Topic (Postgraduate Final Year Project) | Field | No. of Student |
Analysis and Design of Marine Structure | Marine Structure | 2 |
Analysis and Design of Steel Section | Steel Structure | 1 |
Analysis and Design of Tubular Joint | Joint Analysis | 1 |
Concrete Mix design with Waste Material/Nano material | Material | 4 |
Extreme Corrosion Growth | Corrosion | 1 |
Monte Carlo Simulation | Reliability | 1 |
NDT on Deteriorating Structure | Forensic Engineering | 1 |
Risk and Hazard Detection of Oil Rig Production Platform | Risk Assessment | 1 |
Sediment-Impacted Detention Pond Analysis | Hydrology | 1 |
Statistical and Probabilistic Modeling | Reliability | 2 |
Pipeline repair and maintenance | Material | 3 |
Degree | Status | FYP/Dissertation/Thesis Supervision | Total Graduated | |
Main Supervisor | Co-supervisor | |||
Final Year Project (Bachelor) | Internal | 67 | 1 | 68 |
External | 0 | 0 | ||
Final Year Project (M.Sc) | Internal | 17 | 1 | 21 |
External | 0 | 3 | ||
M.Phil | Internal | 9 | 1 | 10 |
External | 0 | 0 | ||
PhD | Internal | 3 | 7 | 10 |