{"id":105,"date":"2020-02-05T03:17:02","date_gmt":"2020-02-05T03:17:02","guid":{"rendered":"http:\/\/people.utm.my\/zulhilmi\/?page_id=105"},"modified":"2020-07-06T09:53:39","modified_gmt":"2020-07-06T09:53:39","slug":"consultancy","status":"publish","type":"page","link":"https:\/\/people.utm.my\/zulhilmi\/consultancy\/","title":{"rendered":"Consultancy"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_row _builder_version=&#8221;4.2.2&#8243;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.2.2&#8243;][et_pb_text _builder_version=&#8221;4.2.2&#8243;]<\/p>\n<h3 style=\"text-align: justify\"><strong>1999-2020<\/strong><\/h3>\n<p style=\"text-align: justify\"><strong><\/strong><\/p>\n<ol style=\"text-align: justify\">\n<li>2019 \u2013 2020, <strong>Team Member<\/strong>, Conduct Study and Design of The Island Canal System for \u201cCadangan Pembangunan Bercampur di atas Lot PTD 2156, PTD 2157, PTD 2158, PTD 2159, PTD 3976 dan PTD 3995 Mukim Pantai Timur, Daerah Kota Tinggi, Johor darul Ta\u2019zim untuk Tetuan Buckingham-By-The Sea Sdn Bhd\u201d, Budget approved RM150,000, Vot 07108, (Active).<\/li>\n<\/ol>\n<ol start=\"2\" style=\"text-align: justify\">\n<li>2019, <strong>Team Member<\/strong>, Feasiblity Study on Dredging and River Sand Mining Excavation Technical Review at Sungai Pahang, Pekan District, WM Sand (Pahang) Sdn Bhd., Budget approved RM69,691.80, Vot 07108, (Active).<\/li>\n<\/ol>\n<ol start=\"3\" style=\"text-align: justify\">\n<li>2018 \u2013 2019, <strong>Team Member<\/strong>, Cadangan Pembinaan Operasi Hadapan (FOB) di Pulau Mabul Semporna Sabah, Engineering Sub-Consultant, Budget approved RM30,000, Vot 07108, (Completed).<\/li>\n<\/ol>\n<ol start=\"4\" style=\"text-align: justify\">\n<li>2018 \u2013 2019, <strong>Team Member<\/strong>, Environment Impact Assessment (EIA) Preparation Sand Consession Area at Kuala Linggi Melaka, Timbang Suasa Sdn Bhd-Unitechnologies Sdn Bhd (UTSB)<span>, Budget approved RM140,000, (Active).<\/span><\/li>\n<\/ol>\n<ol start=\"5\" style=\"text-align: justify\">\n<li>2016 \u2013 2017, <strong>Team Member<\/strong>, Membekalkan Maklumat dan Data Berkaitan Sistem Pemecah Ombak, National Hydraulic Research Institute of Malaysia (NAHRIM), Budget approved RM13,038, Vot 1186, (Completed).<\/li>\n<\/ol>\n<ol start=\"6\" style=\"text-align: justify\">\n<li>2015 \u2013 2016, <strong>Computer Modeller<\/strong>, Hydrodynamic Simulation within Port Limit of PTP and Establishment of Johor Port Authority Marine Data Centre (2015-2016)-COEI and Institut Sultan Iskandar (ISI), Johor Port Authority (JPA), Budget approved RM260,000, Vot 07108, (Completed).<\/li>\n<\/ol>\n<ol start=\"7\" style=\"text-align: justify\">\n<li>2015 \u2013 2016, <strong>Team Member<\/strong>, Perkhidmatan Kerja Penyiasatan Tanah, Penilaian dan Penentuan Fabrikasi dan Analisis Berkaitan Pemasangan Produk Perlindungan Pantai, NAHRIM, Budget approved RM30,000, Vot 930, (Completed).<\/li>\n<\/ol>\n<ol start=\"8\" style=\"text-align: justify\">\n<li>2015 \u2013 <strong>Team Member<\/strong>, Design of Innovative Seawall Systems, NAHRIM, Budget approved RM19,500, Vot 882, (Completed).<\/li>\n<\/ol>\n<ol start=\"9\" style=\"text-align: justify\">\n<li>2013 \u2013 <strong>Team Member<\/strong>, EIA Pembangunan Bandar Baru Kijal, Kemaman dan Pembangunan Pusat Pentadbiran Daerah Kuala Nerus, Terengganu, Majlis Perbandaran Kemaman, Budget approved RM94,500, Vot Pending, (Ended).<\/li>\n<\/ol>\n<ol start=\"10\" style=\"text-align: justify\">\n<li>2010 \u2013 2011, <strong>Computer Modeller<\/strong>, Proposed Tin Mining at the Coast Water of Kuala Sungai Baru, Alor Gajah Melaka, Unit Perancang Ekonomi Negeri Malaka (UPEN), Budget approved RM1,200,000, Vot 547, (Ended).<\/li>\n<\/ol>\n<ol start=\"11\" style=\"text-align: justify\">\n<li>2009 \u2013 2010, <strong>Computer Modeller<\/strong>, Coastal Hydraulic and Sedimentation Study for the Assessment of Dredging Requirements for Ports and River Mouths in Malaysia: Labuan and Sabah Sites, Jabatan Laut Semenanjung Malaysia (JLSM), Biro Inovasi dan Perundingan<span> (BIP), Budget approved RM2,000,000, Vot 63292, (Completed).