Dear All SBEQ 3422 Students (UTM JB) Semester I Session 2019/2020

You are requested to advise the Contractor on the proposed Project and develop a realistic Work Programme and Project Cash Flow of the Project.

  • Prepare the PROGRAMME OF WORK for the proposed project
  • Prepare the contractor’s  CASH FLOW  and S-CURVE of the Project expenditure plotted against duration.
  • Prepare the MATERIAL SCHEDULING (5 Important Materials : 1. Concrete – Cement, Sand Aggreggate 2. Reinforcement 3. Formwork 4. Painting Works 5. Plastering Works) based on the above Work Programme (30%).