Increase Equipment Productivity 6

6. Schedule your work

This may seem obvious, but many jobsites run without a master schedule. Technology has greatly improved scheduling programs and their application. Jobsite productivity can be significantly increased if the supervisor plans work ahead of time so that there is the least amount of movement of equipment and materials.

Increase Equipment Productivity 7

7. Analyze project reports at regular intervals

What you don’t know can hurt you and your operation. Job costing data and equipment health data should be monitored so that any issues can be addressed and corrected as quickly as possible.

Increase Equipment Productivity 8

8. Manage equipment productively

Unscheduled downtime time is the enemy of the deadline, productivity and budget. In addition to monitoring equipment health on-site, operating techniques should also be monitored to keep productivity levels high and wear and tear on machines low. Remember, a good maintenance program can increase profits by more than 10%.

Increase Equipment Productivity 9

9. Improve safety

The construction industry has one of the highest worker accident rates per number of worker hours completed. Accidents have an adverse effect on construction productivity as they are likely to cause low morale and a slower pace.

Increase Equipment Productivity 10

10. Pay attention to quality

A program designed to boost productivity needs to focus on performing high-quality work. Poor quality can increase the possibility of rework, directly increasing the time needed to finish the project.

Increase Equipment Productivity 2

2. Lay out the jobsite for efficiency

A lot of time is invested in job planning, which means there is one and only one optimal site layout. For example, if materials are stored a long walking distance from the work, hours of nonproductive labor time will result from all those long walks.

Increase Equipment Productivity 1

1. Make sure your working areas are adequately prepared.

The goal is to keep all the work moving at the pace required to meet your deadlines or faster. Loading areas should be at least two truck lengths to allow quick loading cycles and truck exchanges.

Other scheduling types

Resource Planning & Management – Dr Shaiful A Mansur

Resource Management