Research Grant

RESEARCH GRANT

BILNAME OF GRANTROLECATEGORY OF GRANT
(UTM/OTHERS)
TYPE OF GRANTAMOUNT (RM)STARTING DATEENDING DATEVOTE NO
1Modelling Traffic Enforcement Using Intelligent Transport System In NigeriaPrincipal InvestigatorExternal GrantsOTHERS (Nigerian Institute of Transport Technology, Nigeria)RM60,00011.03.202110.03.2024R.J130000.7351.4B697
2Effects of Road Traffic on People’s Health, Safety and Environment Along Abuja-Kano Highway, NigeriaPrincipal InvestigatorExternal GrantsOTHERS (Nigerian Institute of Transport Technology, Nigeria)RM60,00014.03.202113.03.2024R.J130000.7351.4B662
BILNAME OF GRANTROLECATEGORY OF GRANT (UTM/OTHERS)TYPE OF GRANTAMOUNT (RM)STARTING DATEENDING DATEVOTE NO
1The Impact Of Road Geometrical Parameters on Travel Speed In Urban AreaPrincipal InvestigatorExternal GrantsIndustry-International Incentive GrantRM20,00001.06.202131.05.2022Q.J130000.3651.03M34
2A Model of Parking Demand Forecast for the Malaysia Public HospitalsPrincipal InvestigatorExternal GrantsFRGSRM61,40001.01.201931.09.2021R.J130000.7851.5F024
3Analysis of speed-flow relationship based on different egress facilities criteria for pedestrian evacuation in underground space environmentPrincipal InvestigatorExternal GrantsNetworking GrantRM87,50001.08.201430.06.2017S.J130000.7851.4X413
4Clustering Urban Bus Driving Behavior Using K-Mean Analysis Method for Malaysian Bus Smart Driving GuidancePrincipal InvestigatorExternal GrantsNetworking GrantRM154,50001.07.201430.06.2016S.J130000.7851.4X420
BILNAME OF GRANTROLECATEGORY OF GRANT (UTM/OTHERS)TYPE OF GRANTAMOUNT (RM)STARTING DATEENDING DATEVOTE NO
1Vulnerability and Risk Assessment for Transport Infrastructure.Principal InvestigatorUTMUTM Fundamental ResearchRM72,00001.01.202031.12.2022Q.J130000.2551.21H41
2Accident Predictive Model for Malaysia Rural RoadPrincipal InvestigatorUTMTier 1 RUGRM40,00001.07.201730.06.2019Q.J130000.2522.17H71
3Parking Generation on Government Hospitals in MalaysiaPrincipal InvestigatorUTMTier 1 RUGRM38,00015.11.201514.11.2017Q.J130000.2522.11H37
4Fundamental Studies on Parking Generation At Expressway Rest Areas in Southern Peninsular MalaysiaPrincipal InvestigatorUTMTier 1 RUGRM20,00001.07.201430.06.2015Q.J130000.2522.08H44
5Economic Evaluation of Upstream Detection StrategyPrincipal InvestigatorUTMPAS RUGRM20,00001.11.201331.10.2014Q.J130000.2722.00K69
BILNAME OF GRANTROLECATEGORY OF GRANT (UTM/OTHERS)TYPE OF GRANTAMOUNT (RM)STARTING DATEENDING DATEVOTE NO
1Optimization of MPPT using Artificial Neural Network for PV in Electric VehicleProject MemberExternal GrantsOTHERS (Nigerian Institute of Transport Technology, Nigeria)RM60,00014.03.202113.03.2024R.J130000.7309.4B701
2Traffic Management Strategies For Effective Urban Transportation System In Zaria Local Government, Kaduna State, NigeriaProject MemberExternal GrantsOTHERS (Nigerian Institute of Transport Technology, Nigeria)RM60,00017.03.202116.03.2024R.J130000.7351.4B703
BILNAME OF GRANTROLECATEGORY OF GRANT (UTM/OTHERS)TYPE OF GRANTAMOUNT (RM)STARTING DATEENDING DATEVOTE NO
1Hubungan Antara Keperluan Pengiktirafan Jurutera Profesional Dengan Pembelajaran Dan Pengajaran Efektif Dalam Kalangan Pensyarah Kejuruteraan Universiti Teknologi Malaysia (UTM)Project MemberExternal GrantDana Pembangunan PengajaranRM15,00001.07.202130.06.2023R.J130000.7716.4J521
2Geometric Design Consistency Model Of Horizontal Curve On Two-Lane Rural Road Using Operating SpeedProject MemberExternal GrantsFRGSRM54,70001.11.202031.10.2022R.J130000.7851.5F362
3Potential Application of Resin Polymer Residue from SURFACTOR factory. (Collaboration between LP PACIFIC FILMS SDN BHD and Pavement & Transportation Research Group, UTM)Project MemberExternal GrantsContract Research DTDRM22,00001.09.202028.02.2021R.J130000.7651.4C404
4Microstructural Behaviour for Reversible Moisture Damage in Flooded Asphalt MixtureProject MemberExternal GrantsFRGSRM61,00001.01.201931.12.2020R.J130000.7851.5F019
5Projek Penilaian Forensik Jalan Bersama IndustriProject MemberExternal GrantsCentre for Community and Industry Network (CCIN): Business Entity GrantRM1,56101.03.201931.08.2020S.J130000.0851.4Y212
