Updated : 24 Aug 2025 Master Research

Main Supervisor

No. Name Duration Title Status
1 Sarder Mohammad Yahya March 2014 – March 2016 Analysis of Parameters Affecting Settlement Induced by a Low Overburden Tunnel with Forepoling Pre-support System in Weathered Rock Completed
2 Nor Aziah Ishak Feb 2015 – July 2018 TBM performance of Sungai Buloh Kajang Line 2 Completed
3 Muhammad Junaid April 2017 – May 2019 Effective and Expeditious Multidisciplinary Approach for Feasibility Assessment of Granite Deposit Completed
4 Amber Islam Feb 2018 – Sept 2020 Structural Health Assessment of Tunnel Lining Completed
5 Nur Fatin Amirah Oct 2023 – present Preferential Flow Characteristics on
Slope Runoff and Seepage Couple
Effect Based on Finite Element
Method
Ongoing

Co-Supervisor

No. Name Duration Title Status
1 Lim Jee Wen Feb 2014 – 2016 Development of a Preliminary Design Chart for Practical Use for the Deep Mixing Method Completed
2 Muhammad Fateh Bin Mior Ahmad Ridzuan Sept 2017 – present Settlement, Slope and Vibration Analyses on the Water Treatment Plant Structure of Sultan Ibrahim Reservoir Completed
3 Osama Feb 2017 – present Effects of jacking force interaction
to segmental tunnel lining in soft
soil
Completed