Commercialisation Projects

 

Commercialisation Projects

RM647,600.00

Total Income Generated

Commercialisation Projects

Client: New Car Assessment Program for Southeast Asian Countries (ASEAN NCAP)
NO. ROLE NAME OF PRODUCT COMMERCIALISATION DATE TOTAL INCOME GENERATED (RM)
Client: ASEAN NCAP (Cumulative income generated = RM289,710.00)
1. Project Leader Optimum Chime Sound for Driver’s Alert 3/8/2020 – 2/8/2021 26,100.00
2. Project Leader Anthropometric Data of ASEAN Adults and Children for ASEAN NCAP 1/4/2019 – 31/3/2020 40,800.00
3. Project Member Establishment of 3D-Printed Child Manikins Using Anthropometric Data Of 6 And 10 Years Old ASEAN Children For ASEAN NCAP 3/8/2020 – 31/10/2021 70,000.00
4. Project Member ASEAN Children Manikins for ASEAN NCAP 1/8/2020 – 31/7/2021 70,000.00
5. Project Member 3D-printed ASEAN Children Manikins for ASEAN NCAP 8/2020 – 7/2021 35,000.00
6. Project Member Child Presence Detection Assessment Methodology and Guideline for ASEAN NCAP 1/4/2019 – 31/3/2020 27,810.00
7. Project Member Child Restraint System Reference List for ASEAN NCAP 1/4/2018 – 31/3/2019 20,000.00
Client: National Hydraulic Research Institute of Malaysia (NAHRIM)
NO. ROLE NAME OF PRODUCT COMMERCIALISATION DATE TOTAL INCOME GENERATED (RM)
Client: NAHRIM (Cumulative income generated = RM207,890.00)
8. Project Member Kajian Keberkesanan, Pencapaian dan Penilaian Impak Produk Inovasi Kejuruteraan Pantai NAHRIM 8/2020 – 11/2020 50,000.00
9. Project Member Projek Pembangunan Peranti Perangkap Sampah Marin 14/8/2020 – 15/8/2020 50,000.00
10. Project Member Pengujian Lapangan, Lojistik dan Promosi Produk Inovasi Pantai
NAHRIM
1/4/2019 – 30/4/2019 19,990.00
11. Project Member Integrated Tidal Marine Turbine for Power Generation with Coastal Erosion Breakwater 1/9/2018 – 31/12/2018 49,900.00
12. Project Member Seawater Barrier for Muddy Coastal Area 7/2017 – 7/2018 19,000.00
13. Project Member Conceptual Design of Small Scale Integrated Marine Turbine 7/2014 – 10/2017 19,000.00
Client: PETRONAS Carigali Sdn. Bhd.
NO. ROLE NAME OF PRODUCT COMMERCIALISATION DATE TOTAL INCOME GENERATED (RM)
Client: PETRONAS Carigali Sdn. Bhd. (Cumulative income generated = RM150,000.00)
14. Project Member Structural Dynamic Response Monitoring Report:BADP-B
(P0459-SKO-RPT-23)
11/4/2021 10,000.00
15. Project Member Structural Dynamic Response Monitoring Report: D35JT-C
(P0459-SKO-RPT-21)
23/4/2021 10,000.00
16. Project Member Structural Dynamic Response Monitoring Report: D35 Drilling
Platform-B (P0459-SKO-RPT-17 (Revisit))
17/1/2021 10,000.00
17. Project Member Structural Dynamic Response Monitoring Report: J4
DRILLING PLATFORM-A (P0459-SKO-RPT-21)
17/1/2021 10,000.00
18. Project Member Structural Dynamic Response Monitoring Report: TEMANA
Platform (P0459-SKO-RPT-16)
17/1/2021 10,000.00
19. Project Member Structural Dynamic Response Monitoring Report: D35 Riser-A
Platform (P0459-SKO-RPT-11)
17/1/2021 10,000.00
20. Project Member Structural Dynamic Response Monitoring Report: D35 Drilling
Platform-A (P0459-SKO-RPT-13 (Revisit))
17/1/2021 10,000.00
21. Project Member Structural Dynamic Response Monitoring Report: Puteri
(P0459-SKO-RPT-01)
29/11/2020 5,000.00
22. Project Member Structural Dynamic Response Monitoring Report: BADP-C /
Baram (P0459-SKO-RPT10)
29/11/2020 10,000.00
23. Project Member Structural Dynamic Response Monitoring Report: LHDP-A
(P0459-SKO-RPT19)
29/11/2020 10,000.00
24. Project Member Structural Dynamic Response Monitoring Report: West
Lutong 4 (WL-4) (P0459-SKO-RPT14)
29/11/2020 10,000.00
25. Project Member Structural Dynamic Response Monitoring Report: Baronia
(BNQ-B) (P0459-SKO-RPT12)
29/11/2020 10,000.00
26. Project Member Structural Dynamic Response Monitoring Report: BSDP-A
(P0459-PMA-RPT20)
29/11/2020 5,000.00
27. Project Member Structural Dynamic Response Monitoring Report: ANDP-D
(P0459-PMA-RPT15b)
29/11/2020 5,000.00
28. Project Member Structural Dynamic Response Monitoring Report: ANDP-B
(P0459-PMA-RPT15a)
29/11/2020 5,000.00
29. Project Member Structural Dynamic Response Monitoring Report: Ledang
(P0459-PMA-RPT09)
29/11/2020 5,000.00
30. Project Member Structural Dynamic Response Monitoring Report: Penara
(P0459-PMA-RPT08)
29/11/2020 5,000.00
31. Project Member Structural Dynamic Response Monitoring Report: North Lukut
(P0459-PMA-RPT06)
29/11/2020 5,000.00
32. Project Member Structural Dynamic Monitoring Analysis Report for Sepat
Platform (P0459-PMA-RPT05)
28/6/2019 5,000.00