{"id":269,"date":"2012-10-10T08:53:39","date_gmt":"2012-10-10T00:53:39","guid":{"rendered":"http:\/\/comp.utm.my\/azman2\/?page_id=269"},"modified":"2020-12-29T17:33:51","modified_gmt":"2020-12-29T09:33:51","slug":"completed-projects","status":"publish","type":"page","link":"https:\/\/people.utm.my\/radzuans\/completed-projects\/","title":{"rendered":"Research Experiences"},"content":{"rendered":"<p><span style=\"color: #0000ff\"><strong>RUG RESEARCH GRANT<\/strong><\/span><\/p>\n<ol>\n<li><strong>Project Member.<\/strong> Pelestrian Sarang Lebah Kelulut Menggunakan Teknolgi Bahan Binaan Alami. December 2020 &#8211; December 2022<\/li>\n<li><strong>Project Member<\/strong>. Alarming System for Peat Burning Problem. June 2020 &#8211; June 2021<\/li>\n<li><strong>Project Leader<\/strong> of Prediction of RQD Using Fuzzy Logic Algorithm With Rock Geophysics. Tier 2 RUG of UTM. Research Fund: RM20,000. Research Duration: Aug. 2019 \u2013 Jan. 2021<\/li>\n<li><strong>Project Member<\/strong> of Valuating and Monitoring The Effects of Climate Changes on Landslide Hazard Zonation using Artificial Neural Network and Real-Time Monitoring System. (2020) RUG of UTM. Ref. No: PY\/2019\/02755. Research Fund: RM120,000. Research Duration: Jan. 2020 \u2013 Jun. 2023.<\/li>\n<li><strong>Project Member<\/strong> of Characterisation of Marine Clay Stabilized by Modified Polyurethane Under Static and Dynamic Loading With Microstructural Verification. UTM Fundamental Research RUG of UTM. No. PY\/2019\/01390. Research Fund: RM 60,000. Project Duration: Jan. 2020 \u2013 Jun. 2023.<\/li>\n<li><strong>Project Member<\/strong> of Crack Detection on Retaining Wall By Using Thermal Camera And Image Processing Technique. Industry-International Incentive Grant RUG of UTM. Ref. No: PY\/2019\/01027. Research Fund: RM 20,000. Research Duration: Sept. 2019 \u2013 Feb.2021<\/li>\n<li><strong>Project Member<\/strong> of KTP-NMG 2019: Ternakan Kelulut Mengguna Teknologi Simenfero Mesra Alam. Business Entity RUG of UTM. Ref. No: PY\/2019\/00055. Research Fund: RM 5000. Research Duration: 01\/02\/2019 \u2013 31\/07\/2019.<\/li>\n<li><strong>Project Member<\/strong> of Influence of Riparian Vegetation on River Hydraulics And Morphology During Flood. Tier 2 RUG of UTM. The reference number is PY\/2017\/01547. The research fund is RM 20,000. The research duration 01\/02\/2018 &#8211; 30\/04\/2019.<\/li>\n<li><strong>Project Member<\/strong> of Performance Of Lime-Treated Compacted Tropical Residual Soil Under Wetting-Drying Cycles On Hydro-Compressibility Behaviour. Tier 1 RUG of UTM. Ref. No.: PY\/2017\/01701. Research Fund is RM 50,000. Research Duration: Feb. 2018 \u2013 Jan. 2021<\/li>\n<li><strong>Project Member<\/strong> of Quarry Blast Model For Rock Fragmentation. Tier 1 RUG of UTM. Ref. No: PY\/2017\/01396. Research Fund: RM49,500. Research Duration: Feb. 2018 \u2013 Nov. 2020<\/li>\n<li><strong>Project Member<\/strong> of Soil-Lime Stabilisation for Low Volume Road. Tier 1 RUG of UTM. Ref. No: PY\/2017\/02098. Research Fund:RM 48,750. Research Duration: Feb. 2018 \u2013 Nov. 2020<\/li>\n<li>10.<strong> Project Member<\/strong> of Study of NAPLS Migration In Laterite Soil Under Vibration Effect. Teir 1 RUG of UTM. Ref. No: PY\/2017\/01409. Research Fund: RM50,000. Research Duration: 01\/02\/2018 \u2013 31\/01\/2020.<\/li>\n<li><strong>Project Member<\/strong> of Climate Change Impacts on Hydrological and Sediment Transport Processes in a Sg Ringlet Dam and Its Highland Watershed. Tier 2 RUG of UTM. Ref. No: PY\/2017\/00427. Research Fund: RM 20,000. Research Duration: 01\/07\/2017 \u2013 30\/06\/2018.