Consultancies

2020:  Total Maximum Daily Load (TMDL) for Skudai River, Badan Kawal Selia Air Johor (BAKAJ), Project Member.

2020:  Kajian Rancangan Kawasan Khas Sungai Skudai, Majlis Bandaraya Johor Bahru (MBJB), Project Leader

2019 – 20:  Verification and performance study of pilot trial sewage treatment plant, Renolux Engineering Sdn. Bhd., Project Member.

2019 – 20:  Preliminary and Feasibility Study of Decentralised Water Treatment Design and Technology for Kuala Lumpur Area, National Hydraulics Research Institute Malaysia (NAHRIM), Project Member.

2019 – 20:  Climate Change Adaptation Framework on Water Sectors, National Hydraulics Research Institute Malaysia (NAHRIM),Project Member.

2018 – 19:  Kajian Rancangan Kawasan Khas Sungai Skudai, Majlis Perbandaran Iskandar Puteri (MBIP), Project Member.

2018:  Water Management Blueprint for PBT Pengerang 2018 – 2027, PBT Pengerang, Project Member.

2012:  Preliminary EIA For Proposed Oil Palm Plantation (404.7 Ha) at PT 6943 & 6944, Mukim Relai, Daerah Chiku, Jajahan Gua Musang, Kelantan, Project Member.

2012:  Preliminary EIA For Proposed Timber Latex Clone Plantation (400.0 Ha) at HSK Lebir (Comp 108, 109, 110, 112, 113 & 114), Mukim Relai, Daerah Chiku, Gua Musang, Kelantan, Project Member.

2012:  Preliminary EIA For Proposed Mixed Agriculture (Vegetables, Fruits & Flowers) Project (480.4 Ha) at PT 5618 & 5619, Lojing, Mukim Ulu Nenggiri, Daerah Bertam, Gua Musang, Kelantan, Project Member.

2011 – 12:  Preliminary EIA For Proposed Timber Latex Clone Plantation (400.0 Ha) at HSK Batu Papan (Comp 20, 22, 23 & 30), Mukim Batu Papan, Daerah Galas, Gua Musang, Kelantan, Project Member.

2011 – 12:  Preliminary EIA For Proposed Forest Timber Plantation (607.028 Ha) at PT 4480, Mukim Ulu Nenggiri, Daerah Bertam, Gua Musang, Kelantan, Project Member.

2011 – 12:  Preliminary EIA For Proposed Timber Latex Clone Plantation (400.0 Ha) at HSK Serasa (Comp 9, 14, 15, 16 & 17), Mukim Kuala Stong, Daerah Dabong, Kuala Krai, Kelantan, Project Member.

2011:  Preliminary EIA For Proposed Timber Latex Clone Plantation (400.0 Ha) At HSK Lebir (Comp 21, 45 & 46), Mukim Relai, Daerah Chiku, Gua Musang, Kelantan, Project Member.

2010 – 11:  Preliminary EIA For Proposed Timber Latex Clone Plantation (675.0 Ha) At HSK Ulu Temiang (Comp 3, 4, 5 & 15), Mukim Ulu Geris, Daerah Dabong, Kuala Krai, Kelantan, Project Member.

2010 – 11:  Preliminary EIA For Proposed Timber Latex Clone Plantation (667.0 Ha) At HSK Ulu Temiang (Comp 25, 26, 27, 28, 29, 31, 32, 33 & 34), Mukim Kuala Geris, Daerah Dabong, Kuala Krai, Kelantan, Project Member.

2010 – 11:  Preliminary EIA For Proposed Oil Palm Plantation (6,070.0 Ha) At Mukim Manek Urai, Daerah Olak Jeram, Jajahan Kuala Krai, Kelantan, Project Member.

2010 – 11:  Preliminary EIA For Proposed Forest Timber Plantation (566.0 Ha) at PT 5373 & 5374, Mukim Ulu Nenggiri, Daerah Bertam, Gua Musang, Kelantan, Project Member.

2010 – 11:  Preliminary EIA For Proposed Mixed Agriculture (Vegetables, Fruits & Flowers) Project (400.0 Ha) At PT 5400, Lojing, Mukim Ulu Nenggiri, Daerah Bertam, Gua Musang, Kelantan, Project Member.

2010 – 11:  Preliminary EIA For Proposed Mixed Agriculture (Vegetables, Fruits & Flowers) Project (400.0 Ha) At PT 5399, Lojing, Mukim Ulu Nenggiri, Daerah Bertam, Gua Musang, Kelantan, Project Member.

2010 – 11:  Preliminary EIA For Proposed Mixed Agriculture (Vegetables, Fruits & Flowers) Project (400.0 Ha) At PT 5401-5403, Lojing, Mukim Ulu Nenggiri, Daerah Bertam, Gua Musang, Kelantan, Project Member.

2010:  Preliminary EIA For Proposed Mining Activity (250.0 Ha) At Lot 2264, Sg. Mas, Mukim Sokor, Daerah Sokor, Tanah Merah, Kelantan, Project Member.

2010:  Preliminary EIA For Proposed Timber Latex Clone Plantation (400.0 Ha) At HSK Ulu Temiang (Comp 17, 18, 21 & 22), Mukim Manek Urai, Daerah Olak Jeram, Kuala Krai, Kelantan, Project Member.