Consultancies

 

1. Project Name: Load Test on Elements and Roof Truss of Coldformed Steel
Year:
2007 – 2008
Client: Koperasi Nusajaya Sdn. Bhd.
Project Leader: Prof. Dr. Abd. Latif Salleh
DSC04866
2. Project Name: Concrete Material Tests for the RC Structures of the Stadium of Sultan Mizan Zainal Abidin, Kuala Terengganu
Year: 2009
Client: Department of Safety and Health Malaysia
Project Leader: Prof. Dr. Abd. Latif Salleh
IMG_0749
3. Project Name: Structural Assessment of Pulai View Apartment
Year: 2010
Client: Pulai View Sdn. Bhd.
Project Leader: Prof. Ir. Dr. Mohd. Hanim Osman
 23112010018
4. Project Name: Forensic Investigation on the Collapse Ramp at Jambatan Kedua Pulau Pinang
Year: 2013
Client: Department of Safety and Health Malaysia
Project Leader: Prof. Ir. Dr. Mohd. Hanim Osman
IMG_5786
5. Project Name: Forensic Investigation and Testing on Loji Rawatan Kumbahan Pantai 1, Kuala Lumpur
Year: 2014
Client: Indah Water Konsurtium Sdn. Bhd.
Project Leader: Prof. Dr. Mohammad Ismail
IMG_0249
6. Project Name: IBS Design for IPD Nusajaya
Year: 2013-2014
Client: Leaderscope Consultant & Department of Works Malaysia (JKR)
Project Leader: Assoc. Prof. Dr. Ahmad Baharuddin Abd. Rahman
IPD Ground Floor
7. Project Name: Structural Assessment on the Collapse Shop Houses Building at Kukup, Pontian
Year: 2013-2014
Client: Majlis Perbandaran Pontian
Project Leader: Prof. Ir. Dr. Mohd. Hanim Osman
IMG_6317
8. Project Name: Laboratory Testing and Investigation on Pump House at Sungai Segget
Year: 2014
Client: Konsurtium Paduan – RAR & Iskandar Regional Development Authority (IRDA)
Project Leader: Dr. Izni Syahrizal Ibrahim
IMG_6904
 9. Project Name: Load Test, Material Testing and Non-Destructive Test (NDT) at SMK Taman Scientex
Year: 2015
Client: RSM Builders Sdn. Bhd.
Project Leader: Dr. Izni Syahrizal Ibrahim
 IMG_7908
10. Project Name: Concrete Compressive Strength & Cracking Investigation on Concrete Slab using NDT
Year: 2016
Client: Pamir Development Sdn. Bhd.
Project Leader: AP Dr. Izni Syahrizal Ibrahim
11. Project Name: Material Testing & Structural Performance of Reinforced Concrete Structures
Year: 2016
Client: Kimberly Clarck Products (M) Sdn. Bhd.
Project Leader: AP Dr. Izni Syahrizal Ibrahim
12. Project Name: NDT and Windsor Probe Test at Centre of Excellence for Rubber, Lembaga Getah Malaysia
Year: 2017
Client: Lembaga Getah Malaysia
Project Leader: AP Dr. Izni Syahrizal Ibrahim
13. Project Name: Building Condition Assessment (BCA) at Balai Zaharah, Johor Bahru
Year: 2017
Client: Anjung Teknik Sdn. Bhd.
Project Leader: Prof. Ir. Dr. Mohd. Hanim Osman
14. Project Name: Rebound Hammer, Material & Soil Testing at CICT, UTM
Year: 2017
Client: Jurutera Perunding Industri Sdn. Bhd.
Project Leader: AP Dr. Izni Syahrizal Ibrahim
15. Project Name: NDT at TNB Transmission Tower, Felda Semanchu
Year: 2017
Client: Trenergy Infrastructure Sdn. Bhd.
Project Leader: AP Dr. Izni Syahrizal Ibrahim
16. Project Name: Full Scale Load Test at Bangunan Sultan Ibrahim, Johor Bahru
Year: 2018
Client: Perantara Trading
Project Leader: AP Dr. Izni Syahrizal Ibrahim
17. Project Name: Crack Monitoring & Structural Assessment at Sultan Ibrahim Reservoir Pulai
Year: 2018
Client: Syarikat Air Johor (SAJ)
Project Leader: Dr. Mohd. Azreen Mohd. Ariffin
18. Project Name: Cracking Investigation at Petrol Station Building
Year: 2018
Client: Perunding Arafah
Project Leader: AP Dr. Izni Syahrizal Ibrahim
19. Project Name: Vibration and Noise Monitoring using Hydraulic Hammerfor Piling at Pulai Jaya New School Construction Site, Kulai Jaya
Year: 2018
Client: Struktur Serumpun Sdn. Bhd.
Project Leader: AP Dr. Norhisham Bakhary
20. Project Name: Investigation on the Hollow Core Slabs for the Construction of Quarters at Cure & Care Rehabilitation Centre (CCRC) Kota Tinggi, Johor
Year: 2018
Client: Majidee (Holdings) Sdn. Bhd.
Project Leader: Dr. Noor Nabilah Sarbini
21. Project Name: Forensic Investigation on Cooling Tower at Rapid Project
Year: 2018
Client: TTCL Malaysia Sdn. Bhd.
Project Leader: Dr. Ma Chau Khun
22. Project Name: Material Testing and Crack Width Inspection
Year: 2019
Client: JKP Sdn. Bhd.
Project Leader: AP Dr. Izni Syahrizal Ibrahim
23. Project Name: Forensic Investigation on Structural Cracking of Shop Office
Year: 2019
Client: AK Consult
Project Leader: AP Dr. Izni Syahrizal Ibrahim