1 | Title: Role: Duration: Client: Values: | Feasibility study on the design of decentralised water treatment system and related work in the Federal Territory of Kuala Lumpur. Project Leader Oct 2019- May 2020 National Hydraulic Research Institute of Malaysia (NAHRIM) RM 250,000 |
2 | Title: Role: Duration: Client: Values: | Climate change adaptation framework fr water sector Project Leader Oct 2019-May 2020 National Hydraulic Research Institute of Malaysia (NAHRIM) RM 150,000 |
3 | Title: Role: Duration: Client: Values: Vot No: | Flood modelling and Mitigation measures for Sime Darby Sstate, Sarawak region, Bintulu, Sarawak Project Leader Oct 2019-Apr 2010 Sime Darby RM 132,994 UTSB 1599 |
4 | Title: Role: Duration: Client: Values: Vot No: | Environmental flow analysis for water resources management guideline in Malaysia Project Leader Dec 2018-May 2019 Qalamas Sdn Bhd RM 115,000 UTSB 1446 |
5 | Title: Role: Duration: Client: Values: Vot No: | Water Management Blueprint for PBT Pengerang Project Leader 9 month (Jan 2018-Sep 2018) PBT Pengerang RM 358,856.93 UTSB 1288 |
6 | Title: Role: Duration: Client: Values: Vot No: | Water Leader Forum 201 Projetct Leader July 2017 – Nov 2017 Badan Kawal Selia Air Johor (BAKAJ) RM 308,550.00 UTSB Vot 1209B |
7 | Title: Role: Duration: Client: Values: Vot No: | Simposium Kelestarian Air Negeri Johor Projetct Leader May 2017 – Sept 2017 Badan Kawal Selia Air Johor (BAKAJ) RM 226,612.10 UTSB Vot 1209A |
8 | Title: Role: Duration: Client: Values: Vot No: | Integrated Lake Basin Management Plan for Semberong and Batang Ai Reservoirs Project Leader May 2016 – Nov 2016 National Hydraulic Research Institute of Malaysia (NAHRIM) RM 1,262,073 UTSB Vot 1025 |
9 | Title: Role: Duration: Client: Values: Vot No: | Study on Impact of Climate Changes on Water Resources for Selected Plantation Areas in Malaysia for Paddy, Rubber and Oil Palm Project Leader Aug 2014-Dec 2014 National Hydraulic Research Institute of Malaysia (NAHRIM) RM 357,694 UTSB Vot 825 |
10 | Title: Role: Duration: Client: Values: Vot No: | Rancangan Pengurusan Hutan Tadahan Air bagi Negeri Johor Project Leader Jun 2013-Dec 2013 Johor State Forestry Department RM 299,000 UTSB Vot 750 |
11 | Title: Role: Duration: Client: Values: Vot No: | Water Resources study in Gugusan FELDA Sahabat , Lahad Datu, Sabah Project Leader Mar 2011-Dec 2011 FELDA RM 1.09 million UTSB Vot 591 |
12 | Title: Role: Duration: Client: Values: Vot No: | Penang Cybercity River s Rehabilitation Project Project Leader May 2010-Nov 2010 DID/Perunding Azman and Rao RM 163,106 UTSB Vot 562 |
13 | Title: Role: Duration: Client: Values: Vot No: | Johor Water Resources Study – Influence of Climate Change Project Leader Nov 2010-August 2011 SMSB RM 204,641 UTSB Vot 592 |
14 | Title: Role: Duration: Client: Values: Vot No: | Detailed Environmental Impact Assessment for the Proposed Tin Mining at the Coast Water off Kuala Sungai Baru, Alor Gajah,Melaka. Project Leader Sept 2010-May 2011 Malacca State Government RM 1.2 mill. UTSB Vot 547 |
15 | Title: Role: Duration: Client: Values: Vot No: | Study on The Potential of Rainwater Utilisation in Supplementing Water Demand in Industry – In Terms of Quantity & Quality, Project Leader Hydrology, Water Quality Jan 2010 – Nov 2010 NAHRIM; RM 236,162 ICC Vot 63326 |
16 | Title: Role: Duration: Client: Values: Vot No: | Desk Study on River Buffer Zone in Malaysia: Policy, By Laws and Incentives Project Leader/Hydrologist Mar-June 2010 NAHRIM; RM 52,773 BIP 63318 |
17 | Title: Role: Duration: Client: Values: Vot No: | Environmental Performance Index Team member Sep 2011 – Dec 2012 Ministry of Natural Resources and Environment RM 80,000 UTSB 623 |
18 | Title: Role: Duration: Client: Values: Vot No: | Environmental Performance Index Team member Sep 2009 – Dec 2010 Ministry of Natural Resources and Environment RM 300,000 UTSB 623 |
19 | Title: Role: Duration: Client: Values: Vot No: | Mega Science Framework for Water Project Leader Aug 2009 – June 2010 Akademi Sains Malaysia RM 300,000 BIP Vot 63325 |
20 | Title: Role: Field: Duration: Client: Values: Vot No: | Study on the Impact of Climate Change on Design Flood and its Application for the Damansara, Johor and Kelantan River Basin. Project Leader Rainfall-runoff Modelling, stochastic hydrology Dec 2008- Jun 2009 DID RM 198,000.00 BIP Vot 63299 |
