-json\/wp\/v2\/pages\/768\/revisions"}],"predecessor-version":[{"id":1089,"href":"https:\/\/people.utm.my\/henrykang\/wp-json\/wp\/v2\/pages\/768\/revisions\/1089"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/henrykang\/wp-json\/wp\/v2\/media?parent=768"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}