Consultancies
Updated : 07 October 2019
No. |
Date |
Project |
1. |
2019 |
- North South Expressway – Structural Asessement for Meru & Menora Tunnels and Principle Investigation at Penang Bridge and Selected Bridges Along North-South Expressway, North South Expressway Central Link and Malaysia Singapore Second Crossing. Client: PLUS
- Rock Testing for ‘Proposed Telekosang Small Hydro Power Project’, Tenom, Sabah.
- Kajian Penyelidikan Kestabilan Cerun Batuan di Bukit Ayam. Client: Jabatan Kerja Raya
|
2. |
2018 |
- North-South Expressway Permanent Stabilization Work for Rock Slope at KM 258.17 Southbound, Section C5 and Bukit Lanjan, Section C4. Client: PLUS.
- Pemantauan cerun dan pemasangan peralatan pemantauan gegaran di Logi Rawatan Air Gunung Pulai. Client: Badan Kawal Selian Air Johor (BAKAJ)
- Rock Testing for Lafarge and IKRAM Sdn Bhd
|
3. |
Oct 2017 – ongoing |
Pemantauan cerun dan pemasangan peralatan pemantauan gegaran di Logi Rawatan Air Gunung Pulai |
4. |
2016 – 2016 |
Kajian semula geologi, geoteknik dan hidraulogi di persekitaran tadahan Sungai Air Hitam Besar, Gunung Pulai, Kulai Jaya |
5. |
2015 – 2016 |
Study of geohazard at highwall rock face at ISB Quarry |
6. |
2014 – 2015 |
Testing of rock samples for foundation of RC Dam in Limbang 2 & Lawas, Sarawak – for GEOSPEC Sdn. Bhd. |
7. |
2008 |
Slope stability assessment of Penryhn Quary, UK – for GWP Consultants LLP. |