National: RM 799,800
(Networking Grant)
Date | Title | Vot Num. | Amount | ||
1. | 22/01/2018-31/12/2018 | Smart Window: The New Generation of Concentrating Solar Photovoltaic System | 4J315
(DPUTMRAZAK) |
RM 65,000 | |
2. | 20/08/2017-19/02/2018 | The Double Resonance of High Speed Timoshenko’s Shaft System With Torsional Effect | 14J90 (Tier 2) | RM 15,300 | |
3. |
01/02/2018-30/04/2019 |
Safety Security Management Plan To Curb Football Fans Hooliganism At Stadium | 4J297
(DPUTMRAZAK) |
RM 32,000 | |
4. | 01/08/2017 31/07/2019 | Design, Fabrication And Installation Of Ram-Pump To Be Used By Orang Asli In Remote Area | 4J299
(DPUTMRAZAK) |
RM 32,000 | |
5. | 01/07/2017- 30/09/2018 | Modelling Of Interface Particle Bonding On End Of Life (Eol) Vehicle Parts Substrate Using Hvof Thermal Spray Coating | 14J05(Tier 2) | RM 20,000 | |
6. | 01/07/2017- 30/06/2019 | Investigate Of Sustainability Hybrid Renewable Energy System: Ocean Current Turbine & Solar Power System Electrification On One Fathom Bank Malaysia | 17H56Tier 1 | RM 40,000 | |
7. | 01/07/2017-30/06/2019 | Fundamental Development Of Low Cost Highly Efficient Solar Photovoltaic System Via Mathematical Simulation Of Newly Designed Solar Concentrator | 16H95Tier 1 | RM 40,000 | |
8. | 01/10/2016-30/09/2018 | Closure Effect Of Welding Residual Stress In Penetration Nozzles Of Pressure Vessel | 15H36 Tier 1 | RM 40,000 | |
9. | 01/10/2016-30/09/2018
|
Feasibility Study Aiming At Identifying The Potential Opportunities Of Developing A Pioneer Underwater Ocean Turbines Power Plant On The One Fathom Bank | 15H31 Tier 1 | RM 40,000 | |
10. | 01/05/2016-30/04/2018 | Development Of Maerogel/Epoxy Composite for Sustainable Thermal Insulation Applications | 4S132SF | RM 146,500 | |
11 | 01/01/2017 -31/12/2017 | Impact Of Fun Learning Toy Library For Stem Education At Sek. Keb. Seneng Bachok Kelantan | 4X313NG | RM 13,000 | |
12. | 01/11/2016-31/10/2017
|
Kelestarian Transformasi Pembangunan Sosio-Ekonomi Penduduk Kampung Sg. Tiang, Hutan Simpan Royal Belum | 4L201 | RM 64,000 | |
13. | 01/11/2016 -31/10/2017 | Development Of Stem Fun Learning Toy Library For Sek. Keb. Kuala Geris Dabong Kelantan | 4X175 | RM 20,000 | |
14. | 05/04/2017-05/04/2017 | Membangunkan Mikro Turbin Banki Secara Lestari Bagi Mempertingkatkan Taraf Hidup Serta Eko-Pelancongan Dikampung Sungai Tiang,Taman Negeri Royal Belum | 4L192 | RM 100,000 | |
15. | 01/12/2014-30/11/2016 | The Effect Of Pla Matrix Architecture On The Mechanical Performance Od Pla Based Degradable Biocomposite | 4X007 NG | RM 52,000 | |
16. | 01/05/2015-31/07/2017 | Kinesthetic Approach To Validate Work Movement Task Analysis Observational Tool | 10J96 Tier 2 E | RM 20,000 | |
17. | 30/06/2000 – 29/06/2001 | Stress Analysis Of Laminated Composite Plates With Embedded Shape Memory Alloy (Sma) Using Finite Element Method | 75112 ST | RM 20,000 | |
18. | 01/10/2016-31/12/2017 | Acoustical Performance Of Kenaf/Polypropelene Composite As A High Acoustic Absorber At Aircraft Hangar | 12J12 Tier 2 | RM 20,000 | |
19. | 01/10/2016-31/12/2017 | Investigation Of Best Parameters To Obtain Optimal Performance Of Fully Functioned Crossflow Micro-Turbine To Be Used By Orang Asli In Remote Area | 12J01 Tier 2 | RM 20,000 | |
Total | RM 799,800 |