<\/span><\/li>\n<\/ol>\n<ol start=\"12\" style=\"text-align: justify\">\n<li>2009 \u2013 <strong>Team Member<\/strong>, Renewing Quarry Lease at PTD 1611 and 1612 Sungai Pachat, Mukim Tanjung Surat Kota Tinggi Johor<span>, <\/span>Biro Inovasi dan Perundingan (BIP)-Kamin Granite Sdn Bhd<span>, Budget approved RM20,000, (Completed).<\/span><\/li>\n<\/ol>\n<ol start=\"13\" style=\"text-align: justify\">\n<li>2009 \u2013 2010, <strong>Deputy Project Leader<\/strong>, Enginering and Hydraulic Evaluation of Wellguard Bouy Regulated Tidal Control Gate, Wellguard, Contract Research (CR), BIP-Perunding Makmur Sdn Bhd, Budget approved RM94,000, Vot 63691, (Completed).<\/li>\n<\/ol>\n<ol start=\"14\" style=\"text-align: justify\">\n<li>2008 \u2013 2009, <strong>Computer Modeller<\/strong>, Review of Environmental Issues for EIA Study of Tanjung Pelepas Port, Tanjung Pelepas Johor, Budget Approved RM400,000, Vot 07108, (Completed).<\/li>\n<\/ol>\n<ol start=\"15\" style=\"text-align: justify\">\n<li>2007 \u2013 2009, <strong>Coastal Engineer<\/strong>, Tsunami Modelling and Impact Studies for the North-Western Coast of Peninsular Malaysia, BIP, Department of Irrigation and Drainage (DID), METU, Budget approved RM1,999,993, Vot 63076, (Completed).<\/li>\n<\/ol>\n<ol start=\"16\" style=\"text-align: justify\">\n<li>2007 \u2013 2008, <strong>Computer Modeller<\/strong>, Hydraulics Study of the Proposed Islands Reclamation Development Project at Palm Springs Resort, Port Dickson, BIP, Rho-1 Consultant Sdn Bhd, Budget Approved RM450,000, Vot 07108, (Completed).<\/li>\n<\/ol>\n<ol start=\"17\" style=\"text-align: justify\">\n<li>2007 \u2013 2008, <strong>Computer Modeller<\/strong>, Hydraulics Assessment of Suspended Sediment Dispersion from the Disposal Site to the North of Penang Island, BIP, LI Environmental Consultants Sdn Bhd, Budget approved RM500,000, Vot 07108, (Completed).<\/li>\n<\/ol>\n<ol start=\"18\" style=\"text-align: justify\">\n<li>2001 \u2013 2003, <strong>Researcher<\/strong>, Eco-Bio Block (EEB) for Water Quality Improvement, Cadangan Menaikkan Kualiti Air Sungai Melaka, Langkawi Menggunakkan Eco-Bio Block, Aidid Consultant, Mamoru and Department of Irrigation and Drainage (DID), UTSB, Vot 266, (Completed).<\/li>\n<\/ol>\n<ol start=\"19\" style=\"text-align: justify\">\n<li>1999 \u2013 2001,<strong> Researcher<\/strong>, Hydraulics Model Investigation of Beris Dam Spillway, 1999-2001, JPS, BIP, Budget approved RM195,000, Vot 07108, (Completed).<\/li>\n<\/ol>\n<ol start=\"20\" style=\"text-align: justify\">\n<li>1998 \u2013 2000, <strong>Researcher<\/strong>, Hydrological Study in Small Island-Tioman Island, Research Contract with Humic Tropical Centre, Department of Irrigation and Drainage (DID), Vot 68813, (Completed).<\/li>\n<\/ol>\n<ol start=\"21\">\n<li style=\"text-align: justify\">1998 \u2013 2000, <strong>Engineer<\/strong>, Sine-Slab Commercialization Project, Zen-Concrete Industries Sdn Bhd-UTSB, Budget approved RM150,000, Vot 72106, (Completed).<\/li>\n<\/ol>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>1999-2020 2019 \u2013 2020, Team Member, Conduct Study and Design of The Island Canal System for \u201cCadangan Pembangunan Bercampur di atas Lot PTD 2156, PTD 2157, PTD 2158, PTD 2159, PTD 3976 dan PTD 3995 Mukim Pantai Timur, Daerah Kota Tinggi, Johor darul Ta\u2019zim untuk Tetuan Buckingham-By-The Sea Sdn Bhd\u201d, Budget approved RM150,000, Vot 07108, [&hellip;]<\/p>\n","protected":false},"author":7466,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"class_list":["post-105","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/people.utm.my\/zulhilmi\/wp-json\/wp\/v2\/pages\/105","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/people.utm.my\/zulhilmi\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/people.utm.my\/zulhilmi\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/people.utm.my\/zulhilmi\/wp-json\/wp\/v2\/users\/7466"}],"replies":[{"embeddable":true,"href":"https:\/\/people.utm.my\/zulhilmi\/wp-json\/wp\/v2\/comments?post=105"}],"version-history":[{"count":2,"href":"https:\/\/people.utm.my\/zulhilmi\/wp-json\/wp\/v2\/pages\/105\/revisions"}],"predecessor-version":[{"id":319,"href":"https:\/\/people.utm.my\/zulhilmi\/wp-json\/wp\/v2\/pages\/105\/revisions\/319"}],"wp:attachment":[{"href":"https:\/\/people.utm.my\/zulhilmi\/wp-json\/wp\/v2\/media?parent=105"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}