Module 10C

En. Abdul Mun’im Amran

  • Jenis peruntukan: Bajet U A R Q T.
  • For researcher, need to know Budget R and Q (J130000 and K130000). A is for admin.
  • Salary in U. Research University budjet in Q.
  • Grant No Meaning:

  • Project code just remember the end.
  • V series = virement?
  • MOHE just 1 time virement. Nee to use research manager (RM) for external grant’s virement.
  • V11000 need to be done by RM.
  • B21 = Perjalanan & pengangkutan = B24
  • Approve and receive allocation. Approve is total. receive is the current money. usually industry give little by little.
  • Asset V35= >RM3k. Inventory V36 <RM3k, Same volume after 4 year. If change volume, V26. Fabrication also V26
  • Keyboard, mouse not inventory V36 since it cannot work on its own. Go to V26.
  • V28 maintenance. Can repair machine from faculty (peruntukan berbeza) but need to be in proposal and the machine has KEWPA.
  • Pindah hak milik aset penyelidikan. selepas 4 tahun. Tapi bila hapus, tidak boleh V28 untuk maintenance. KEWPA pindah hak milik kasi fakulti.

  • If the equipment gone, report guard (for UTM). Then report police (For KPT). Give to RMC. You may have to pay (current value).
  • SODO – standard object detail object.
  • Award Money: use RMC (5% for industry, KPT free, international depend), Register in RMC before get money.
  • AP59 – kesalahan guna perolehan. Cannot conform job., cut money, fired, or prison. pecahan kecil = pembelian bawah rm5k 2 kali bawah bawah 31 hari. Cadang 60 hari. Upah 2 kali, lebih tak boleh.

  • Perolehan Universiti
    • Geran Kerajaan (GUP, FRGS,….) – set by bendahari
    • Geran Dalaman (Kontract, International). much easier to use.
  • Bahan sahaja bawah bekalan. Perkidmatan ni beli bahan dan pasang. Kerja pembinaan (elektrik, mekanik) Harta bina urus >RM20k.
  • Kontrak pusat- limit penyelidikan. Sesetengah barang kena beli dengan panel.
  • Kontrak pane – wajib guna.
  • Pembelian tiada dalam proposal – hard
  • Tuntutan dalam tempoh 3 bulan invoice sahaja.
  • https://rmc.utm.my/research-document/
  • Tuntutan perjalanan – 2 minggu sebelum aktiviti bermula. 2 minggu kena tunjukkan bukti.
  • Fail menyimpan. Guide diberi. All need to be original. Prepare, audit. File need to be given to unit kewangan after finish. Get the memo.
  • If invoise hilang,pergi radis, download balik warna, pesuruhjaya sumpah. buat sumpah.