Project Leader
- January 2020 – June 2021, Project Leader, Meningkatkan Ekonomi Komuniti Setempat Melalui Pengurusan Konservasi Hutan Paya Laut, CCIN Knowledge Transfer Program Research Innovation Grant (UTM KTP-RIG), Budget approved RM20,000, R.J130000.7309.4L433, (Active).
- January 2019 – December 2019, Project Leader, Reduction of Impact of Oil Palm Expansion on Climate Change Emissions, Universiti Kebangsaaan Malaysia-Yayasan Sime Darby (UKM-YSD), Budget approved RM20,000, R.J130000.7309.4B384, (Completed).
- January 2019 – November 2019, Project Leader, Mangrove Knowledge Transfer for Sustainable Economic Development (Maktsed+), Networking Grant (NG), United States Embassy of Malaysia, Budget approved RM62,887 ($15,000), S.J13000.7609.4X447, (Completed).
- September 2013 – August 2015, Project Leader, The Study of the Mechanism of Adsorption and Characterization of Natural Clinoptilolite, Crushed Cockle Shell and Fly Ash as Natural River Treatment, Fundamental Research Grant Scheme (FRGS), Budget approved RM84,000, J130000.7822.4F390, Vot 4F390, (Completed).
- May 2012 – January 2013, Project Leader, Seaport Survival and Impact of Economic Crisis, Research Universiti Grant (RUG) Tier 2, Budget approved RM20,000, J130000.2622.06J77, (Completed).
- May 2012 – April 2013, Project Leader, Flow Mechanism in Two-Stage Straight Mobile Bed Channels, RUG Tier 2, Budget approved RM20,000, Q.J130000.2622.06J46, (Completed).
- January 2012 – July 2012, Project Leader, Flow Mechanism in Vegetated Two-Stage Meandering Fixed Bed Channel, RUG Tier 2, Budget approved RM40,000, J130000.2622.03J97, (Completed).
- November 2008 – November 2010, Project Leader, Determination of Flow Characteristics in the Vegetated Straight Compound Channels, FRGS, Budget approved RM85,000, J130000.7822.3F307, (Completed).
- December 2008 – December 2010, Project Leader, Flood Water Level Influenced by Trees and Vegetation along the Edge of Floodplain in Case of River Flooding, MTSF, Science and Technology Research Grant, Budget approved RM25,000, R.J130000.7322.3B035, (Completed).
Project Member
1. November 2019 – October 2020, Project Member, Saltwater Intrution Pattern in a Meandering River, UTM Encourgement Research (UTMER), Budget approved RM30,000, R.J130000.7309.4B384, (Active).
2. September 2019 – August 2021, Project Member, Understanding the Pattern of Tropical Mangrove Sapling Projection Under Climatic Variation, FRGS, Budget approved RM92,700, R.J130000.7851.5F153, (Active).
3. September 2019 – August 2021, Project Member, The Development of Meshfree Formulation for Flood Modelling and Analysis, FRGS, Budget approved RM72,200, R.J130000.7851.5F122, (Active).
4. July 2018 – December 2018, Project Member, Libatsama Bersama Komuniti-Industri Pengetagan Pokok Menggunakan Geotrees Sempena Program CSR On Semiconductor (M) Sdn Bhd. Senawang, NG, Budget approved RM17,240, S.J130000.7352.4X367, (Completed).
5. August 2018 – March 2019, Project Member, Feasibility Study on Energy Saving and Significant Ghg Emission Reductions By Dissemination of Refrigerant Leakage Prevention Technology using Ultrasonic Detection System and Lot in Refrigeration and Air-Conditioning, Contract Research (CR), International Industry with Mutsubishi UFJ Morgan Stanley, Budget approved RM91,678.50 (JPY2,452,890) J130000.7651.4C205, (Completed).
6. August 2017 – January 2020, Project Member, Investigation of the 3-Dimensional Flow Field and Hydraulic Stability of Seawater Intake Structure, FRGS, Budget approved RM106,000,J130000.7809.4F979, (Active).
7. June 2017 – December 2018, Project Member, Kajian Permodelan Fizikal Bagi Independent Expert Review of Dredging and Disposal Works at Ringlet Reservoir In Cameron Highland, CR, Budget approved RM40,000, J130000.7622.4C145, (Ended).
8. July 2017 – September 2018, Project Member, Oil Spill Modelling at Coastal Waters of Johor Straits, RUG Tier 1, Budget approved RM39,400, Q.J130000.2522.17H85, (Completed).
