Petronas Project: RAPID Pengerang

On 5th June 2015, we have given the opportunity to visit one of the biggest project by Petronas which is RAPID Pengerang. We have a short discussion with Ir. Adnan the possibilities for our program Creativity Station 2015 to visit the site in August.

pengerang pengerang2 pengerang3

Photos from our visit with Ir. Adnan. With Dr. Fadzil, Prof. Seo, Jiin, Pak Dwiki, Pak Subhan and Nabila.

Facts about RAPID Project

Malaysian oil and gas company Petroliam Nasional Berhad (Petronas) is developing a refinery and petrochemical integrated development project (RAPID) and other associated facilities in Pengerang, Southern Johor, Malaysia, through a project called Pengerang Integrated Complex (PIC).

Launched in May 2012, PIC is part of the larger Pengerang Integrated Petroleum Complex (PIPC) proposed by the Johor State Government. Total investment for the PIPC project is approximately RM97bn ($27bn), of which the RAPID project costs RM57bn ($16bn) and the associated facilities require RM40bn ($11bn).

Southern Johor was chosen as the location for the project due to its proximity to deepwater port facilities and regional demand centres. The location enables easy transport of finished products to the market.The complex will cover an area of 2,000ha and includes a 300,000 barrels per day (bpd) crude oil refinery and a petrochemical complex. These two projects together will produce 7.7mtpa of differentiated and specialty chemicals such as synthetic rubbers and high-grade polymers.

The RAPID project refinery will produce gasoline and diesel which will meet Euro 4 and Euro 5 fuel specifications. It will also supply feedstock for the petrochemical complex which will produce highly-specialised chemicals. The refinery will use modern technologies to produce these products and follow stringent environmental regulations.

Source: Rapid Project

pengerang5

Location of Pengerang

pengerang4

The area for RAPID project