{"id":667,"date":"2011-01-08T04:44:30","date_gmt":"2011-01-08T04:44:30","guid":{"rendered":"http:\/\/people.utm.my\/\/?p=667"},"modified":"2011-01-08T04:44:30","modified_gmt":"2011-01-08T04:44:30","slug":"consultancy-and-advisory-services","status":"publish","type":"post","link":"https:\/\/people.utm.my\/zainiujang\/2011\/01\/08\/consultancy-and-advisory-services\/","title":{"rendered":"Consultancy and Advisory Services"},"content":{"rendered":"<p>(Consultancy and advisory services start from 1998 onwards only)<\/p>\n<p><strong>Project Title: Advisory services on industrial effluent compliance<\/strong><br \/>\nClient: M-SMM Sdn Bhd (subsidiary to Sumitomo Corporation, Japan). Responsibility: Consultant. Period: Dec 2006 (3 months)<\/p>\n<p><strong>Project Title: EIA for Idemitsu plant in Pasir Gudang<\/strong><br \/>\nClient: Idemetsu. Responsibility: Head of consultancy project. Period: Oct 2005 \u2013 March 2006<\/p>\n<p><strong>Project Title: Carbon credit scheme for palm oil mills<\/strong><br \/>\nClient: International Carbon Credit Sdn Bhd and Felda. Responsibility: Wastewater engineering expert<br \/>\nPeriod: July 2006 &#8211; now<\/p>\n<p><strong>P<\/strong><strong>roject Title: Detailed EIA project for reclamation of land for Ranca-Ranca port, Labuan<\/strong><br \/>\nClient: Maritime Department, Malaysia Ministry of Transport<br \/>\nResponsibility: Principal consultant. Period: July 2006 &#8211; now<\/p>\n<p><strong>Project Title: Arbitration on wastewater treatment plant design and construction<\/strong><br \/>\nClient: Genting Sanyen Sdn Bhd. Responsibility: Expert witness. Period: Oct 2005 \u2013 February 2007<br \/>\nNote: To provide professional judgement on detail design of the wastewater treatment plants<\/p>\n<p><strong>Project Title: Design of hybrid membrane bioreactor for palm oil mill effluent treatment<\/strong><br \/>\nClient: Sakti Suria Sdn Bhd. Responsibility: Designer of MBR system. Period: July 2005 \u2013 Dec 2006<br \/>\nNote: To provide detail design of the MBR system<\/p>\n<p><strong>Project Title: Design of biogas anaerobic system for palm oil mill for Golden Hope Plantation<\/strong><br \/>\nClient: Sakti Suria Sdn Bhd. Responsibility: Designer of anaerobic biogas production pilot plant. Period: Oct\u2013 Dec 2005<br \/>\nNote: To provide detail design of the biogas system<\/p>\n<p><strong>Project Title: Design of Hi-Kleen design system using WASDA<\/strong><br \/>\nClient: PJ Bumi Berhad. Responsibility: Designer of the system. Period: July \u2013 Sept 2005<br \/>\nNote: To provide system to design the treatment plants<\/p>\n<p><strong>Project Title: Master plan for water development in Negeri Sembilan<\/strong><br \/>\nClient: State of Negeri Sembilan. Responsibility: Chairman of the technical report preparation<br \/>\nPeriod: Sept \u2013 Dec 2005<br \/>\nNote: To propose alternatives to overcome water crisis in Seremban<\/p>\n<p><strong>Project Title: Due diligence on the 8+1 Technologies in InventQjaya Sdn. Bhd.<\/strong><br \/>\nClient: SIRIM Berhad. Responsibility: Techical expert of membrane technology. Period: May \u2013 July 2005<br \/>\nNote: To provide comments on the level of technology<\/p>\n<p><strong>Project Title: Study on the Pollution Prevention and River Cleaning Project for Sungai Segget &amp; Tebrau, Johor Bahru.<\/strong><br \/>\nClient: Malaysia Department of Environment. Responsibility: Director of Project<br \/>\nValue: RM2.03 million. Status: October 2001-October 2002<br \/>\nNote: Principal Consultant and head of project management team, as well as developing master plan for sewerage catchment and wastewater treatment plants. Emphasis on sustainable sanitation and decentralised wastewater treatment approach.<\/p>\n<p><strong>Project Title: Study on Odor Control and Management<br \/>\n<\/strong>Client: Hualon Corporation (M) Bhd. Responsibility: Head of Project<strong><br \/>\n<\/strong>Value: RM50,000. Status: November 2003-May 2004<br \/>\nNote: Principal consultant and head of project management and determination of origin of odor problems, and providing engineering design for odor control in wastewater treatment plant.