Fundamental Research Grant Scheme

  1. Project Member, ‘Corrosion Assessment Standard For Inspection Data To Evaluate The Remaining Lifetime Of Corroding Structures’ – UTM & MOHE (2007-2009). Budget approved RM 112,000 (Vot 79143).
  1. Project Member, ‘Statistical Modelling Of Corrosion Growth In Marine Environment’ – UTM & MOHE (2007-2009). Budget approved RM 93,600 (Vot 78188).
  1. Project Member, ‘Fundamental Study On The Extreme Growth Behaviour Of External Corrosion Pit In Burried Gas Pipelines (Malaysian Transmission Lines)’ – UTM & MOHE (2008-2010). Budget approved RM 84,000 (Vot 78351).
  1. Project Member, ‘Derivation Of Damping Factors Of A Mass Within Rubber Compound To Reduce Seismic Response Of Pendulum Type Structures Using Seismograph Concept’ – UTM & MOHE (2015-2017). Budget approved RM 86,200 (Vot R.J130000.7822.4F732).
  1. Project Leader, ‘Derivation Model Of Dynamic Displacement Measurement Between GPS And An Accelerometer For Bridge Monitoring’ – UTM & MOHE (2016-2018). Budget approved RM 80,000 (FRGS/1/2016/TK01/UTM/02/6).