<\/li>\n<li><strong>Project Member<\/strong> of The Influence of Plant Diversity on Slope Stability. UTM Shine RUG of UTM. Ref. No: PY\/2017\/02228. The research fund is RM 50,000. Research Duration: 15\/11\/2017 \u2013 14\/01\/2020.<\/li>\n<li><strong>Project Member<\/strong> of Assessment of Soil Fabric and Partial Saturation Effect on Compressibility Behaviour of Compacted Tropical Residual Soil. Tier 1 RUG of UTM. Ref. No: PY\/2016\/06551. The research fund is RM 50,000. Research Duration: 01\/07\/2016 &#8211; 31\/12\/2018.<\/li>\n<li><strong>Project Member<\/strong> of Laboratory Study For Double-Porosity Soil With Vibration Effect. Tier 1 RUG of UTM. Ref. No:PY\/2016\/06547. The research fund is RM 49336.08. Research Duration: 01\/07\/2016 \u2013 30\/06\/2018.<\/li>\n<li><strong>Project Member<\/strong> of Strengthening of Low Bearing Capacity Subgrade Soil Using Intelligent Shape Concrete Panel (ISCP) For Rural Road. Tier 1 RUG of UTM. Ref. No: PY\/2015\/05045. Research Fund: RM 50,000. Research Duration: Feb. 2016 \u2013 Jan. 2018.<\/li>\n<li><strong>Project Member<\/strong> of Evaluation of Stress Distribution Under Diametrical Compression Test on Rock. Tier 1 RUG of UTM. Ref. No:PY\/2015\/04460. Research Fund: RM 50,000. Research Duration: 01\/05\/2015 \u2013 31\/10\/2016.<\/li>\n<li><strong>Project Member<\/strong> Evaluation on Project Based Learning Implementation for Civil Engineering Students in Malaysian University. Tier 1 RUG of UTM. Ref. No:PY\/2015\/04905. Research Fund: RM 37,500. Duration: Nov. 2015 \u2013 Dec. 2017.<\/li>\n<li><strong>Project Member<\/strong> of Erosion And Accretion In The Swash Region. Tier 2 RUG of UTM. Ref. No:PY\/2012\/01261. Research Fund: RM 50,000. Research Duration 01\/12\/2012 \u2013 31\/12\/2013.<\/li>\n<li><strong>Project Member<\/strong> of Database on Rock Properties for Preliminary Assessment of Site. Tier 2 RUG of UTM. Ref. No:PY\/2011\/01415. The research fund is RM 40,000. Research duration 01\/04\/2011 \u2013 31\/03\/2012.<\/li>\n<li><strong>Project Member<\/strong> of Operating Speed of Vehicles on Vertical And Horizontal Curves on Single Carriage Way Roads. Tier 2 RUG of UTM. Ref. No: PY\/2011\/01498. Research Fund: RM 40,000. Research Duration: 01\/04\/2011 \u2013 31\/03\/2012.<\/li>\n<li><strong>Project Member<\/strong> of Sub-Metre Digital Terrain Models And Their Impacts In The Analysis of Ponding And Surface Water Run-Off In Flat Areas. Tier 2 RUG of UTM. Ref. No: PY\/2011\/01391. Research Fund: RM40,000. Research Duration 01\/04\/2011 \u2013 31\/07\/2012.<\/li>\n<\/ol>\n<p><span style=\"color: #0000ff\"><strong>FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS)<\/strong><\/span><\/p>\n<ol>\n<li><strong>Project Member<\/strong>. Erosion of Riparian Vegetated Stream Banks Due to Bifurcation and Confluence of Channel. Research Duration December 2020 &#8211; December 2022.<\/li>\n<li><strong>Project Member<\/strong>. The Influence of Morphological Changes on Freshwater Salinization Profiles in a Meandering River. December 2020 &#8211; December 2022.<\/li>\n<li><strong>Project Member<\/strong> of The Formation And Influence of Sandbars Due to Varying of Flow and Sediment in Vegetated Channel (2019). FRGS Ministry of Education. Research Fund: RM 73,500. Research Duration: Jan. 2019 \u2013 March 2021.<\/li>\n<li><strong>Project Member<\/strong> of Derivation Model Of Dynamic Displacement Measurement Between GPS and an Accelerometer for Bridge Monitoring. FRGS Ministry of Education. Research Fund: RM80,000. Research Duration: August 2016 \u2013 Jan. 2019.