<\/p>\n<p><strong>Project Title: Study on Cleaner Production Master Plan Implementation in Malaysia<\/strong><br \/>\nClient: Malaysia Department of Environment. Responsibility: Director of Project<br \/>\nValue: RM320,000. Status: October 2002-October 2003<br \/>\nNote: Principal consultant and head of project management, and developing master plan for industralised wastewater treatment plants for reuse and recycling of treatment waste materials. The emphasis was on industrial ecology and zero emission approaches.<\/p>\n<p><strong>Project Title: Cost-effective of upgading of waste stabilization ponds.<\/strong><br \/>\nClient: Indah Water Konsortium. Responsibility: Head of Project<br \/>\nValue: RM62,500. Status: Completed, April 2000<br \/>\nNote: Principal consultant and head of project management, and developing a new design for upgrading WSP using baffles and wetlands. The emphasis was on ecological sustainable sanitation approach.<\/p>\n<p><strong>Project Title: EIA Study for Mixed Development Project in Lot 53091\/2, Kluang, Johor<\/strong><br \/>\nClient: Tenaga Professional (Johor) Sdn. Bhd. Responsibility: Head of Project<br \/>\nValue: RM48,000. Status: August 2003-April 2004<\/p>\n<p><strong>Project Title: Feasibility study on reclamation project at Tanjung Kling, Malacca.<\/strong><br \/>\nClient: Kolej Islam Melaka. Responsibility: Head of Project<br \/>\nValue: RM50,000. Status: Completed, 1998<\/p>\n<p>Project Title: Air monitoring (every three month for three years)<br \/>\nClient: Steadtler (M) Sdn. Bhd., Johor Bahru. Responsibility: Head of Project<br \/>\nValue: RM38,400. Status: Ongoing, since 1999<\/p>\n<p><strong>Project Title: Upgading of solid-liquid separation in water treatment plant.<\/strong><br \/>\nClient: Sibu Water Board, Sarawak. Responsibility: Head of Project<br \/>\nValue: RM13,000 . Status: Completed, December 1999<\/p>\n<p><strong>Project Title: Cost-effective of upgading of waste stabilization ponds.<\/strong><br \/>\nClient: Indah Water Konsortium. Responsibility: Head of Project<br \/>\nValue: RM62,500. Status: Completed, April 2000<\/p>\n<p><strong>Project Title: EIA and hydraulic studies for Dangga Bay Project, Johor Bahru.<\/strong><br \/>\nClient: Ekovest Project Management Sdn. Bhd., Johor Bahru. Responsibility: Head of EIA Project<br \/>\nValue: RM195,000. Status: Completed. February 2001.<\/p>\n<p><strong>Project Title: EIA for the Development of Research Center for Freshwater Fisheries, Jelebu, N. Sembilan<\/strong><br \/>\nClient: JKR Head Quarters. Responsibility: Head of Project<br \/>\nValue: RM140,000. Status: Completed, March 2001.<\/p>\n<p><strong>Project Title: Action Plan on Water Management System in UTM Skudai Campus, Johor<\/strong><br \/>\nClient: UTM. Responsibility: Head of Project<br \/>\nValue: RM30,000. Status: Completed, January, 2001.<\/p>\n<p><strong>Project Title: Solid and Hazardous Waste Management &amp; Advanced Water Treatment<\/strong><br \/>\nClient: Genesis Technology, Sarawak. Responsibility: Head of Project<br \/>\nValue: RM21,500. Status: Completed, November 2000<\/p>\n<p><strong>Project Title: Industrial Wastewater Treatment<\/strong><br \/>\nClient: Genesis Technology, Sarawak. Responsibility: Head of Project<br \/>\nValue: RM11,500. Status: Completed, 1999<\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Consultancy and advisory services start from 1998 onwards only) Project Title: Advisory services on industrial effluent compliance Client: M-SMM Sdn Bhd (subsidiary to Sumitomo Corporation, Japan). Responsibility: Consultant. Period: Dec 2006 (3 months) Project Title: EIA for Idemitsu plant in Pasir Gudang Client: Idemetsu. Responsibility: Head of consultancy project. Period: Oct 2005 \u2013 March 2006 [&hellip;]<\/p>\n","protected":false},"author":322,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[40,36],"tags":[],"class_list":["post-667","post","type-post","status-publish","format-standard","hentry","category-editorial-advisory-boards","category-others"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/posts\/667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/users\/322"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/comments?post=667"}],"version-history":[{"count":0,"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/posts\/667\/revisions"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/media?parent=667"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/categories?post=667"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/people.utm.my\/zainiujang\/wp-json\/wp\/v2\/tags?post=667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}