Local Clienteles

1Title:

Role:
Duration:
Client:
Values:
Feasibility study on the design of decentralised water treatment system and related work in the Federal Territory of Kuala Lumpur.
Project Leader
Oct 2019- May 2020
National Hydraulic Research Institute of Malaysia (NAHRIM)
RM 250,000
2Title:
Role:
Duration:
Client:
Values:
Climate change adaptation framework fr water sector
Project Leader
Oct 2019-May 2020
National Hydraulic Research Institute of Malaysia (NAHRIM)
RM 150,000
3Title:

Role:
Duration:
Client:
Values:
Vot No:
Flood modelling and Mitigation measures for Sime Darby Sstate, Sarawak region, Bintulu, Sarawak
Project Leader
Oct 2019-Apr 2010
Sime Darby
RM 132,994
UTSB 1599
4Title:
Role:
Duration:
Client:
Values:
Vot No:
Environmental flow analysis for water resources management guideline in Malaysia
Project Leader
Dec 2018-May 2019
Qalamas Sdn Bhd
RM 115,000
UTSB 1446
5Title:
Role:
Duration:
Client:
Values:
Vot No:
Water Management Blueprint for PBT Pengerang
Project Leader
9 month (Jan 2018-Sep 2018)
PBT Pengerang
RM 358,856.93
UTSB 1288
6Title:
Role:
Duration:
Client:
Values:
Vot No:
Water Leader Forum 201
Projetct Leader
July 2017 – Nov 2017
Badan Kawal Selia Air Johor (BAKAJ)
RM 308,550.00
UTSB Vot 1209B
7Title:
Role:
Duration:
Client:
Values:
Vot No:
Simposium Kelestarian Air Negeri Johor
Projetct Leader
May 2017 – Sept 2017
Badan Kawal Selia Air Johor (BAKAJ)
RM 226,612.10
UTSB Vot 1209A
8Title:
Role:
Duration:
Client:
Values:
Vot No:
Integrated Lake Basin Management Plan for Semberong and Batang Ai Reservoirs
Project Leader
May 2016 – Nov 2016
National Hydraulic Research Institute of Malaysia (NAHRIM)
RM 1,262,073
UTSB Vot 1025
9Title:

Role:
Duration:
Client:
Values:
Vot No:
Study on Impact of Climate Changes on Water Resources for Selected Plantation Areas in Malaysia for Paddy, Rubber and Oil Palm
Project Leader
Aug 2014-Dec 2014
National Hydraulic Research Institute of Malaysia (NAHRIM)
RM 357,694
UTSB Vot 825
10Title:
Role:
Duration:
Client:
Values:
Vot No:
Rancangan Pengurusan Hutan Tadahan Air bagi Negeri Johor
Project Leader
Jun 2013-Dec 2013
Johor State Forestry Department
RM 299,000
UTSB Vot 750
11Title:
Role:
Duration:
Client:
Values:
Vot No:
Water Resources study in Gugusan FELDA Sahabat , Lahad Datu, Sabah
Project Leader
Mar 2011-Dec 2011
FELDA
RM 1.09 million
UTSB Vot 591
12Title:
Role:
Duration:
Client:
Values:
Vot No:
Penang Cybercity River s Rehabilitation Project
Project Leader
May 2010-Nov 2010
DID/Perunding Azman and Rao
RM 163,106
UTSB Vot 562
13Title:
Role:
Duration:
Client:
Values:
Vot No:
Johor Water Resources Study – Influence of Climate Change
Project Leader
Nov 2010-August 2011
SMSB
RM 204,641
UTSB Vot 592
14Title:

Role:
Duration:
Client:
Values:
Vot No:
Detailed Environmental Impact Assessment for the Proposed Tin Mining at the Coast Water off Kuala Sungai Baru, Alor Gajah,Melaka.
Project Leader
Sept 2010-May 2011
Malacca State Government
RM 1.2 mill.
UTSB Vot 547
15Title:

Role:
Duration:
Client:
Values:
Vot No:
Study on The Potential of Rainwater Utilisation in Supplementing Water Demand in Industry – In Terms of Quantity & Quality,
Project Leader
Hydrology, Water Quality
Jan 2010 – Nov 2010
NAHRIM; RM 236,162
ICC Vot 63326
16Title:
Role:
Duration:
Client:
Values:
Vot No:
Desk Study on River Buffer Zone in Malaysia: Policy, By Laws and Incentives
Project Leader/Hydrologist
Mar-June 2010
NAHRIM;
RM 52,773
BIP 63318
17Title:
Role:
Duration:
Client:
Values:
Vot No:
Environmental Performance Index
Team member
Sep 2011 – Dec 2012
Ministry of Natural Resources and Environment
RM 80,000
UTSB 623
18Title:
Role:
Duration:
Client:
Values:
Vot No:
Environmental Performance Index
Team member
Sep 2009 – Dec 2010
Ministry of Natural Resources and Environment
RM 300,000
UTSB 623
19Title:
Role:
Duration:
Client:
Values:
Vot No:
Mega Science Framework for Water
Project Leader
Aug 2009 – June 2010
Akademi Sains Malaysia
RM 300,000
BIP Vot 63325
20Title:

Role:
Field:
Duration:
Client:
Values:
Vot No:
Study on the Impact of Climate Change on Design Flood and its Application for the Damansara, Johor and Kelantan River Basin.
Project Leader
Rainfall-runoff Modelling, stochastic hydrology
Dec 2008- Jun 2009
DID
RM 198,000.00
BIP Vot 63299
21Title:

