Updated : 15 May 2025

Main Supervisor

No. Name Duration Title Status
1 Sarder Mohammad Yahya March 2014 – March 2016 Analysis of Parameters Affecting Settlement Induced by a Low Overburden Tunnel with Forepoling Pre-support System in Weathered Rock Completed
2 Nor Aziah Ishak Feb 2015 – July 2018 TBM performance of Sungai Buloh Kajang Line 2 Completed
3 Muhammad Junaid April 2017 – May 2019 Effective and Expeditious Multidisciplinary Approach for Feasibility Assessment of Granite Deposit Completed
4 Osama Feb 2017 – ongoing Effects of Jacking Force Interaction to Segmental Tunnel Lining in Soft Soil Ongoing
5 Amber Islam Feb 2018 – ongoing Structural Health Assessment of Tunnel Lining Ongoing

Co-Supervisor

No. Name Duration Title Status
1 Lim Jee Wen Feb 2014 – 2016 Development of a Preliminary Design Chart for Practical Use for the Deep Mixing Method Completed
2 Muhammad Fateh Bin Mior Ahmad Ridzuan Sept 2017 – ongoing Settlement, Slope and Vibration Analyses on the Water Treatment Plant Structure of Sultan Ibrahim Reservoir Ongoing