Project Leader, Assessing the Use of Artificial Intelligence as a Tool to Monitor Water Quality, Budget approved RM 50,000 (Vote 04M88 – MG2)
- Project Leader, An Analysis on Near Infrared Spectroscopy Device For Aluminium Thickness. Budget approved RM 10,000. (Vote 4C160).
- Project Member, Microstructured PDMS-Polyurethane Triboelectric Generator, Budget approved RM 21,200. (Vote 4C170).
- Project Member, Enhanced PDMS-Au Triboelectric Micro-Generator, Budget approved RM 20,000. (Vote 4C264).
- Project Member, Alternative Methods for Cross-Sectioning of SMT And PCB Related Architectures, Budget approved RM 286,125. (Vote 4C301).
- Project Member, Advanced Electrical Failure Analysis Methods and Processes in Electronics Manufacturing Industry, Budget approved RM 784,875. (Vote 4C300).
- Project Member, Reduction of Electromigration through by Cell Layout Optimization, Budget approved RM 136,500. (Vote 4C302).
- Project Member, Magnesium-AntimonyThermoelectric Micro-Generator, Budget approved RM 40,000. (Vote 4C371).
- Project Leader, Gas Leakage in Pipeline. Budget approved RM 10,000. (Vote 01M06).
- Project Member, Nanostructured PDMS Triboelectric Generator. Budget approved RM 10,000. (Vote 01M69).
- Project Member, Heat-Assisted Micro-Electrical Discharge
- Machining Of Silicon, Budget approved RM 20,000. (Vote 02M36).
- Project Member, Surface Acoustic Wave based Si Nanowire Gas Sensor, Budget approved RM 20,000. (Vote 02M33).
- Project Leader, Ultrasonic Dispersion System Design with Control Loop for Automatic Frequency Adjusting. Budget approved RM 117,600 (Vote 4L009).
- Project Member, lnvestigation of Faults Signiture Based on Polarization and Depolarization Current Pattern for Power Transformer lnsulation Oil. Budget approved RM 150,000 (Vote 4L014).
- Project Leader, Studies and analysis of optical system in measurement of fruit quality using near-infrared spectroscopy. Budget approved RM 50,000 (Vote 78503).
- Project Member, Investigation On Contact Less PH Measurement Scheme VIA Magnetic Induction Tomography. Budget approved RM 50,000 (Vote 4F254).
- Project Member, A Study and Analysis of Wireless Resonant Micro-Heaters: A Path for Wireless-Control of MEMS Actuators. Budget approved RM 80,000 (Vote 4F386).
- Project Member, Study on the mechanism of attenuation coefficients in sensitivity mapping of charge-coupled device image sensor using tomographic image reconstruction technique. Budget approved RM 72,000 (Vote 4F502).
- Project Leader, Correlation Study Between Physicochemical Property Changes With Breakdown Voltage Level of Palm-Based Power Transformer Insulation Oils at Difference Moisture Levels. Budget approved RM 130,000 (Vote 4F515).
- Project Member, A study of a new power controller algorithm based on transfer function model-based predictive control (TFMPC) for the research power generation nuclear reactor TRIGA, Budget approved RM 77,910 (Vote 4F968).
- Project Member, An Investigation of an Acoustic Technique to Monitor Insoluble Substances and Bubble Foaming ina Clear Juice Fruit Processing Line, Budget approved RM 60,000 (Vote 5F084).
- Project Leader, Determination of the Epidemiology and Source of Bacterial Contaminants in the Residential Water Pipeline System using Raman Spectroscopy, Budget approved RM78,800 (Vote 5F424)
- Project Leader, Studies and analysis of optical system in measurement of fruit quality using near-infrared spectroscopy. Budget approved RM 50,000 (Vote 78503).
- Project Member, Investigation On Contact Less PH Measurement Scheme VIA Magnetic Induction Tomography. Budget approved RM 50,000 (Vote 4F254).
- Project Member, A Study and Analysis of Wireless Resonant Micro-Heaters: A Path for Wireless-Control of MEMS Actuators. Budget approved RM 80,000 (Vote 4F386).
- Project Member, Study on the mechanism of attenuation coefficients in sensitivity mapping of charge-coupled device image sensor using tomographic image reconstruction technique. Budget approved RM 72,000 (Vote 4F502).
- Project Leader, Correlation Study Between Physicochemical Property Changes With Breakdown Voltage Level of Palm-Based Power Transformer Insulation Oils at Difference Moisture Levels. Budget approved RM 130,000 (Vote 4F515).
- Project Member, A study of a new power controller algorithm based on transfer function model-based predictive control (TFMPC) for the research power generation nuclear reactor TRIGA, Budget approved RM 77,910 (Vote 4F968).
- Project Member, An Investigation of an Acoustic Technique to Monitor Insoluble Substances and Bubble Foaming ina Clear Juice Fruit Processing Line, Budget approved RM 60,000 (Vote 5F084).