Role:
Duration:
Client:
Values:
Vot Number:
Optimization of rainfall observation network on model calibration and application for Johor, Muar and Batu Pahat River Basin
Project Leader
Rainfall-Runoff Modelling, Stochastic Hydrology
Sept 2008- April 2009
Department of Irrigation and Drainage (DID)
RM 331,934.68
BIP 63294
22Title:

Role:
Duration:
Client:
Values:
Vot No:
Study on the Performance of Resam (Dicranoptheris linearis) and Vertiver grass (Chrysopogon zizanioides) for erosion control
Project Leader
Canopy hydrology, soil erosion
April 2008-Mar 2009
Department of Irrigation and Drainage (DID)
RM 346,000
BIP Vot 63286
23Title:
Role:
Field:
Duration:
Client:
Values:
Detailed EIA study for the Proposed Extension of Pulp and Paper Mill in Sipitang
Consultant
Hydrology/Lowflow
Jun 2008-Dec 2008
Chemsain Konsultan Sdn Bhd,
RM 22,000
24Title:
Role:
Field:
Duration:
Client:
Values:
Vot No:
Preparation of Cleaner Production Module
Consultant
Non-Point sources Pollution
Feb 2009-Nov 2009
Department of Environment;
RM 50,000
BIP
25Title:

Role:
Duration:
Client:
Values:
Vot No:
Hydrology and Soil Erosion Study For The Proposed Construction Of the Universiti Malaysia Kelantan, Bachok Campus;
Project Leader
Nov 2007-Mar 2008
Alam Sekitar Malaysia;
RM 28,538
UTSB Vot 549
26Title:
Role:
Field:
Duration:
Client:
Values:
Vot No:
Rekabentuk Terperinci Sistem Saliran Bandar Senai, Johor
Project Leader
Flood control, Pollution Load
Oct 2007-Apr 2008
Perunding Azman & Rao;
RM 210,000
UTSB Vot 466
27Title:
Role:
Field:
Duration:
Client:
Values:
Vot No:
Detailed EIA for Integrated Port at Rancha-Rancha Labuan
Project Leader
Hydrology
2008
Jabatan Laut Malaysia;
RM 1.3 mil
BIP Vot 63033
28Title:
Role:
Field:
Duration:
Client:
Values:
Vot No:
Macro Environmental Impacts Assessment for Forest Management in Johor
Project Leader
Hydrology, Soil Erosion
Oct 2007-April 2008
Forestry Department, Johor;
RM 398,796
UTSB Vot 457
29Title:

Role:
Duration:
Client:
Values:
Vot No:
Detailed EIA for the Proposed Construction of Ulu Jelai Hydro-Power Dam in Cameron Highland
Study Leader for Hydrology
April – Dec 2007
TNB
1.2 million
BIP
30Title:
Role:
Duration:
Client:
Values:
Vot No:
Macro Environmental Impact Assessment for Perak Forest Management Unit
Project Leader
Dec 2006 – April 2007
Forestry Department, Perak/ASMA
RM50,000
UTSB Vot 427
31Title:
Role:
Duration:
Client:
Values:
Detailed EIA study for Lebuh Raya Pantai Timur
Hydrology
Sept 2006 – Oct 2006
Ecotone Management Sdn Bhd
RM 10,000
32Title:
Role:
Duration:
Client:
Values:
EIA study for Shah Alam Waste Transfer Station
Hydrology
April 2006 – May 2006
Ecotone Management Sdn Bhd
RM 3,000
33Title:

Role:
Duration:
Client:
Values:
Vot No:
Detailed EIA – Proposed development of Ulu Jelai Mixed Pumped Storage Hydroelectric Project at Cameron Highlands, Pahang.
Climate, Flora and Fauna
Feb 2003 - Sept 2003
TNB Research Sdn Bhd
RM 1.4 million
BIP
34Title:
Field:
Duration:
Client:
Values:
Vot No:
Lake Study in Malaysia
Hydrology, Water Quality
Nov 2004-May 2005
National Institute of Hydraulic Study (NAHRIM)
RM 49,800
BIP 63282
35Title:

Role:
Duration:
Client:
Values:
Vot No:
Geological, geotechnical and hydrological assessment that lead to Landslide at Gunung Pulai, Johor
Hydrology, Forestry
July- Sept 2002
The State Government of Johor
RM 70,500
BIP 63243
36Title:

Role:
Duration:
Client:
Values:
Vot No:
Study on Pollution Prevention & Water Quality Improvement Program of Sg. Segget and Sg. Tebrau, Johor
Project Manager
Hydrology, Pollution loading, Non Point Source Pollution
Oct 2001 – Oct 2002
Department of Environment Malaysia (DOE)
RM 2.3 mil
BIP 53232
37Title:

Role:
Duration:
Client:
Values:
Vot No:
EIA for the proposed construction and completion of the Research Center for Fresh Water Fish at Glemi Lemi, Jelebu, Negeri Sembilan.
Forest Resources
Sept 2000 – may 2001
JKR
RM 150,000
BIP 63216
38Title:
Role:
Duration:
Client:
Vot No:
Logging impact reduction in the Sungai Chereh Catchment, Kuantan, Pahang.
Hydrology, forest conservation
October 1997
Amanah Saham Pahang (ASPA)
FRIM
39Title:
Role:
Duration:
Client:
Vot No:
EIA for establishing diary farm at Sintuk, Kedah.
Hydrology, sedimentation, water quality.
1989
Perangin Diary Farm
FRIM