Project Leader, Assessing the Use of Artificial Intelligence as a Tool to Monitor Water Quality, Budget approved RM 50,000 (Vote 04M88 – MG2) 

  1. Project Leader, An Analysis on Near Infrared Spectroscopy Device For Aluminium Thickness. Budget approved RM 10,000. (Vote 4C160).
  2. Project Member, Microstructured PDMS-Polyurethane Triboelectric Generator, Budget approved RM 21,200. (Vote 4C170).
  3. Project Member, Enhanced PDMS-Au Triboelectric Micro-Generator, Budget approved RM 20,000. (Vote 4C264).
  4. Project Member, Alternative Methods for Cross-Sectioning of SMT And PCB Related Architectures, Budget approved RM 286,125. (Vote 4C301).
  5. Project Member, Advanced Electrical Failure Analysis Methods and Processes in Electronics Manufacturing Industry, Budget approved RM 784,875. (Vote 4C300).
  6. Project Member, Reduction of Electromigration through by Cell Layout Optimization, Budget approved RM 136,500. (Vote 4C302).
  7. Project Member, Magnesium-AntimonyThermoelectric Micro-Generator, Budget approved RM 40,000. (Vote 4C371).
  8. Project Leader, Gas Leakage in Pipeline. Budget approved RM 10,000. (Vote 01M06).
  9. Project Member, Nanostructured PDMS Triboelectric Generator. Budget approved RM 10,000. (Vote 01M69).
  10. Project Member, Heat-Assisted Micro-Electrical Discharge
  11. Machining Of Silicon, Budget approved RM 20,000. (Vote 02M36).
  12. Project Member, Surface Acoustic Wave based Si Nanowire Gas Sensor, Budget approved RM 20,000. (Vote 02M33).
  1. Project Leader, Ultrasonic Dispersion System Design with Control Loop for Automatic Frequency Adjusting. Budget approved RM 117,600 (Vote 4L009).
  2. Project Member, lnvestigation of Faults Signiture Based on Polarization and Depolarization Current Pattern for Power Transformer lnsulation Oil. Budget approved RM 150,000 (Vote 4L014).
  3. Project Leader, Studies and analysis of optical system in measurement of fruit quality using near-infrared spectroscopy. Budget approved RM 50,000 (Vote 78503).
  4. Project Member, Investigation On Contact Less PH Measurement Scheme VIA Magnetic Induction Tomography. Budget approved RM 50,000 (Vote 4F254).
  5. Project Member, A Study and Analysis of Wireless Resonant Micro-Heaters: A Path for Wireless-Control of MEMS Actuators. Budget approved RM 80,000 (Vote 4F386).
  6. Project Member, Study on the mechanism of attenuation coefficients in sensitivity mapping of charge-coupled device image sensor using tomographic image reconstruction technique. Budget approved RM 72,000 (Vote 4F502).
  7. Project Leader, Correlation Study Between Physicochemical Property Changes With Breakdown Voltage Level of Palm-Based Power Transformer Insulation Oils at Difference Moisture Levels. Budget approved RM 130,000 (Vote 4F515).
  8. Project Member, A study of a new power controller algorithm based on transfer function model-based predictive control (TFMPC) for the research power generation nuclear reactor TRIGA, Budget approved RM 77,910 (Vote 4F968).
  9. Project Member, An Investigation of an Acoustic Technique to Monitor Insoluble Substances and Bubble Foaming ina Clear Juice Fruit Processing Line, Budget approved RM 60,000 (Vote 5F084).
  10. Project Leader, Determination of the Epidemiology and Source of Bacterial Contaminants in the Residential Water Pipeline System using Raman Spectroscopy, Budget approved RM78,800 (Vote 5F424)
  11. Project Leader, Studies and analysis of optical system in measurement of fruit quality using near-infrared spectroscopy. Budget approved RM 50,000 (Vote 78503).
  12. Project Member, Investigation On Contact Less PH Measurement Scheme VIA Magnetic Induction Tomography. Budget approved RM 50,000 (Vote 4F254).
  13. Project Member, A Study and Analysis of Wireless Resonant Micro-Heaters: A Path for Wireless-Control of MEMS Actuators. Budget approved RM 80,000 (Vote 4F386).
  14. Project Member, Study on the mechanism of attenuation coefficients in sensitivity mapping of charge-coupled device image sensor using tomographic image reconstruction technique. Budget approved RM 72,000 (Vote 4F502).
  15. Project Leader, Correlation Study Between Physicochemical Property Changes With Breakdown Voltage Level of Palm-Based Power Transformer Insulation Oils at Difference Moisture Levels. Budget approved RM 130,000 (Vote 4F515).
  16. Project Member, A study of a new power controller algorithm based on transfer function model-based predictive control (TFMPC) for the research power generation nuclear reactor TRIGA, Budget approved RM 77,910 (Vote 4F968).
  17. Project Member, An Investigation of an Acoustic Technique to Monitor Insoluble Substances and Bubble Foaming ina Clear Juice Fruit Processing Line, Budget approved RM 60,000 (Vote 5F084).
