{"id":738,"date":"2016-01-17T15:23:24","date_gmt":"2016-01-17T07:23:24","guid":{"rendered":"http:\/\/people.utm.my\/zakiyamani\/?p=738"},"modified":"2016-01-21T09:01:51","modified_gmt":"2016-01-21T01:01:51","slug":"main-scheduled-tasks-for-week-2-2016-10-14-jan-2","status":"publish","type":"post","link":"https:\/\/people.utm.my\/zakiyamani\/2016\/01\/17\/main-scheduled-tasks-for-week-2-2016-10-14-jan-2\/","title":{"rendered":"Main scheduled tasks for week #3 2016 (17 \u2013 21 Jan)"},"content":{"rendered":"<p><strong>17th Jan 2016 \u2013 Sunday :<\/strong><\/p>\n<p>(1)Introduction to Engineering Mark Assessment Meeting<\/p>\n<p>(2) <a href=\"https:\/\/people.utm.my\/zakiyamani\/iso-90012015-awareness-briefing\/\">ISO Awareness Meeting @ Faculty (2.30pm &#8211; BMF)<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>18th Jan 2016 \u2013 Monday :<\/strong><\/p>\n<p>(1) First Stage MKK examinations (as examiner)<\/p>\n<p>(2) First Stage MKK examinations for my student<\/p>\n<p>(3) GCMS-Head Space\/Pyrolyzer\u00a0installation and set up<\/p>\n<p>&nbsp;<\/p>\n<p><strong>19th Jan 2016 \u2013 Tuesday :<\/strong><\/p>\n<p>(1) GCMS-Head Space\/Pyrolyzer installation and set up<\/p>\n<p>(2) MKH Subject Meeting @ Center of Hydrogen Energy (CHE)<\/p>\n<p>&nbsp;<\/p>\n<p><strong>20th Jan 2016 \u2013 Wednesday :\u00a0<\/strong><\/p>\n<p>(1) <a href=\"https:\/\/people.utm.my\/zakiyamani\/car-sample-data-training-meeting\/\">CRR Meeting\/Training (Dr. Wan Rosli system)<\/a><\/p>\n<p>(2)\u00a0GCMS-Head Space\/Pyrolyzer commissioning and training starts today<\/p>\n<p>(3) Unofficial meeting with analytical lab staff<\/p>\n<p>&nbsp;<\/p>\n<p><strong>21th Jan 2016 \u2013 Thursday :<\/strong><\/p>\n<p>(1) <a href=\"https:\/\/people.utm.my\/zakiyamani\/safety-audit-preparation-meeting\/\">Safety Audit Preparation Meeting &#8211; N05<\/a><\/p>\n<p>(2)\u00a0GCMS-Head Space\/Pyrolyzer commissioning and training starts today<\/p>\n","protected":false},"excerpt":{"rendered":"<p>17th Jan 2016 \u2013 Sunday : (1)Introduction to Engineering Mark Assessment Meeting (2) ISO Awareness Meeting @ Faculty (2.30pm &#8211; BMF) &nbsp; 18th Jan 2016 \u2013 Monday : (1) First Stage MKK examinations (as examiner) (2) First Stage MKK examinations for my student (3) GCMS-Head Space\/Pyrolyzer\u00a0installation and set up &nbsp; 19th Jan 2016 \u2013 Tuesday [&hellip;]<\/p>\n","protected":false},"author":13504,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[214,217,215],"class_list":["post-738","post","type-post","status-publish","format-standard","hentry","category-research","tag-jobs","tag-meetings","tag-tasks","entry"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/posts\/738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/users\/13504"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/comments?post=738"}],"version-history":[{"count":0,"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/posts\/738\/revisions"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/media?parent=738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/categories?post=738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/people.utm.my\/zakiyamani\/wp-json\/wp\/v2\/tags?post=738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}