RESEARCH UNIVERSITY GRANT

1. 01/01/2020 – 31/12/2022 : Project Leader, Vulnerability and Risk Assessment for Transport Infrastructure. UTM Fundamental Research. Budget approved RM 72,000.00 (Vot: Q.J130000.2551.21H41).

2. 01/07/2017 – 30/06/2019 : Project Leader, Accident Predictive Model for Malaysia Rural Road. Tier 1 RUG. Budget approved RM 40,000.00 (Vot: Q.J130000.2522.17H71).

3. 15/11/2015 – 14/11/2017 : Project Leader, Parking Generation on Government Hospitals in Malaysia. Tier 1 RUG. Budget approved RM 38,000.00 (Vot: Q.J130000.2522.11H37).

4. 01/07/2014 – 30/06/2015 : Project Leader, Fundamental Studies On Parking Generation at Expressway Rest Areas in Southern Peninsular Malaysia. Tier 1 RUG. Budget approved RM 20,000.00 (Vot: Q.J130000.2522.08H44).

5. 01/11/2013 – 31/10/2014 : Project Leader, Economic Evaluation of Upstream Detection Strategy. PAS RUG. Budget approved RM 20,000.00 (Vot: Q.J130000.2722.00K69).

6. 01/01/2020 – 30/06/2023 : Project Member, Cup Lump Modified Cold Mix Asphalt for Road Patching. UTM High Impact Research. Budget approved RM 110,000.00 (Vot: Q.J130000.2451.09G20).

7. 01/01/2020 – 30/06/2023 : Project Member, Safety Concern Related to Consumer Products Containing Radioactive Materials in Malaysia. UTM High Impact Research. Budget approved RM 100,000.00 (Vot: Q.J130000.2417.09G08).

8. 01/10/2020 – 30/09/2022 : Project Member, Impact of COVID-19 on Johor Bahru Bus Operation, Ridership and Facilities. UTM Encouragement Grant. Budget approved RM 56,000.00 (Vot: Q.J130000.3851.19J80).

9. 01/10/2020 – 31/03/2022 : Project Member, Model Peramal Pemanduan Selamat Pemandu-pemandu di Universiti Teknologi Malaysia. UTM Encouragement Grant. Budget approved RM 39,900.00 (Vot: Q.J130000.3853.19J21).

10. 01/11/2019 – 31/10/2021 : Project Member, Impact of Aggresive Behaviour on Speed Selection By Young And Middle-Aged Drivers. Tier 2 RUG. Budget approved RM 30,000.00 (Vot: R.J130000.2651.17J34).

11. 01/08/2019 – 31/07/2021 : Project Member, Prediction of RQD using Fuzzy Logic Algorithm with Rock Geophysics. Tier 2 RUG. Budget approved RM 20,000.00 (Vot: Q.J130000.2651.16J25).

12. 01/04/2019 – 31/03/2021 : Project Member, SGSHINE 3: Correlation between Radon/Thoron Concentrations with Commecially Available Used Building Materials. SIGNATURE RUG. Budget approved RM 160,000.00 (Vot: Q.J130000.2417.07G82).

13. 01/04/2019 – 31/03/2021 : Project Member, SGSHINE 3.1: In-situ Measurement of Radon (222RN) and THORON (220RN) Concentrations in Soil Gas, Water, and Air. SIGNATURE RUG.Budget approved RM 90,000.00 (Vot: Q.J130000.2417.07G90).

14. 01/02/2018 – 31/01/2020 : Project Member, Static and Cyclic Properties of Soft Clay Stabilised with Coal Ash and Cement. Tier 1 RUG. Budget approved RM 50,000.00 (Vot: Q.J130000.2522.19H57).

15. 01/07/2017 – 30/06/2019 : Project Member, Prediction on the Remaining Strength of Flooded Asphalt Mixture. Tier 1 RUG. Budget approved RM 32,800.00 (Vot: Q.J130000.2522.17H68).

16. 15/11/2015 – 14/05/2017 : Project Member, Development of Highway Traffic Vulnerability Management System for Flash Floods of Malaysia.  Tier 1 RUG. Budget approved RM 50,000.00 (Vot: Q.J130000.2522.11H34).

17. 01/04/2014 – 29/02/2016 : Project Member, Traffic Accident Predictive Model Based on Pavement Condition. Tier 1 RUG. Budget approved RM 50,000.00 (Vot: Q.J130000.2522.06H53).

