Research Project as Principal Investigator
BIL |
NAME OF GRANT |
CATEGORY OF GRANT (UTM/ OTHERS) |
TYPE OF GRANT |
AMOUNT (RM) |
1 |
Analyzing the Impact of Different Axial Slats Configurations on Vortex-Induced Vibration of Single and Multiple Risers using Machine Learning |
UTM |
UTMFR |
130,000 |
2 |
Design and Fabrication of Depth Trawl System for Floating Marine Plastic Debris Monitoring at Klang River |
International |
Contract Research |
62,000 |
3 |
Machine Learning in Predicting the number of Floating Plastic Debris at Rivers |
UTM |
Industry-International Incentive Grant |
20,000 |
4 |
Floating Plastic Debris Monitoring in Marine Area and its Implication of Ocean Cleanup Technologies at Langat River |
International |
Contract Research |
80,232 |
5 |
Studying the effectiveness of vortex-induced vibration in disrupting the cell wall of microalgae for oil extraction |
National |
Fundamental Research Grant Scheme (FRGS) |
83,200 |
6 |
CRG 41.2: Bulk Separation Of Fats, Oil And Grease (Fog) From Food Processing Industry Effluent Using Inactive And Active Trap |
National |
Collaborative Research Grant National (CRG) |
20,000 |
7 |
Machine learning in forecasting the vortex-induced vibration of riser |
UTM |
Industry-International Incentive Grant |
10,000 |
8 |
suppression of vortex-induced vibration of low mass ratio circular cylinder using shroud |
International |
JICA |
180,000 |
9 |
Machine learning in predicting the vortex-induced vibration of riser for fundamental data preparation of MR damper. |
International |
Others |
20023.50 |
10 |
Vortex-Induced Vibration Of Multiple Cylinders Attached With Helical Strakes |
UTM |
Tier 1 |
50,000 |
11 |
Heat transfer over a porous rotating disk |
UTM |
Tier 2 |
20,000 |
12 |
Fluid-structure interaction of flexible cylinder through numerical simulation |
UTM |
Potential Academic Staff |
20,000 |
Research Project as scientific member
BIL |
NAME OF GRANT |
CATEGORY OF GRANT(UTM/OTHERS) |
TYPE OF GRANT |
AMOUNT (RM) |
1 |
Health Monitoring & Integrity Assessment Of Ageing Assets FASA 2- MG |
UTM |
HICOE Research Grant |
30,000 |
2 |
Advanced Health Monitoring For Turbomachinery Phase 2 – MG |
UTM |
HICOE Research Grant |
30,000 |
3 |
Health Monitoring & Integrity Assessment Of Ageing Assets |
UTM |
HICOE Research Grant |
200,000 |
4 |
Artificial Mangrove Pneumatophores for Cleaning up Anthropogenic Marina Debris |
International |
Others |
10,000 |
5 |
River Efficacy Assessment for Floating Marine Plastic Debris at Klang River using Hydrophone Array |
International |
Others |
29,731 |
6 |
Installation and Maintenance of River Monitoring System for In-Situ Automatic Visual Monitoring of Floating Marine Plastic Debris at Klang River |
International |
Contract |
30,850 |
7 |
Network for Marine Traffic Information Exchange in Malaysian Shipping Industry for a Safer and Sustainable Ocean |
International |
Contract |
53,804.62 |
8 |
Interceptor 002 Barrier Assessment at Klang River using UAV and Geospatial Technologies |
International |
Others |
15,400 |
9 |
Floating Plastic Debris Monitoring in Marine Area and Its Implication of Ocean Cleanup Technologies using Low-Cost Unmanned Air Vehicle (UAV) |
International |
Contract |
20,500 |
10 |
Floating Plastic Debris Monitoring in Marine Area and Its Implication of Ocean Cleanup Technologies at Skudai River and Tebrau River |
International |
Contract |
74,504 |
11 |
Aerial inspection of floating plastic debris at Klang river using UAV for deployment of Interceptor systems |
International |
Contract |
55,455 |
12 |
Innovative teaching and learning strategies in open modelling and simulation environment for student-centered engineering education / InMotion |
International |
Contract |
474,467.41 |
13 |
CRG 41.0: Development Of An Effective Integrated System For Fat, Oil And Grease (Fog) Treatment From Food Processing Industry Effluent |
National |
Collaborative Research Grant |
100,000 |
14 |
Automated Floating Plastic Debris Detection and Identification in Coastal Regions using Low-Cost Unmanned Air Vehicle (UAV) |
UTM |
Industry-International Incentive Grant |
15,000 |
15 |
Air Flow Evaluation for Conceptual Design of Automotive Painting Line Using Computational Fluid Dynamic (CFD) for Better Dust Particle Reduction |
National |
Fundamental Research Grant Scheme |
45,400 |
16 |
Application Of Variable Stiffness System With Magneto-Rheological Damper For Model Test In Towing Tank |
UTM |
Potential Academic Staff |
20,000 |
17 |