- Project Leader, Determination of the Epidemiology and Source of Bacterial Contaminants in the Residential Water Pipeline System using Raman Spectroscopy, Budget approved RM78,800 (Vote 5F424)
- Project Leader, Near Infrared Spectroscopy Instrumentation Prototype with Artificial Intelligent Prediction System for High Educational Institutions Lab-equipment. Budget approved RM 93,000 (Vote 4L606).
- Project Member, Development of Metal Particles Detector for High Voltage Gas Insulated Switchgear. Budget approved RM 94,000 (Vote 4L607).
- Project Member, Magnetic Induction Tomography Modality for Non-Destructive Evaluation of Embedded Steel in Reinforced Concrete Structure. Budget approved RM 73,700 (Vote 4X138).
- Project Member, Wireless MEMS Implantable Thermo-Pneumatic Drug-Delivery Device for Therapeutic Applications, Budget approved RM 92,220 (Vote 4L690).
- Project Member, Development of Ultrasonic Tomography For Composition Determination of Water and Oil Flow. Budget approved RM 147,993. (Vote 79024)
- Project Member, Magnetic Induction Tomography (MIT) For Low Conductivity Materials. Budget approved RM 125,500. (Vote 79024)
- Project Member, Development of Hybrid DGA Interpretation System For Power Transformer Condition Monitoring. Budget approved RM 63,100 (Vote 4S101).
- Project Member, Tomographic imaging instrumentation of pneumatic particle conveying using optical fibre sensors. Budget approved RM 244,000.
- Project Member, High speed data acquisition system for computer tomographic imaging instrumentation. Budget approved RM 259,000.
- Project Member, Development of a High-Accuracy Signal Conditioning and an Energy Storage System for a Thermo-electric Power Harvester System. Budget approved RM 73,000 (Vote 02G12).
- Project Member, Advanced FPGA implementation on Optical Tomography. Budget approved RM 25,000. (Vote 00M01).
- Project Member, Design A Wire Mesh Tomography System. Budget approved RM 20,000. (Vote 4J143). This project was awarded by RMC (won best presenter in GUP 2011 Colloqium, UTM, 30 March 2015).
- Project Leader, Generation of velocity profile of solid particle conveying in pneumatic conveyor. Budget approved RM 17,000 (Vote 71756 – Short Term Grant).
- Project Leader, Intelligent Automatic Door Lock. Budget approved RM 11,500 (Vote 71947 – Short Term Grant).
- Project Leader, Nondestructive measurements of fruit quality by means of NIR spectroscopy. Budget approved RM 10,000 (Vote 77902 – PAS Grant).
- Project Leader, Grasp Hand Approach to Detect Attentiveness and Fatigue of Driver Via Vibration System. (Vote 75253 – Institutional Grant).
- Project Leader, Smart Breathlyzer Enable Ignition Interlock System. (Vote 75254 – Institutional Grant).
- Project Leader, Determination of Brix Value and Acidity in Pineapple Fruits using Near-Infrared Spectroscopy. Budget approved RM 20,000 (Vote 77369 – Short Term Grant).
- Project Member, Condition Monitoring Of Biodegradable Oil-Filled Transformers Using Polarization And Depolarization Current (PDC) Measurement Technique. Budget approved RM 20,000 (Vote 77300 – Short Term Grant).
- Project Leader, Development of a low-cost near-infrared spectroscopy for fruits and vegetables quality characterization. Budget approved RM 144,000 (Vote 00H09 – GUP).
- Project Member, Modelling and Adaptive Control of a Fuel-Injection System. Budget approved RM 164,000 (Vote 01H48 – GUP).
- Project Member, A study to measure bubble velocity profile in liquid column using optical tomography technique. Budget approved RM 40,000 (Vote 00J04 – GUP).
- Project Member, Particle Detection In Gas Insulated Switchgear. Budget approved RM 40,000 (Vote 00J09 – GUP).
- Project Leader, An Investigation Of Thermal Distribution On Partial Discharge For Surge Arrester. Budget approved RM 80,000 (Vote 02H68 – GUP).
- Project Leader, Design and Implementation a Micro-Controller based High Power Ultrasonic Dispersion System with the Automatic Frequency Adjusting Property. Budget approved RM 100,000 (Vote 04H88 – GUP).
- Project Member, Development of High Resolution Tomographic Instrumentation System based on CMOS Area Image Sensor for Food Industry. Budget approved RM 150,000 (Vote 04H24 – GUP).
- Project Member, Ultrasonic Tomography System for Two-Phase Flow Imaging in Steel Column. Budget approved RM 150,000 (Vote 03H96 – GUP).
- Project Leader, Halal chicken progression monitoring using artificial intelligent technique. Budget approved RM 95,000 (Vote 00H09 – GUP).
- Project Member, Design and Implementation of a Nonlinear system Identification of a Two Wheel Inverted Pendulum. Budget approved RM 82,000 (Vote 05H40 – GUP).