- December 2014 – November 2017, Project Member, The Migration of Mangrove Shoreline in Response to Sea Level Rise, FRGS, Budget approved RM100,000, R.J130000.7822.4F607, (Completed).
- August 2016 – July 2018, Project Member, Understanding Erosion Threat on Desaru Beach, Johor, Budget approved RM91,000, FRGS, R.J130000.7822.4F848, (Completed).
- May 2015 – October 2016, Project Member, An Exploratory Study of River Water Treatment using Different Adsorbents for the Removal of Recalcitrant Organic Compounds, Nutrients, Oil and Grease, RUG Tier 1, Budget approved RM50,000, J130000.2517.10H25, (Completed).
- September 2015 – August 2016, Project Member, Flow Behaviour in Flooding Riparian Vegetated Mobile Bed Straight Channels, RUG-Potential Academic Staff (PAS), Budget approved RM20,000, Q.J130000.2722.02K00, (Completed).
- April 2015 – March 2016, Project Member, Control of Turbidity Currents to Reduce Reservoir Sedimentation using Obstacles, FRGS, Budget approved RM74,700, R.J130000.7822.4F687, (Completed).
- May 2015 – October 2016, Project Member, Research Project on Hydrodynamic Simulation within Port Limit of Port of Tanjung Pelepas and Establishment of Johor Port Authority (Tanjung Pelepas) Marine Data Centre (Mdc)(Jpa)(Tp)(Mdc), Business Entity (BE)-Institute Sultan Iskandar (ISI), Budget approved RM1,400,000, J130000.0324.4Y027, (Completed).
- March 2015 – June 2016, Project Member, Estuary Sedimentation of Sungai Johor, RUG Flagship, Budget approved RM30,000, Q.J130000.2422.03G02, (Completed).
- April 2015 – March 2016, Project Member, Hydrodynamic Simulation of Kelantan River Bank Erosion and Channel Change During Heavy Floods, FRGS, Budget approved RM36,500,J130000.7822.4F692, (Completed).
- April 2015 – March 2016, Project Member, Significance of Seasonal River Mouth Sandbar Formation to Flood Levels in Kelantan River Basin, FRGS, Budget approved RM64,100, J130000.7809.4F696, (Completed).
- April 2015 – March 2015, Project Member, Modeling Shoreline Vegetation Migration due to Sea Level Rise on Kukup Island Channels, RUG Tier 2, Budget approved RM20,000, Q.J130000.2611.10J01, (Completed).
- July 2014 – June 2015, Project Member, Density Current Dynamics over Sloping Bed, RUG Tier 1, Budget approved RM20,000, J130000.2522.09H06, (Completed).
- January 2013 – December 2013, Project Member, Erosion and Accretion in the Swash Region, RUG Tier 2, Budget approved RM50,000, J130000.2622.07J10, (Completed).
- January 2012 – 31 December 2013, Project Member, Coastal Erosion Studies of The East Coast and Vulnerable Small Island Regions of Peninsular Malaysia, ScienceFund (SF), Budget approved RM199,800, R.K130000.7922.4S011, (Ended).
- January 2011 – March 2013, Project Member, Development of Flood Proof House (Amphibious House) for Floodplain Area in Malaysia, RUG Tier 1, Budget approved RM149,000, Q.J130000.2522.01H90, (Completed).
- April 2011 – January 2013, Project Member, Modelling of Longshore Sediment Transport (LST) in Swash Zone, RUG Tier 1, Budget approved RM49,600, Q.J130000.2522.02H58, (Completed).
- January 2012 – December 2012, Project Member, Modelling Wave Propagation Coastal Erosion, RUG-New Academic Staff (NAS), Budget approved RM20,000, J130000.7722.4P035, (Completed).
- April 2011 – March 2012, Project Member, Process Based Stability Formulae for Coastal Structures Made of RC-Box Sand Containers, RUG Tier 2, Budget approved RM40,000, J130000.2622.03J19, (Completed).
- April 2011 – March 2012, Project Member, Model of Sedrainpond for Conservation of Land and Water Based on Community Participation, RUG Tier 2, Budget approved RM40,000, J130000.2622.04J24, (Ended).
- April 2010 – January 2012, Project Member, Development New Impervious Concrete Material for Floating House in Floodplain Area, Budget approved RM44,000, Vot 78579, (Completed).