NO. | TYPE | TITLE | YEAR | AUTHOR |
1 | Classified/Technical | PROGRESS REPORT SETTLEMENT SURVEY AT COAL WORKSHOP AND CONVEYOR AREA AT TG. BIN POWER PLANT (TBPP), SEKAT, JOHOR. | 2020 | Muhammad Azril Bin Hezmi (Co-author) |
2 | Classified/Technical | FINAL REPORT SOIL SETTLEMENT SURVEY AT TANJUNG BIN ENERGY POWER PLANT, KUKUP, JOHOR DARUL TAKZIM. | 2020 | Muhammad Azril Bin Hezmi (Co-author) |
3 | Classified/Technical | STOCKPILE INVENTORY SURVEY REPORT FOR SOUTHERN PREMIX SDN. BHD. AIR BENBAM, KULAI, JOHOR DARUL TAKZIM | 2019 | Muhammad Azril Bin Hezmi (Co-author) |
4 | Classified/Technical | PROGRESS REPORT NO. 2 MELAKSANAKAN PROGRAM PEMANTAUAN CERUN DAN PEMASANGAN PERALATAN PEMANTAUAN GEGARAN DI LOGI RAWATAN AIR GUNUNG PULAI | 2018 | Muhammad Azril Bin Hezmi (Co-author) |
5 | Classified/Technical | PROGRESS REPORT NO.1: PROJEK “MELAKSANAKAN PROGRAM PEMANTAUAN CERUN DAN PEMASANGAN PERALATAN PEMANTAUAN GEGARAN DI LOGI RAWATAN AIR GUNUNG PULAI” | 2018 | Muhammad Azril Bin Hezmi (Co-author) |
6 | Classified/Technical | SITE INVESTIGATION FOR ROCK RESERVE ESTIMATION AT PROPOSED QUARRY SITE PN 27789 LOT 28703 MUKIM AMPANGAN SEREMBAN NEGERI SEMBILAN DARUL KHUSUS | 2017 | Muhammad Azril Bin Hezmi (Co-author) |
7 | Classified/Technical | Installation of an Early Warning System at Sungai Ayer Hitam Besar Catchment Area Hutan Lipur Gunung Pulai 1, Kulai Johor Darul Takzim | 2016 | Muhammad Azril Bin Hezmi (Co-author) |
8 | Classified/Technical | Standard Operating Procedures Manual: Installation of an Early Warning System at Sungai Ayer Hitam Besar Catchment Area Hutan Lipur Gunung Pulai 1 (HLLG1), Kulai | 2016 | Muhammad Azril Bin Hezmi (Co-author) |
9 | Modules | Teaching Module Soil Mechanics SKAA1317 | 2014 | Muhammad Azril Bin Hezmi (Co-author) |
Examination papers
SKAA 1713- SOIL MECHANICS
SKAA2722 – GEOTECHNIC 1
SEMESTER I, SESSION 2015/2016 (Q)
SEMESTER I, SESSION 2015_2016 (A)