Consultation: Underprivillage Community Water Supply

After a few visit to site and geophysic testing on the Site on last Jun 2016. The consultation and research team members have decided to choose Vertical Tube Well as to increase the quality and quantity of Orang Asli Kg. Air Pasir Kluang water supply. Although there is existing vertical tube well, however the quantity of the water a bit short to fullfill the needs. Based on the Geophysical investigation using Resistivity testing. The team had concluded a new location of vertical tube well intake should be installed.