OSH 11-12 April 2020

OCCUPATIONAL SAFETY AND HEALTH (FRSB 2293)

11-12 April 2020

Online Class during MCO

Introduce yourself

Chapter 1 OSH_legislations in Malaysia

Chapter 2a Human Failures

Chapter 3 Field Safety Considerations and its Design Implications — Introduction to Workplace Health and Safety

Chapter 3a Basic Principles of Accident Prevention

Chapter 5 5S

Hazard Form

Hazard_Mapping

System of Safety

Assessment

  1. Group Case Study (Engineering Disasters) (15%)

 

2. Group Activity  Assignment  (Hazard Mapping) (15%)

Hazard Mapping Manual

3. Test 1 (15%)

4. Test 2 (15%)

Add file TEST 2 HERE

TEST 2
QUESTION 1
A company based in Penang which assembled PCB based has been operating for the past 7 years with 1000 employees.  In 2010, two accidents occurred:
  • First accident: One employee had the front portion of the finger (right hand) severed during a mechanical assembly process.
  • Second accident: Another employee accidentally stucked his hand in a conveyor belt during a maintenance process.
The cases were not reported to DOSH and no claim was done under PERKESO.  It appears that the company does not have a safe working environment or a safety policy in their workplace.
  • Describe the roles and responsibilities of the employer and employees in ensuring a safe and healthy workplace. (8 marks)
  • Explain ways to improve the safety awareness to the workers. (10 marks) 
  • Suggest the safety measures to be implemented in preventing accidents from recurring. (9 marks)

Add file TEST 2 HERE

5. PMA (40%)

PMA (Please submit PMA before 12 Mei 2020)

Occupational Safety and Health Management in your Organizations

  1. Introduction
  2. OSH issues
  3. Objectives
  4. Preventing Accidents
    1. Hazard Mapping
    2. Hazard Assessment Form
  5. System of Safety
  6. 5s
  7. Conclusion
  8. References

Submit PMA HERE