- Project Member, Dual Modality Tomography Using UTT/ERT For Imaging Two Phase Liquid And Gas. Budget approved RM 84,900 (Vote 05H40 – GUP).
- Project Member, Design and Implementation of a Nonlinear system Identification of a Two Wheel Inverted Pendulum, Budget approved RM 82,000 (Vote 05H40 – GUP).
- Project Member, ON-Line Mineral Oil-Filled Transformer Overload Monitoring System. Budget approved RM 20,000 (Vote 08H65 – GUP).
- Project Leader, A Novel Transformer Fault Diagnosis Method Using Dielectric Response Techniques. Budget approved RM 50,000 (Vote 10H16 – GUP).
- Project Member, Electrical Resistance Tomography (ERT). Budget approved RM 49,500 (Vote 10H07 – GUP).
- Project Leader, Blood Glucose Monitoring and Classification Using Near Infrared Spectroscopy. Budget approved RM 50,000 (Vote 12H20 – GUP).
- Project Member, Optical Spectroscopy Based Sensing Configuration For A Low Cost Estimator Of Air Pollutant Gases. Budget approved RM 50,000 (Vote 11H49 – GUP).
- Project Leader, Early Screening of Leukemia using NIR Spectroscopy Via PLSR Model, Budget approved RM 50,000 (Vote 14H79 – GUP).
- Project Member, Wireless Metal Walled Vessel Ultrasonic System in Process Tomography. Budget approved RM 50,000 (Vote 14H80 – GUP).
- Project Leader, Free Fatty Acid Assessment of Crude Palm Oil using Near Infrared Spectroscopy. Budget approved RM 40,000 (Vote 18H22 – GUP).
- Project Leader, Analysis of Bacterial Contaminant in Skudai, Johor Tap Water Supply. Budget approved RM 50,000 (Vote 20H11 – GUP).
- Project Member, A novel electrical conductive metal organic framework supported on ceramic membranes for water purification, Budget approved RM 50,000 (Vote 19H79 – GUP).
- Project Leader, CRG 9.3 – Development Of A High-Efficiency Signal Conditioning And An Energy Storage System For A Thermo-Electric Power Harvester System, Budget approved RM 20,000 (Vote 05G02 – GUP – CRG).
- Project Member, CRG9: Metal Based Flexible Thermoelectric Microgenerator, Budget approved RM 160,000 (Vote 04G94 – GUP – CRG).
- Project Member, CRG10 Tomography Lab-On-Chip For Microsample Image Reconstruction, Budget approved RM 160,000 (Vote 05G01 – GUP – CRG).
- Project Member, CRG10.1 Electrode-Based Tomography Lab-On-Chip Design And Development, Budget approved RM 40,000 (Vote 04G93 – GUP – CRG).
- Project Leader, Bacterial Contaminants Detection In Tap Water Supply Using Iot-Based Raman Spectroscopy, Budget approved RM 100,000 (Vote 20H62 – GUP)
- Project Member, Development of All Metal Oxide Pervoskite Solar Cell, Budget approved RM 100,000 (Vote 20H63 – GUP)
- Project Member, IoT Based Noise Monitoring System in Residential Area, Budget approved RM 30,000 (Vote 17J70 – UTMER)
- Project Member, Application of Long Endurance Drone Technology for a Comprehensive Campus Security and Surveillance System, Budget approved RM 150,000 (Vote 08G57 – UTMHIR)
- Project Leader, Bacterial Contaminants Detection In Tap Water Supply Using Iot-Based Near Infrared Spectroscopy, Budget approved RM 150,000 (Vote 08G47 – UTMHIR)
- Project Member, Further studies on copper wire mesh sensor, Budget approved RM 56,000 (Vote 19J53 – UTMER)
- Project Member, Re-Expandable Nitinol IOT Smart Stent for Percutaneous Transluminal Angioplasty, Budget approved RM 80,000 (Vote 00L28 – UTMPR)
- Project Member, UTMIcon 3.4: Integrated Campus-Activities Monitoring System (ICAMS), Budget approved RM600,000 (Vote 09G58 – UTM RA ICONIC GRANT)
- Project Member, Development of Integrated Research Financial Process Model, Budget approved RM 593935.70 (Vote 4J440 – UTM R&D Fund)
- Project Leader, Study the Performance of Real Time Monitoring System on Non-invasive Chicken Meat Quality Assessment Using Near Infrared, Budget approved RM 100,000 (Vote 22H01 – UTMFR)
- Project Member, Composite dual layer PVDF hollow fiber membrane incorporated with responsive material for wastewater treatment, Budget approved RM 300,000 (Vote 00Q13 – Hi-Tech (F4))
- Project Leader, Assessing the Use of Artificial Intelligence as a Tool to Monitor Water Quality, Budget approved RM 50,000 (Vote 04M88 – MG2)