Current Projects

1. Fundamental Works on Effect of Pile-Soil Interaction Using Low Strain Pile Integrity Test.
Vote : R.J130000.7822.4F118 (2012-2014) – RM 90,080.00
2. Application Of Shallow Foundation For Construction In Industrialized Building System
Vote : 06-01-06-SF1180(2013-2015) –RM178,700.00
3. Determination Of Failure Mechanism For Uplift Capacity In Sand Using Particle Image Velocimetry (Piv)
Vote: ERGS/1/2013/TK03UTM/02/5 (2013-2015) – RM113,600.00