<\/li>\n<li><strong>Project Member<\/strong> of A Community-Based Study on The Effectiveness of Flood Emergency Warning System In Malaysia. FRGS Ministry of Education. Research Fund: RM64,100. Research Duration: April \u2013 Dec. 2015<\/li>\n<li><strong>Project Member<\/strong> of Hydrodynamic Simulation of Kelantan River Bank Erosion And Channel Change During Heavy Floods (2015). FRGS Ministry of Education. Research Fund: RM36,500. Research Duration: April \u2013 Dec. 2015.<\/li>\n<li><strong>Project Member<\/strong> of Long Term Analysis of Tidal Range, High Tides and Selected Estuarine Water Level in East Coast of Malaysia. FRGS Ministry of Education. Research Fund: RM70,000. Research Duration: April 2015 \u2013 Dec. 2016<\/li>\n<li><strong>Project Member<\/strong> of Significance of Seasonal River Mouth Sandbar Formation To Flood Levels In The Kelantan River Basin. FRGS Ministry of Education. Research Fund: RM 64,000. Research Duration: April 2015 \u2013 March. 2016<\/li>\n<li><strong>Project Member<\/strong> of Influence of Seasonal Ground Water Table Level Variation and Monsoonal Climate on Swash-Zone Sediment Transport. FRGS Ministry of Education. Research Fund: RM 127,000. Research Duration: Dec. 2013 \u2013 Dec. 2015<\/li>\n<li><strong>Project Member<\/strong> of Erosion and Accretion In The Swash Zone FRGS Ministry of Education. Research Fund: RM50,000. Research Duration: Dec. \u2013 Dec 2013.<\/li>\n<li><strong>Project Member<\/strong> of Sub-Metre Digital Terrain Models and Their Impacts In The Analysis of Surface Water Runoff. FRGS Ministry of Education. Research Fund: RM 40,000. Research Duration: April. 2011 \u2013 August 2012<\/li>\n<li><strong>Project Member<\/strong> of Operating Speed Vehicle on Vertical and Horizontal Curve. FRGS Ministry of Education. Research Fund: RM 40,000. Research Duration: April. 2011 \u2013 March 2012.<\/li>\n<li><strong>Project Member<\/strong> of Investigating the Feasibility of Photogrammetric Area-based Image Matching Technique in the Measurement of Three-Dimensional Deflections of Structures. FRGS Ministry of Education. Research Fund: RM40,000. Research Duration: August 2000 \u2013 Dec 2001.<\/li>\n<\/ol>\n<p><span style=\"color: #0000ff\"><strong>CONTRACT RESEARCH PROJECT NATIONAL\/INTERNATIONAL<\/strong><\/span><\/p>\n<ol>\n<li><strong>Project Member (Project Leader: Assoc. Prof. Dr. Ahmad Safuan &amp; Dr. Abd Wahid Rasip)<\/strong> of Development of a Comprehensive Model for Rock Slope Monitoring using Infra-Red Thermal Remote Sensing on UAV Platform. Contract Research Funded by: PLUS Malaysia Bhd. Research Fund: RM176,841.25. Research Duration: March 2019 \u2013 March 2020.<\/li>\n<li><strong>Project Member (Project Leader Assoc. Prof. Dr. Norhan Abd Rahman)<\/strong> of Kajian Permodelan Fizikal Bagi Independent Expert Review of Dredging and Disposal Works at Ringlet Reservoir in Cameron Highland. Contract Research Funded by Institut Penyelidikan Hidraulik Kebangsaan Malaysia (NAHRIM). Research Fund: RM40,000. Research Duration: Jun 2017 &#8211; Dec 2018.<\/li>\n<li><strong>Project Member (Project Leader: Assoc. Prof. Dr. Mushairry Mustaffar)<\/strong> of Hydrology and Hydraulic Investigation at PT GIN Palm Oil Plantation for the Improvement of Crop Production System: Water Navigation System and Post Harvest Handling (2014). Contract Research Funded by PT Guntung Idamannusa, Riau Indonesia. Research Fund: RM160,000. Duration: Feb. \u2013 Sep. 2014.