18. 01/06/2014 – 31/05/2015 : Project Member, Effect of Rainfall on the Two-lane Highway  Traffic Stream Characteristics Under Artificial Light Condition. PAS RUG. Budget approved RM 20,000.00 (Vot: Q.J130000.2722.01K02).

 

 FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS FUND)

1. 01/01/2019 – 31/03/2021 : Project Leader, A Model of Parking Demand Forecast for the Malaysia Public Hospitals. Budget approved RM 61,400.00 (Vot: R.J130000.7851.5F024).

2. 01/01/2019 – 31/12/2020 : Project Member, Microstructural Behaviour for Reversible Moisture Damage in Flooded Asphalt Mixture. Budget approved RM 61,000.00 (Vot: R.J130000.7851.5F019).

3. 01/08/2016 – 31/07/2018 : Project Member, Relationship between Platoon Dispersion and Traffic Noise under Homogeneous Traffic Condition. Budget approved RM 70,500.00 (Vot: R.J130000.7822.4F867).

4. 02/11/2015 – 30/04/2018 : Project Member, Damage Identification of Bolted Structures Using Wavelet Transforms and Artificial Neural Networks. Budget approved RM 124,000.00 (Vot: R.J130000.7822.4F760).

5. 01/08/2014 – 30/06/2017 : Project Member, Analysis of speed-flow relationship based on different egress facilities criteria for pedestrian evacuation in underground space environment. Budget approved RM 87,500.00 (Vot: S.J130000.7851.4X413).

6. 01/07/2014 – 30/06/2016 : Project Member, Clustering Urban Bus Driving Behavior Using K-Mean Analysis Method for Malaysian Bus Smart Driving Guidance. Budget approved RM 105,000.00 (Vot: S.J130000.7851.4X420).

 

NETWORKING GRANT

1. 01/08/2017 – 31/08/2017 : Project Member, Menaiktaraf Fasiliti Asas bagi Meningkatkan Kehidupan dan Ekonomi Asnaf. Budget approved RM 11,986.00 (Vot: S.J130000.7322.4X283).

2. 01/08/2014 – 30/06/2017 : Project Member, Analysis of speed-flow relationship based on different egress facilities criteria for pedestrian evacuation in underground space environment. Budget approved RM 87,500.00 (Vot: S.J130000.7851.4X413).

3. 01/07/2014 – 30/06/2016 : Project Member, Clustering Urban Bus Driving Behavior Using K-Mean Analysis Method for Malaysian Bus Smart Driving Guidance. Budget approved RM 105,000.00 (Vot: S.J130000.7851.4X420).

 

CONTRACT RESEARCH PROJECT

1. 01/01/2017 – 31/05/2018 : Project Member (Project Coordinator), Transportation and  Traffic Management Studies for Johor Bahru City Centre, Batu Pahat, Muar, Kulai dan Pasir Gudang. (Collaboration between Perbadanan Pengangkutan Awam Johor (PAJ) and Pavement & Transportation Research Group, UTM). The budget agreed RM 460,000.00 (Vot: R.J130000.7622.4C127).

 

RESEARCH GRANT AWARDED BY CENTRE FOR COMMUNITY AND INDUSTRY NETWORK (CCIN)

1. 01/03/2019 – 31/08/2020 : Projek Penilaian Forensik Jalan Bersama Industri. Budget approved RM 1,561.00 (Vot: S.J130000.0851.4Y212). Type: Business Entity Grant.

2. 01/08/2017 – 31/08/2017 : Project Member, Menaiktaraf Fasiliti Asas bagi Meningkatkan Kehidupan dan Ekonomi Asnaf. Budget approved RM 11,986.00 (Vot: S.J130000.7322.4X283). Type: Networking Grant.

3. 01/11/2016 – 28/02/2017 : Project Member, Pemindahan Teknologi Kaedah Rekabentuk Turapan Jalan. Budget approved RM 5,000.00 (Vot: S.J130000.0822.4Y060). Type: Business Entity Grant.

4. 15/07/2016 – 14/04/2017 : Project Member, Penilaian Semula Rekabentuk Turapan Jalan Luar Bandar (Jalan Kampung). Budget approved RM 39,500.00 (Vot: Q.J130000.2522.15H16). Awarded by Institusi Inovasi Strategik Johor, IISJ.