CONSULTATION WORKS

Summary

Consultation Project-UTM

RM178,537.00

Consultation Project- Others

RM1,362,999.60

 

No.

Year

Title

Value

Vot

1.      

2015

Deliberation And Improvement Of EPI For Betterment Of Environmental Management, Ministry of Natural Resources and the Environment,  Project Member

RM203159.60

 

 

UTSB 623

2.      

2015

Metal analysis in water samples (Pusat Perkhidmatan Analisis)

Project member

RM46,755.00

A.J140000.5500.07609

3.      

2014

Pembangunan Indeks Prestasi Alam Sekitar untuk Malaysia, Ministry of Natural Resources and the Environment. Project Member

RM299,840.00

623 UTSB

4.      

2014

Chemical analysis of water samples (Pusat Perkhidmatan Analisis) Project member

RM52,195.00

A.J140000.5500.07609

5.      

2013

Perbincangan dan Penambahbaikan Indeks Prestasi Alam Sekitar untuk Kebaikan Pengurusan Alam Sekitar, Ministry of Natural Resources and the Environment. Project Member

RM157,000.00

623 UTSB

6.      

2013

Controlling Aluminium And Fluoride Concentration In Syabas Water Network

Project member

RM49,875.00

741 UTSB

7.      

2012

Analisis Kimia (Pusat Perkhidmatan Analisis)

RM79,587.00

A.J140000.5500.07609

8.      

2012

Development Of Environmental Performance Index For Malaysia (Malaysia EPI), Ministry of Natural Resources and the Environment,  Project Member

RM405,000.00

623 UTSB

9.      

2011

Indeks Prestasi Alam Sekitar

RM73,125.00

623 UTSB

10.   

2006

Development of Biorock for Water and Wastewater Treatment. Funded by Aidid Sdn Bhd. Project Member

RM130,000.00

434 UTSB

11.   

2006 – 2007        

Project detailed engineering design of water quality improvement works of Sg. Segget catchment, Johor Bahru (Department of Irrigation and Drainage).  Project Member

RM45,000

362

UTSB