Research Title | Research Details | |
1. | Interlocking blockwork system for cost-effective low and medium rise building | (1/1/96 – 31/12/98)Vot No: 72076
Research Fund: IRPA, RM 76,950 Appointed as Project Member |
2. | Development and Performance Evaluation of Standard T-Section Bridge Beam for Malaysia | (1/3/96 – 31/9/00)Vot No: 72078
Research Fund: IRPA, RM 406,600 Appointed as Project Member |
3. | Remaining Fatigue Life of Steel Bridges | (1/8/97 – 31/8/98)Vot No: 71196
Research Fund: RMC, RM 18,150 Appointed as Project Member |
4. | R&D Requirements of Malaysia Construction Industry | (1/1/98 –31/12/98)Vot No: 71231
Research Fund: RMC, RM 18,225 Appointed as Project Member |
5. | Bake Free Bricks | (1/6/98 –31/5/99)Vot No: 71328
Research Fund: RMC, RM 15,000 Appointed as Project Leader |
6. | Developing Design Standard Library For Integrating Design and Construction | (15/6/99 – 14/6/2000)Vot No: 71494
Research Fund: RMC, RM 20,000 Appointed as Project Member |
7. | Development of an Integrated System for Assessment of Construction Method | (1/11/99 –31/10/2000)Vot No: 71502
Research Fund: RMC, RM 20,000 Appointed as Project Leader |
8. | The Development of an Intelligent Information Model for Construction Method Assessment in an Integrated Environment | (1/1/2000 – 31/12/2001)Vot No: 72268
Research Fund: IRPA, RM 88,000 Appointed as Project Member |
9. | Forecasting Low-Cost Housing Demand In Malaysia Using Artificial Neural Network | (1/1/2000 – 31/12/2002)Vot No: 71640
Research Fund: IRPA, RM 176,000 Appointed as Project Member |
10. | Teleconstruction for Construction Industry | (1/1/2003 – 31/12/2005)Vot No: 74107
Research Fund: IRPA, RM 227,900 Appointed as Project Member |
11. | Fast Track Wall System | (1/7/2006 – 1/6/2007)
Research Fund: Special Budget Allocation by UTM, RM 113, 530.00 Appointed as Project Member |
12. | A Computerised Work Activity Extraction from Digital Drawings | (1/1/2007 – 31/12/2009)Vot No: 73320
Research Fund: CIDB, RM 1,100,000 Appointed as Project Member |
13. | Quatitative Safety Assessment Model In IBS Construction | (1/1/2007 – 31/12/2008)Vot No: 71315
Research Fund: CIDB, RM 280,000 Appointed as Project Member |
14. | Quantitative Buildability Assessment for Building Design | (1/12/2009 – 31/12/2011)Vot No: 68745
Research Fund: AEC Sdn. Bhd., RM 150,000 Appointed as Project Leader |
15. | Rehabilitation Attributes of Road Infrastructure Subjected to Seismic Risk | (1/4/2011 – 31/3/2012)Vot No:
Research Fund: Research University Grant, RM 40,000 Appointed as Project Leader |
16. | Cost Optimization Modeling On Seismic Hazard Rectification for Sustainable Asset Maintenance Of School Building | (1/12/2012 – 31/12/2013)Ref No: PY/2012/00888
Research Fund: Research University Grant, RM35,000 Appointed as Project Member |
17. | Establishing Appropriate Indoor Environment Parameter for Isolation Tb Ward Layout Design | (1/4/2011 – 31/7/2013)Ref No: PY/2011/00781
Research Fund: Research University Grant, RM40,000 Appointed as Project Member |
18. | Model for Energy Efficiency, Environmental Quality and Material Used In Road Infrastructures | (1/8/2011 – 31/7/2014)Ref No: PY/2011/01932
Research Fund: Research University Grant Flagship, RM450,000 Appointed as Project Member |
19. | Malaysia Green Highway Rating System | (23/2/2012 – 23/11/2013)Vot No: 4B055
Research Fund: Lembaga Lebuh raya Malaysia, RM 60,000 Appointed as Project Leader |
20. | Development of Bio-material for Strengthening Reinforced Concrete Structure | (8/10/2012 – 31/3/2015)Vot No: 4S042
Research Fund: CIDB, RM 230,000 Appointed as Project Member |
21. | Decision-Making Model in Integrating Life Cycle Costing and Green Highway Index | (1/4/2014 – 31/5/2015)Ref No: PY/2014/02253
Research Fund: Research University Grant, RM 30,000 Appointed as Project Member |