<\/li>\n<li><strong>Project Member<\/strong> <strong>(Project Leader: Assoc. Prof. Dr. Mushairry Mustaffar) <\/strong>of Hydrological Study and Water Management System Study for PT Bhumireksa Nusasejati, Sumatera, Indonesia. Contract Research Funded by GUTHRIE (M) Sdn. Bhd. Research Fund: RM120,000. Duration: July \u2013 Oct. 2006<\/li>\n<\/ol>\n<p><span style=\"color: #0000ff\"><strong>INDUSTRIAL RESEARCH PROJECT<\/strong><\/span><\/p>\n<ol>\n<li><strong>Project Member (Project Leader: Prof. Dr Asan Ali Golam Hasan)<\/strong> of Integrasi Pico Hidro Elektrik dan Aktiviti Ekonomi Masyarakat Orang Asli (2016). Centre for Community and Industry Network Ministry of Education<\/li>\n<\/ol>\n<p><span style=\"color: #0000ff\"><strong>NETWORKING RESEARCH GRANT PROJECT<\/strong><\/span><\/p>\n<ol>\n<li><strong>Project Member (Project Leader: Prof. Dr. Asan Ali Golam Hasan)<\/strong> of Program Latihan Dan Pelancaran Vortex Hidro Dan Aktiviti Ekonomi,Pos Lemoi, Cameron Highlands, Pahang. (2018). CCIN: Yayasan Sultan Mizan. Research Fund: RM10,000. Research Duration: July \u2013 August 2018.<\/li>\n<li><strong>Project Member (Project Leader: Prof. Dr. Asan Ali Golam Hasan)<\/strong> of Program Tranformasi Luar Bandar. Pico Hidro Elektrik Pos Lemoi Cameron Highlands, Pos Lemoi, Cameron Highlands, Pahang. CCIN: Kementerian Dalam Negeri. Research Fund: RM35,000. Research Duration: Sept. 2017 \u2013 Sept. 2018.<\/li>\n<\/ol>\n<p><span style=\"color: #0000ff\"><strong>BUSINESS ENTITY GRANT PROJECT<\/strong><\/span><\/p>\n<ol>\n<li><strong>Project Member (Project Leader: Dr. Abdullah Zawawi) <\/strong>of Pelestarian Sarang Lebah Kelulut Menggunakan Teknologi Bahan Binaan Alami. Business Entity Grant CCIN: Universiti Teknologi Malaysia. Ref. No. KTPRIG2020. Research Fund: RM 20,000. Research Duration: Feb. 2020 \u2013 Feb. 2021.<\/li>\n<li><strong>Project Member (Project Leader: Dr. Abdullah Zawawi) <\/strong>of KTP-NMG 2019:Ternakan Kelulut Mengguna Teknologi Simenfero Mesra Alam. CCIN: RUG UTM. Research Fund RM5,000. Research Duration: Feb. \u2013 Aug. 2019.<\/li>\n<li><strong>Project Member (Project Leader: Prof. Dr. Asan Ali Golam Hasan)<\/strong> of Pos Lemoi Community Project. Business Entity Grant CCIN: CIMB Bank Foundation. Research Fund: RM50,000. Research Duration: Jan. \u2013 Dec. 2018.<\/li>\n<\/ol>\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>RUG RESEARCH GRANT Project Member. Pelestrian Sarang Lebah Kelulut Menggunakan Teknolgi Bahan Binaan Alami. December 2020 &#8211; December 2022 Project Member. Alarming System for Peat Burning Problem. June 2020 &#8211; June 2021 Project Leader of Prediction of RQD Using Fuzzy &hellip; <a href=\"https:\/\/people.utm.my\/radzuans\/completed-projects\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-269","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/radzuans\/wp-json\/wp\/v2\/pages\/269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/radzuans\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/people.utm.my\/radzuans\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/radzuans\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/radzuans\/wp-json\/wp\/v2\/comments?post=269"}],"version-history":[{"count":11,"href":"https:\/\/people.utm.my\/radzuans\/wp-json\/wp\/v2\/pages\/269\/revisions"}],"predecessor-version":[{"id":2966,"href":"https:\/\/people.utm.my\/radzuans\/wp-json\/wp\/v2\/pages\/269\/revisions\/2966"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/radzuans\/wp-json\/wp\/v2\/media?parent=269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}