  18. Project Leader, Determination of the Epidemiology and Source of Bacterial Contaminants in the Residential Water Pipeline System using Raman Spectroscopy, Budget approved RM78,800 (Vote 5F424)
  19. Project Leader, Near Infrared Spectroscopy Instrumentation Prototype with Artificial Intelligent Prediction System for High Educational Institutions Lab-equipment. Budget approved RM 93,000 (Vote 4L606).
  20. Project Member, Development of Metal Particles Detector for High Voltage Gas Insulated Switchgear. Budget approved RM 94,000 (Vote 4L607).
  21. Project Member, Magnetic Induction Tomography Modality for Non-Destructive Evaluation of Embedded Steel in Reinforced Concrete Structure. Budget approved RM 73,700 (Vote 4X138).
  22. Project Member, Wireless MEMS Implantable Thermo-Pneumatic Drug-Delivery Device for Therapeutic Applications, Budget approved RM 92,220 (Vote 4L690).
  23. Project Member, Development of Ultrasonic Tomography For Composition Determination of Water and Oil Flow. Budget approved RM 147,993. (Vote 79024)
  24. Project Member, Magnetic Induction Tomography (MIT) For Low Conductivity Materials. Budget approved RM 125,500. (Vote 79024)
  25. Project Member, Development of Hybrid DGA Interpretation System For Power Transformer Condition Monitoring. Budget approved RM 63,100 (Vote 4S101).
  26. Project Member, Tomographic imaging instrumentation of pneumatic particle conveying using optical fibre sensors. Budget approved RM 244,000.
  27. Project Member, High speed data acquisition system for computer tomographic imaging instrumentation. Budget approved RM 259,000.
  28. Project Member, Development of a High-Accuracy Signal Conditioning and an Energy Storage System for a Thermo-electric Power Harvester System. Budget approved RM 73,000 (Vote 02G12).
  29. Project Member, Advanced FPGA implementation on Optical Tomography. Budget approved RM 25,000. (Vote 00M01).
  30. Project Member, Design A Wire Mesh Tomography System. Budget approved RM 20,000. (Vote 4J143). This project was awarded by RMC (won best presenter in GUP 2011 Colloqium, UTM, 30 March 2015).
  1. Project Leader, Generation of velocity profile of solid particle conveying in pneumatic conveyor. Budget approved RM 17,000 (Vote 71756 – Short Term Grant).
  2. Project Leader, Intelligent Automatic Door Lock. Budget approved RM 11,500 (Vote 71947 – Short Term Grant).
  3. Project Leader, Nondestructive measurements of fruit quality by means of NIR spectroscopy. Budget approved RM 10,000 (Vote 77902 – PAS Grant).
  4. Project Leader, Grasp Hand Approach to Detect Attentiveness and Fatigue of Driver Via Vibration System. (Vote 75253 – Institutional Grant).
  5. Project Leader, Smart Breathlyzer Enable Ignition Interlock System. (Vote 75254 – Institutional Grant).
  6. Project Leader, Determination of Brix Value and Acidity in Pineapple Fruits using Near-Infrared Spectroscopy. Budget approved RM 20,000 (Vote 77369 – Short Term Grant).
  7. Project Member, Condition Monitoring Of Biodegradable Oil-Filled Transformers Using Polarization  And Depolarization Current (PDC)  Measurement Technique. Budget approved RM 20,000 (Vote 77300 – Short Term Grant).
  8. Project Leader, Development of a low-cost near-infrared spectroscopy for fruits and vegetables quality characterization. Budget approved RM 144,000 (Vote 00H09 – GUP).
  9. Project Member, Modelling and Adaptive Control of a Fuel-Injection System. Budget approved RM 164,000 (Vote 01H48 – GUP).
  10. Project Member, A study to measure bubble velocity profile in liquid column using optical tomography technique. Budget approved RM 40,000 (Vote 00J04 – GUP).
  11. Project Member, Particle Detection In Gas Insulated Switchgear. Budget approved RM 40,000 (Vote 00J09 – GUP).
  12. Project Leader, An Investigation Of Thermal Distribution On Partial Discharge For Surge Arrester. Budget approved RM 80,000 (Vote 02H68 – GUP).
  13. Project Leader, Design and Implementation a Micro-Controller based High Power Ultrasonic Dispersion System with the Automatic Frequency Adjusting Property. Budget approved RM 100,000 (Vote 04H88 – GUP).
  14. Project Member, Development of High Resolution Tomographic Instrumentation System based on CMOS Area Image Sensor for Food Industry. Budget approved RM 150,000 (Vote 04H24 – GUP).
  15. Project Member, Ultrasonic Tomography System for Two-Phase Flow Imaging in Steel Column. Budget approved RM 150,000 (Vote 03H96 – GUP).
  16. Project Leader, Halal chicken progression monitoring using artificial intelligent technique. Budget approved RM 95,000 (Vote 00H09 – GUP).
  17. Project Member, Design and Implementation of a Nonlinear system Identification of a Two Wheel Inverted Pendulum. Budget approved RM 82,000 (Vote 05H40 – GUP).
