Updated : 08 October 2019
Main Supervisor
No. | Date | Position |
---|---|---|
1. | Sarder Mohammad Yahya (March 2014 – March 2016) completed | Analysis of Parameters Affecting Settlement Induced by a Low Overburden Tunnel with Forepoling Pre-support System in Weathered Rock |
2. | Nor Aziah Ishak (Feb 2015 – July 2018) completed | TBM performance of Sungai Buloh Kajang Line 2 |
3. | Muhammad Junaid (April 2017 – May 2019) completed | Effective and expeditious multidiscplinary approach for feasibility assessment of granite deposit |
4. | Osama (Feb 2017 – ongoing) | Effects of jacking force interaction to segmental tunnel lining in soft soil |
5. | Amber Islam (Feb 2018 – ongoing) | Structural Health Assessment of Tunnel Lining |
Co-Supervisor
No. | Date | Position |
---|---|---|
1. | Lim Jee Wen (Feb 2014 – 2016) completed | Development of a preliminary design chart for practical use for the deep mixing method. |
2. | Muhammad Fateh Bin Mior Ahmad Ridzuan (Sept 2017 – on going) | Settlement, slope and vibration analyses on the water treatment plant structure of Sultan Ibrahim Reservoir |