Updated : 15 May 2025
Main Supervisor
No. | Name | Duration | Title | Status |
---|---|---|---|---|
1 | Neesahantani A/P Moganakrisnan | Sept 2019 – Feb 2020 | Correlation Of Uniaxial Compressive Strength Between UCT And Point Load Index of Rock in Klang Valley | Completed |
2 | Nalinii Ravichandran | Sept 2019 – Feb 2020 | Determination of K And σ During Controlled Blasting For Karstic Limestone Rocks at Klang Valley | Completed |
3 | Karthigeyan s/o Al. Ramanathan | July 2018 – May 2019 | Effects of quarry blasting towards the residential area at Kangkar Pulai, Johor | Completed |
4 | NorShafiqah | July 2018 – May 2019 | Correlation between point load strength index and uniaxial compressive strength of granite rock samples | Completed |
5 | Rafi Ullah | Sept 2017 – June 2018 | Numerical modelling of Forepoles in shallow tunnelling through weathered granite | Completed |
6 | Dedy Yusufian Shah | Feb 2017 – Jan 2018 | Slope stability analysis of quarry face at Karang Sambung district, Central Java, Indonesia | Completed |
7 | Syed Muhammad Bahthiar Syed Osman | Feb 2017 – Jan 2018 | Fracturing and tensile behaviour of sandstone under Brazilian ring test | Completed |
8 | Nurul Jannah Verankutty | Sept 2016 – Feb 2017 | Finite element modelling of Brazilian ring test | Completed |
9 | Lee She Zan | Sept 2015 – June 2016 | Dynamic slope stability analysis during Sabah earthquake | Completed |
10 | Umar Ali Ahmed | Sept 2015 – June 2016 | Particle Image Velocity monitoring of crack propagation in Brazilian test | Completed |
11 | Firas Ahmad Ibrahim | Sept 2015 – June 2016 | Numerical simulation of Brazilian test in RS2 | Completed |
12 | Hafedz Zakaria | Sept 2015 – June 2016 | Prediction of rock engineering properties using Support Vector Machine | Completed |
13 | Hisham Ahamad Hanafiah | Sept 2015 – June 2016 | Analysis of group pile movement in PLAXIS | Completed |
14 | Noor Farah Ishak | Sept 2015 – June 2016 | Comparison of numerical study in slope stability analysis | Completed |
15 | Nurihan Mohd Fauzi | Sept 2014 – Feb 2015 | Behaviour of shale under confinement | Completed |
16 | Mohamed Ali Al Bared | Sept 2014 – Feb 2015 | Rock slope stability assessment at Apartment Intan, Cheras | Completed |
17 | Chee Khong Siong | Sept 2014 – Feb 2015 | Comparison on the predicted settlement and actual settlement for ground improved using stone column | Completed |
18 | Teh Zhi Huan | Sept 2014 – Feb 2015 | Performance of prefabricated vertical drain in soft soil using finite element method | Completed |
19 | Lim Eng Soon | Sept 2012 – Jan 2014 | Comparison between RMR and Q-System for support estimation in preliminary design of support system in circular tunnel | Completed |