6Analysis of Newly Designed Road Barrier for Use on Malaysia Road. (Collaboration between Pesako Technology Sdn. Bhd. and Faculty of Engineering, UTMProject MemberExternal GrantsContract Research DTDRM70,00001.06.202030.06.2020R.J130000.7651.4C445
7Relationship between Platoon Dispersion and Traffic Noise under Homogeneous Traffic ConditionProject MemberExternal GrantsFRGSRM70,50001.08.201631.07.2018R.J130000.7822.4F867
8Transportation and Traffic Management Studies for Johor Bahru City Centre, Batu Pahat, Muar, Kulai dan Pasir Gudang. (Collaboration between Perbadanan Pengangkutan Awam Johor (PAJ) and Pavement & Transportation Research Group, UTM)Project MemberExternal GrantsContract Research DTDRM460,00001.01.201731.05.2018R.J130000.7622.4C127
9Damage Identification of Bolted Structures Using Wavelet Transforms and Artificial Neural NetworksProject MemberExternal GrantsFRGSRM124,00002.11.201530.04.2018R.J130000.7822.4F760
10Menaiktaraf Fasiliti Asas bagi Meningkatkan Kehidupan dan Ekonomi AsnafProject MemberExternal GrantsCentre for Community and Industry Network (CCIN): Networking GrantRM11,98601.08.201731.08.2017S.J130000.7322.4X283
11Penilaian Semula Rekabentuk Turapan Jalan Luar Bandar (Jalan Kampung)Project MemberExternal GrantsInstitusi Inovasi Strategik Johor, IISJRM39,50015.07.201614.04.2017Q.J130000.2522.15H16
12Pemindahan Teknologi Kaedah Rekabentuk Turapan JalanProject MemberExternal GrantsCentre for Community and Industry Network (CCIN): Business Entity GrantRM5,00001.11.201628.02.2017S.J130000.0822.4Y060
13Clustering Urban Bus Driving Behaviour Using K-Mean Analysis Method for Malaysian Bus Smart Driving GuidanceProject MemberExternal GrantsNetworking GrantRM154,50001.10.201430.09.2016S.J130000.7851.4X420
14Analysis of pedestrian speed-flow relationship based on different egress facilities criteria for pedestrians’ evacuation in underground space environmentProject MemberExternal GrantsNetworking GrantRM87,50001.07.201430.06.2017S.J130000.7851.4X413
BILNAME OF GRANTROLECATEGORY OF GRANT (UTM/OTHERS)TYPE OF GRANTAMOUNT (RM)STARTING DATEENDING DATEVOTE NO
1Cup Lump Modified Cold Mix Asphalt for Road PatchingProject MemberUTMUTM High Impact ResearchRM110,00001.01.202030.06.2023Q.J130000.2451.09G20
2Safety Concern Related to Consumer Products Containing Radioactive Materials in MalaysiaProject MemberUTMUTM High Impact ResearchRM100,00001.01.202030.06.2023Q.J130000.2417.09G08
3Impact of COVID-19 on Johor Bahru Bus Operation, Ridership and FacilitiesProject MemberUTMUTM Encouragement GrantRM56,00001.10.202030.09.2022Q.J130000.3851.19J80
4Model Peramal Pemanduan Selamat Pemandu-pemandu di Universiti Teknologi MalaysiaProject MemberUTMUTM Encouragement GrantRM39,90001.10.202031.03.2022Q.J130000.3853.19J21
5Impact of Aggresive Behaviour on Speed Selection By Young And Middle-Aged DriversProject MemberUTMTier 2 RUGRM30,00001.11.201931.10.2021R.J130000.2651.17J34
6Prediction of RQD using Fuzzy Logic Algorithm with Rock GeophysicsProject MemberUTMTier 2 RUGRM20,00001.08.201931.07.2021Q.J130000.2651.16J25
7SGSHINE 3: Correlation between Radon/Thoron Concentrations with Commecially Available Used Building MaterialsProject MemberUTMUTMShine Signature GrantsRM160,00001.04.201931.03.2021Q.J130000.2417.07G82
8SGSHINE 3.1: In-situ Measurement of Radon (222RN) and THORON (220RN) Concentrations in Soil Gas, Water, and AirProject MemberUTMUTMShine Signature GrantsRM90,00001.04.201931.03.2021Q.J130000.2417.07G90
9Static and Cyclic Properties of Soft Clay Stabilised with Coal Ash and CementProject MemberUTMTier 1 RUGRM50,00001.02.201831.01.2020Q.J130000.2522.19H57
10Prediction on the Remaining Strength of Flooded Asphalt MixtureProject MemberUTMTier 1 RUGRM32,80001.07.201730.06.2019Q.J130000.2522.17H68
11Development of Highway Traffic Vulnerability Management System for Flash Floods of MalaysiaProject MemberUTMTier 1 RUGRM50,00015.11.201514.05.2017Q.J130000.2522.11H34
12Evaluation of Stress Distribution Under Diametrical Compression Test on RockProject MemberUTMTier 1 RUGRM50,00001.05.201531.10.2016Q.J130000.2522.10H88
13Traffic Accident Predictive Model Based on Pavement ConditionProject MemberUTMTier 1 RUGRM50,00001.04.201429.02.2016Q.J130000.2522.06H53
14Effect of Rainfall on the Two-lane Highway Traffic Stream Characteristics Under Artificial Light ConditionProject MemberUTMPAS RUGRM20,00001.06.201431.05.2015Q.J130000.2722.01K02