Master Thesis

Updated : 08 October 2019

Main Supervisor

No. Date Position
1. Sarder Mohammad Yahya (March 2014 – March 2016) completed Analysis of Parameters Affecting Settlement Induced by a Low Overburden Tunnel with Forepoling Pre-support System in Weathered Rock
2. Nor Aziah Ishak (Feb 2015 – July 2018) completed TBM performance of Sungai Buloh Kajang Line 2
3. Muhammad Junaid (April 2017 – May 2019) completed Effective and expeditious multidiscplinary approach for feasibility assessment of granite deposit
4. Osama (Feb 2017 – ongoing) Effects of jacking force interaction to segmental tunnel lining in soft soil
 5. Amber Islam (Feb 2018 – ongoing) Structural Health Assessment of Tunnel Lining

 

Co-Supervisor

No. Date Position
1. Lim Jee Wen (Feb 2014 – 2016) completed Development of a preliminary design chart for practical use for the deep mixing method.
2. Muhammad Fateh Bin Mior Ahmad Ridzuan (Sept 2017 – on going) Settlement, slope and vibration analyses on the water treatment plant structure of Sultan Ibrahim Reservoir