EQUIPMENT RATES – INTRO

The unit cost of logging or road construction is essentially derived by dividing cost by production. In its simplest case, if you rented a tractor with operator for $60 per hour – including all fuel and other costs – and you excavated 100 cubic meters per hour, your unit cost for excavation would be $0.60 per cubic meter. The hourly cost of the tractor with operator is called the machine rate. In cases where the machine and the elements of production are not rented, a calculation of the owning and operating costs is necessary to derive the machine rate. The objective in developing a machine rate should be to arrive at a figure that, as nearly as possible, represents the cost of the work done under the operating conditions encountered and the accounting system in use. Most manufacturers of machinery supply data for the cost of owning and operating their equipment that will serve as the basis of machine rates. However, such data usually need modification to meet specific conditions of operation, and many owners of equipment will prefer to prepare their own rates.