  18. Project Member, Dual Modality Tomography Using UTT/ERT For Imaging Two Phase Liquid And Gas. Budget approved RM 84,900 (Vote 05H40 – GUP).
  19. Project Member, Design and Implementation of a Nonlinear system Identification of a Two Wheel Inverted Pendulum, Budget approved RM 82,000 (Vote 05H40 – GUP).
  20. Project Member, ON-Line Mineral Oil-Filled Transformer Overload Monitoring System. Budget approved RM 20,000 (Vote 08H65 – GUP).
  21. Project Leader, A Novel Transformer Fault Diagnosis Method Using Dielectric Response Techniques. Budget approved RM 50,000 (Vote 10H16 – GUP).
  22. Project Member, Electrical Resistance Tomography (ERT). Budget approved RM 49,500 (Vote 10H07 – GUP).
  23. Project Leader, Blood Glucose Monitoring and Classification Using Near Infrared Spectroscopy. Budget approved RM 50,000 (Vote 12H20 – GUP).
  24. Project Member, Optical Spectroscopy Based Sensing Configuration For A Low Cost Estimator Of Air Pollutant Gases. Budget approved RM 50,000 (Vote 11H49 – GUP).
  25. Project Leader, Early Screening of Leukemia using NIR Spectroscopy Via PLSR Model, Budget approved RM 50,000 (Vote 14H79 – GUP).
  26. Project Member, Wireless Metal Walled Vessel Ultrasonic System in Process Tomography. Budget approved RM 50,000 (Vote 14H80 – GUP).
  27. Project Leader, Free Fatty Acid Assessment of Crude Palm Oil using Near Infrared Spectroscopy. Budget approved RM 40,000 (Vote 18H22 – GUP).
  28. Project Leader, Analysis of Bacterial Contaminant in Skudai, Johor Tap Water Supply. Budget approved RM 50,000 (Vote 20H11 – GUP).
  29. Project Member, A novel electrical conductive metal organic framework supported on ceramic membranes for water purification, Budget approved RM 50,000 (Vote 19H79 – GUP).
  30. Project Leader, CRG 9.3 – Development Of A High-Efficiency Signal Conditioning And An Energy Storage System For A Thermo-Electric Power Harvester System, Budget approved RM 20,000 (Vote 05G02 – GUP – CRG).
  31. Project Member, CRG9: Metal Based Flexible Thermoelectric Microgenerator, Budget approved RM 160,000 (Vote 04G94 – GUP – CRG).
  32. Project Member, CRG10 Tomography Lab-On-Chip For Microsample Image Reconstruction, Budget approved RM 160,000 (Vote 05G01 – GUP – CRG).
  33. Project Member, CRG10.1 Electrode-Based Tomography Lab-On-Chip Design And Development, Budget approved RM 40,000 (Vote 04G93 – GUP – CRG).
  34. Project Leader, Bacterial Contaminants Detection In Tap Water Supply Using Iot-Based Raman Spectroscopy, Budget approved RM 100,000 (Vote 20H62 – GUP)
  35. Project Member, Development of All Metal Oxide Pervoskite Solar Cell, Budget approved RM 100,000 (Vote 20H63 – GUP)
  36. Project Member, IoT Based Noise Monitoring System in Residential Area, Budget approved RM 30,000 (Vote 17J70 – UTMER)
  37. Project Member, Application of Long Endurance Drone Technology for a Comprehensive Campus Security and Surveillance System, Budget approved RM 150,000 (Vote 08G57 – UTMHIR)
  38. Project Leader, Bacterial Contaminants Detection In Tap Water Supply Using Iot-Based Near Infrared Spectroscopy, Budget approved RM 150,000 (Vote 08G47 – UTMHIR)
  39. Project Member, Further studies on copper wire mesh sensor, Budget approved RM 56,000 (Vote 19J53 – UTMER)
  40. Project Member, Re-Expandable Nitinol IOT Smart Stent for Percutaneous Transluminal Angioplasty, Budget approved RM 80,000 (Vote 00L28 – UTMPR)
  41. Project Member, UTMIcon 3.4: Integrated Campus-Activities Monitoring System (ICAMS), Budget approved RM600,000 (Vote 09G58 – UTM RA ICONIC GRANT)
  42. Project Member, Development of Integrated Research Financial Process Model, Budget approved RM 593935.70 (Vote 4J440 – UTM R&D Fund)
  43. Project Leader, Study the Performance of Real Time Monitoring System on Non-invasive Chicken Meat Quality Assessment Using Near Infrared, Budget approved RM 100,000 (Vote 22H01 – UTMFR)
  44. Project Member, Composite dual layer PVDF hollow fiber membrane incorporated with responsive material for wastewater treatment, Budget approved RM 300,000 (Vote 00Q13 – Hi-Tech (F4))
  45. Project Leader, Assessing the Use of Artificial Intelligence as a Tool to Monitor Water Quality, Budget approved RM 50,000 (Vote 04M88 – MG2)