No. | Date | Project | Role |
---|---|---|---|
1. | 2023 | Menaiktaraf tembok penahan kawasan perumahan Taman Langkawi, Langkawi, Kedah. Client: Majlis Bandaraya Langkawi. | Project Leader |
2. | 2019 |
1. North South Expressway – Structural Assessment for Meru & Menora Tunnels and Principle Investigation at Penang Bridge and Selected Bridges Along North-South Expressway, North South Expressway Central Link and Malaysia Singapore Second Crossing. Client: PLUS 2. Rock Testing for ‘Proposed Telekosang Small Hydro Power Project’, Tenom, Sabah. Client: GEOSPEC Sdn. Bhd. 3. Kajian Penyelidikan Kestabilan Cerun Batuan di Bukit Ayam. Client: Jabatan Kerja Raya |
Project Leader |
3. | 2018 |
1. North-South Expressway Permanent Stabilization Work for Rock Slope at KM 258.17 Southbound, Section C5 and Bukit Lanjan, Section C4. Client: PLUS 2. Pemantauan cerun dan pemasangan peralatan pemantauan gegaran di Logi Rawatan Air Gunung Pulai. Client: Badan Kawal Selian Air Johor (BAKAJ) 3. Rock Testing for Lafarge and IKRAM Sdn Bhd |
Project Leader |
4. | Oct 2017 – ongoing | Pemantauan cerun dan pemasangan peralatan pemantauan gegaran di Logi Rawatan Air Gunung Pulai | Member |
5. | 2016 – 2016 | Kajian semula geologi, geoteknik dan hidraulogi di persekitaran tadahan Sungai Air Hitam Besar, Gunung Pulai, Kulai Jaya | Member |
6. | 2015 – 2016 | Study of geohazard at highwall rock face at ISB Quarry | Member |
7. | 2014 – 2015 | Testing of rock samples for foundation of RC Dam in Limbang 2 & Lawas, Sarawak – for GEOSPEC Sdn. Bhd. | Member |
8. | 2008 | Slope stability assessment of Penryhn Quary, UK – for GWP Consultants LLP | Member |