Cloud Optical Depth Retrieval via Infrared Radiation Analysis for Solar Radiation Prediction |
International |
Others |
100,000 |
18 |
Graph Theoretic Structure Of Cluster Centres Interactions Of Flat Electroencephalography During Epileptic Seizure |
UTM |
Tier 1 |
40,000 |
19 |
Synthesis Of Copper Oxide Supported Mesostructured Silica Nanoparticles Photocatalyst For Dyes Wastewater Treatment |
UTM |
Potential Academic Staff |
20,000 |
20 |
Reassessment Of The In-Service Offshore Structures By Accounting The Effect Of Wave-In-Deck |
UTM |
Tier 1 |
40,000 |
21 |
Numerical Wave Tank For Hydrodynamic Analysis Of Ship Resistance In Waves |
UTM |
COE Research Grant |
50,000 |
22 |
Study On The Effect Of Hybrid Mooring Line To The Motion Response Of Floating Structure |
UTM |
Potential Academic Staff |
20,000 |
23 |
Element Free Galerkin Method For Ray Propulsion Mechanism |
Interntional Grant |
Networking Grant |
23,000 |
24 |
Experimental Analysis Of Semi Active Magneto-Rheological Damper And Applications In Offshore Engineering |
International |
Others |
20,000 |
25 |
UTMTDR22.4(T2) Tribological Analysis of RTES Operated for Long Duration |
UTM |
UTM Transdiciplinary Research Grant |
30,000 |
26 |
Suppression Of Lng Sloshing During Ship-To-Ship Operation By Artificial Damping From Magneto-Rheological Based Synthetic Foam Floating Baffles |
UTM |
Industry-International Incentive Grant |
10,000 |
27 |
The effect of secondary hydrofoil rod form and attack angle for vortex induced vibration suppression |
National |
Fundamental Research Grant Scheme |
83,410 |
28 |
PPRN _2_2021 MOHE : Mee Siput Making Machine |
National |
Demand-Driven Innovation |
30,150 |
29 |
PPRN _2_2021 Ind : Mee Siput Making Machine |
National |
Contract Research DTD |
3,350 |
30 |
Floating Microalgal Bio-photovoltaic System as Sustainable Power Source for Marine Plastic Cleanup Technologies in the Ocean |
UTM |
Industry-International Incentive Grant |
20,000 |
31 |
Airborne Particle Dispersion and Characteristics Study and Impact on Indoor Environment for Ensuring Well-Being of Communities |
International |
Contract |
5,000 |
32 |
Unmanned surface vehicle assisted bathymetry survey at Skudai river and Tebrau river for feasible utilization of Interceptor systems |
International |
Contract |
20,568.52 |
33 |
Hydrodynamic Analysis and Mooring Configuration of Floating Solar Panels in Malaysia Offshore Environment |
International |
Contract Research DTD |
41,810 |
34 |
Conceptualization of Industry 4.0-based Yard Layout as Game-Changer for Upcoming Offshore Platforms Decommissioning Challenge in Malaysia |
UTM |
UTMFR |
59,700 |
Consultancy Project
No. |
Year |
Title |
Value |
1. |
2/5/24 – 2/11/24 |
In-Situ Visual Counting Of Floating Plastic Debris For Catch Monitoring And River Efficacy Monitoring In Klang Interceptor 002 (Project Leader) |
RM4,843.80 |
2. |
15/5/23 – 15/5/24 |
Train The Trainer For Ai Labs Sdn Bhd (Project Leader) |
RM20,000 |
3. |
30/01/23 – 21/02/23 |
On-Site Consultancy And Facilities Support For River Efficacy Assessment For Floating Marine Plastic Debris At Klang River (Project Leader) |
RM15,755 |
4. |
25/10/21-26/12/21 |
Kursus Intermediate Acoustic Engineering And Applications (Project Leader) |
RM15,000 |
5. |
1/10/24-30/6/25 |
Kajian Feasibility Rasionalisasi Program Tvet (Member) |
RM499,986.54 |
6. |
13/6/24-12/12/24 |
River Floating Plastic Debris Monitoring Using Unmanned Aerial Vehicle (Member) |
RM6,881 |
7. |
1/3/23-31/7/23 |
Images Processing Using Artificial Intelligence And Rms Dismantlement And Re-Installation (Member) |
RM8,300 |
8. |
1/1/23-31/12/23 |
Acoustic Consultancy For Tnb Bangsar Hq – Phase 2 Claim No. 3 (Member) |
RM114,000 |
9. |
1/1/22-29/12/22 |
Acoustic Consultancy For Sunway Medical Centre Damansara (Smcd) Claim No 1 (Member) |
RM 42,500 |
10. |
1/1/22-29/12/22 |
Ace Buliding, Bank Negara Project Acoustic Testing Services (Member) |
RM70,000 |
11. |
1/1/22-29/12/22 |
Acoustic Consultancy For Tnb Bangsar Hq – Phase 2 Claim No 2 (Member) |
RM137,750 |
12. |
1/1/20-30/12/20 |
Rectification Work – Acoustic & Vibration – Transformer Room (Member) |
RM47,500 |
13. |
1/1/20-31/12/20 |
Acoustics Vibration Engineering Consultant With Bbcc (Member) |
RM100,000 |
14. |
1/1/20-31/12/20 |
Project Imu Hospital Bukit Jalil Kuala Lumpur (Member) |
RM6,075 |
15. |
1/1/20-31/12/20 |
Acoustic Consultancy Services For Sunway Velocity Centre (Member) |
RM34,000 |
16. |
1/1/20-31/12/20 |
NOISE AND VIBRATION STUDY AT SET-PGB ( PETRONAS GAS BERHAD) (Member) |
RM44,000 |