21 | Title: Role: Duration: Client: Values: Vot Number: | Optimization of rainfall observation network on model calibration and application for Johor, Muar and Batu Pahat River Basin Project Leader Rainfall-Runoff Modelling, Stochastic Hydrology Sept 2008- April 2009 Department of Irrigation and Drainage (DID) RM 331,934.68 BIP 63294 |
22 | Title: Role: Duration: Client: Values: Vot No: | Study on the Performance of Resam (Dicranoptheris linearis) and Vertiver grass (Chrysopogon zizanioides) for erosion control Project Leader Canopy hydrology, soil erosion April 2008-Mar 2009 Department of Irrigation and Drainage (DID) RM 346,000 BIP Vot 63286 |
23 | Title: Role: Field: Duration: Client: Values: | Detailed EIA study for the Proposed Extension of Pulp and Paper Mill in Sipitang Consultant Hydrology/Lowflow Jun 2008-Dec 2008 Chemsain Konsultan Sdn Bhd, RM 22,000 |
24 | Title: Role: Field: Duration: Client: Values: Vot No: | Preparation of Cleaner Production Module Consultant Non-Point sources Pollution Feb 2009-Nov 2009 Department of Environment; RM 50,000 BIP |
25 | Title: Role: Duration: Client: Values: Vot No: | Hydrology and Soil Erosion Study For The Proposed Construction Of the Universiti Malaysia Kelantan, Bachok Campus; Project Leader Nov 2007-Mar 2008 Alam Sekitar Malaysia; RM 28,538 UTSB Vot 549 |
26 | Title: Role: Field: Duration: Client: Values: Vot No: | Rekabentuk Terperinci Sistem Saliran Bandar Senai, Johor Project Leader Flood control, Pollution Load Oct 2007-Apr 2008 Perunding Azman & Rao; RM 210,000 UTSB Vot 466 |
27 | Title: Role: Field: Duration: Client: Values: Vot No: | Detailed EIA for Integrated Port at Rancha-Rancha Labuan Project Leader Hydrology 2008 Jabatan Laut Malaysia; RM 1.3 mil BIP Vot 63033 |
28 | Title: Role: Field: Duration: Client: Values: Vot No: | Macro Environmental Impacts Assessment for Forest Management in Johor Project Leader Hydrology, Soil Erosion Oct 2007-April 2008 Forestry Department, Johor; RM 398,796 UTSB Vot 457 |
29 | Title: Role: Duration: Client: Values: Vot No: | Detailed EIA for the Proposed Construction of Ulu Jelai Hydro-Power Dam in Cameron Highland Study Leader for Hydrology April – Dec 2007 TNB 1.2 million BIP |
30 | Title: Role: Duration: Client: Values: Vot No: | Macro Environmental Impact Assessment for Perak Forest Management Unit Project Leader Dec 2006 – April 2007 Forestry Department, Perak/ASMA RM50,000 UTSB Vot 427 |
31 | Title: Role: Duration: Client: Values: | Detailed EIA study for Lebuh Raya Pantai Timur Hydrology Sept 2006 – Oct 2006 Ecotone Management Sdn Bhd RM 10,000 |
32 | Title: Role: Duration: Client: Values: | EIA study for Shah Alam Waste Transfer Station Hydrology April 2006 – May 2006 Ecotone Management Sdn Bhd RM 3,000 |
33 | Title: Role: Duration: Client: Values: Vot No: | Detailed EIA – Proposed development of Ulu Jelai Mixed Pumped Storage Hydroelectric Project at Cameron Highlands, Pahang. Climate, Flora and Fauna Feb 2003 - Sept 2003 TNB Research Sdn Bhd RM 1.4 million BIP |
34 | Title: Field: Duration: Client: Values: Vot No: | Lake Study in Malaysia Hydrology, Water Quality Nov 2004-May 2005 National Institute of Hydraulic Study (NAHRIM) RM 49,800 BIP 63282 |
35 | Title: Role: Duration: Client: Values: Vot No: | Geological, geotechnical and hydrological assessment that lead to Landslide at Gunung Pulai, Johor Hydrology, Forestry July- Sept 2002 The State Government of Johor RM 70,500 BIP 63243 |
36 | Title: Role: Duration: Client: Values: Vot No: | Study on Pollution Prevention & Water Quality Improvement Program of Sg. Segget and Sg. Tebrau, Johor Project Manager Hydrology, Pollution loading, Non Point Source Pollution Oct 2001 – Oct 2002 Department of Environment Malaysia (DOE) RM 2.3 mil BIP 53232 |
37 | Title: Role: Duration: Client: Values: Vot No: | EIA for the proposed construction and completion of the Research Center for Fresh Water Fish at Glemi Lemi, Jelebu, Negeri Sembilan. Forest Resources Sept 2000 – may 2001 JKR RM 150,000 BIP 63216 |
38 | Title: Role: Duration: Client: Vot No: | Logging impact reduction in the Sungai Chereh Catchment, Kuantan, Pahang. Hydrology, forest conservation October 1997 Amanah Saham Pahang (ASPA) FRIM |
39 | Title: Role: Duration: Client: Vot No: | EIA for establishing diary farm at Sintuk, Kedah. Hydrology, sedimentation, water quality. 1989 Perangin Diary Farm FRIM |