CONSULTATION WORKS
Summary |
|
Consultation Project-UTM |
RM178,537.00 |
Consultation Project- Others |
RM1,362,999.60 |
No. |
Year |
Title |
Value |
Vot |
1. |
2015 |
Deliberation And Improvement Of EPI For Betterment Of Environmental Management, Ministry of Natural Resources and the Environment, Project Member |
RM203159.60
|
UTSB 623 |
2. |
2015 |
Metal analysis in water samples (Pusat Perkhidmatan Analisis) Project member |
RM46,755.00 |
A.J140000.5500.07609 |
3. |
2014 |
Pembangunan Indeks Prestasi Alam Sekitar untuk Malaysia, Ministry of Natural Resources and the Environment. Project Member |
RM299,840.00 |
623 UTSB |
4. |
2014 |
Chemical analysis of water samples (Pusat Perkhidmatan Analisis) Project member |
RM52,195.00 |
A.J140000.5500.07609 |
5. |
2013 |
Perbincangan dan Penambahbaikan Indeks Prestasi Alam Sekitar untuk Kebaikan Pengurusan Alam Sekitar, Ministry of Natural Resources and the Environment. Project Member |
RM157,000.00 |
623 UTSB |
6. |
2013 |
Controlling Aluminium And Fluoride Concentration In Syabas Water Network Project member |
RM49,875.00 |
741 UTSB |
7. |
2012 |
Analisis Kimia (Pusat Perkhidmatan Analisis) |
RM79,587.00 |
A.J140000.5500.07609 |
8. |
2012 |
Development Of Environmental Performance Index For Malaysia (Malaysia EPI), Ministry of Natural Resources and the Environment, Project Member |
RM405,000.00 |
623 UTSB |
9. |
2011 |
Indeks Prestasi Alam Sekitar |
RM73,125.00 |
623 UTSB |
10. |
2006 |
Development of Biorock for Water and Wastewater Treatment. Funded by Aidid Sdn Bhd. Project Member |
RM130,000.00 |
434 UTSB |
11. |
2006 – 2007 |
Project detailed engineering design of water quality improvement works of Sg. Segget catchment, Johor Bahru (Department of Irrigation and Drainage). Project Member |
RM45,000 |
362 UTSB |