Proposed Off-Site Scheduled Waste Recovery Plant by Duta Chem Sdn Bhd located on Lot PT 3228, Daerah Kinta (Batu Gajah), Lahat, Perak within Taman Perindustrian Perabot Negeri Perak (vot: GTIM (114))- Project Proponent: Duta Chem Sdn Bhd
- Amount ; RM 14,000
- Location: Batu Gajah, Perak
- Date: January 2013
- Role: Quantity Risk Assessment
- EIA – PROPOSED INCREASE EPS PLANT CAPACITY AT LOT 143, JALAN CECAIR, FREE TRADE ZONE, 81700 PASIR GUDANG, JOHOR (vot: GTIM (113))
- Project Proponent: Idemitsu (M) Sdn Bhd
- Amount: RM 15,000
- Location: Pasir Gudang
- Date: March, 2012
- Role: Quantity Risk Assessment
- PROPOSED AND OFF SITE SCHEDULED WASTE RECOVERY PLANT BY SUNGEI RENGIT SDN BHD LOCATED ON LOT 590, MIEL INDUSTRIAL AREA, JALAN KELULI 9, PASIR GUDANG, JOHOR (vot: GTIM (112))
- Project Proponent: Yozai Sdn Bhd
- Amount: RM 15,000
- Location; Pasir Gudang
- Date: February 2012
- Role: Quantity Risk Assessment
- Proposed Tin Mining at Coast Water Off Kuala Sungai Baru, Alor Gajah, Melaka. Unit Perancang Ekonomi Melaka (UPEN) (vot: 570).
- Project Proponent: UPEN, Melaka
- Amount: RM 1.2 million
- Location: Kuala Sungai Baru, Melaka
- Date: December, 2011
- Role: Air and Noise Consultant
- PROJEK MEMBUANG KELODAK DAN MENDALAMKAN SUNGAI SIMPANG KIRI, DAERAH BATU PAHAT, JOHOR SERTA KERJA-KERJA BERKAITAN (vot: 546)
- Project Proponent: Hatimuda Sdn. Bhd.
- Amount: RM 85,000
- Location: Sg Simpang Kiri, Batu Pahat
- Date: May 2010
- Role: Air and Noise Consultant
- CADANGAN PEMBINAAN 2720 UNIT RUMAH PANGSA KOS RENDAH (RUMAH MAMPU MILIK) BAGI MENEMPATKAN SEMULA SETINGGAN DAN LAIN-LAIN KEMUDAHAN DI ATAS LOT PTD 194789, SEBAHAGIAN LOT PTD 146149, PTD 148146, PTD 148153 DAN 194804
- Project Proponent: Bayou Bay Development Sdn Bhd
- Amount: RM 71,000
- Location: Mukim Tebrau, Johor Bahru
- Date: August 2010
- Role: Water, Wastewater, Air and Noise Quality
- KESAN PENILAIAN ALAM SEKITAR BAGI CADANGAN PEMBANGUNAN TASIK KENYIR SEBAGAI KAWASAN BEBAS CUKAI (VOT: 63328)
- Project Proponent: KETENGAH, Terengganu
- Amount: Rm 91,000
- Location: Tasik Kenyir, Terengganu
- Date: April 2010
- Role: Water quality modelling, wastewater, air and noise quality and solid waste management
- A PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR RUBBER FOREST PLANTATION IN MUKIM SEMBRONG, DAERAH MERSING, JOHOR
- Project Proponent: PPL Plantation Sdn Bhd
- Amount: RM 75,000
- Location: Hutan Simpan Kekal Labis Tambahan, Mukim Sembrong, Daerah Mersing, Johor
- Date: February 2010
- Role: Water quality modelling, wastewater, air and noise quality and solid waste management
- ENVIRONMENTAL IMPACT ASSESSMENT FOR INDUSTRIAL DEVELOPMENT AT ZONE 12B PHASE 2, PASIR GUDANG INDUSTRIAL ESTATE, MUKIM PLENTONG, JOHOR BAHRU
- Project Proponent: Johor Corporation
- Amount: RM 75,000
- Location: Pasir Gudang, Johor
- Date: December, 2010
- Role: EIA Team Member – Industrial processes
- ENVIRONMENTAL IMPACT ASSESSMENT FOR QUARRY OPERATION AT BLOCK B, PART OF BANANG FOREST RESERVE, MUKIM SIMPANG KANAN, BATU PAHAT
- Project Proponent: Harta Warga Sdn Bhd
- Amount: RM 65,000
- Location: Batu Pahat, Johor
- Date: December, 2010
- Role: EIA Team Member – Industrial processes
- PROPOSED DEVELOPMENT OF MARINE AND RIVERINE FACILITIES ON LOT PTD 504 & LOT 1668 AT SUNGAI BATU PAHAT, DAERAH BATU PAHAT, JOHOR (vot: 397)
- Project Proponent: Second Port Logistics Sdn Bhd
- Amount: RM 1.2 million
- Location: Sg. Batu Pahat, Johor
- Date: August 2010
- Role: Quantitative Risk Assessment
- A PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR OIL PALM PLANTATION (Vot: 533B)
- Project Proponent: YPJ Plantation Management Sdn Bhd
- Amount: RM 67,000
- Location: PTD. 394, Mukim Kambau, Sedili Besar, Kota Tinggi
- Date: February 2010
- Role: Quantitative Risk Assessment and Industrial Process
- A PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR REVISED TLP OIL TERMINAL (Vot: 533A)
- Project Proponent: Tanjung Langsat Port, Sdn Bhd (PLO 25C)
- Amount: RM 105,000
- Location: Bangunan TLP, Kompleks Perindustrian Tanjung Langsat, Peti Surat 160, 81707, Pasir Gudang, Johor
- Date: October 2009
- Role: Quantitative Risk Assessment
- A PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR PAINTS, COOLANT, ALUMINIUM HYDROXIDE AND NICKEL RECOVERY FACILITIES
- Project Proponent: Positive Chemicals Sdn Bhd. (Co No. 225966 D)
- Amount: RM 67,000
- Location: Lot 617, Jalan MIEL 1 Off, Jalan Keluli Sembilan, Kawasan Perindustrian MIEL Fasa IV, Pasir Gudang Mukim Plentong, Johor Bahru.
- Date: December 2009
- Role: Quantitative Risk Assessment and Industrial Process
- PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED FACTORY EXPANSION
- Project Proponent: Holchim (M) Sdn Bhd
- Amount: RM 55,000
- Location: Lot 119, Jalan Pukal 3, Pasir Gudang, Johor
- Date of Appointment: August 2009
- Role: Water, Wastewater Quality and Noise Pollution
- PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR RUNAWAY EXTENSION (2nd Phase) OF BATU BERENDAM AIRPORT, MELAKA (Vot: 63671)
- Project Proponent: Uni-Integrated Sdn Bhd
- Amount: RM 72,000
- Location: BAtu Berendam, Melaka
- Date of Appointment: May 2009
- Role: Water, Wastewater Quality, Air and Noise Pollution
- PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR TANJUNG LANGSAT PLANT OIL TERMINAL AT PASIR GUDANG, JOHOR (Vot: 59002)
- Project Proponent: Dialog E&C Sdn Bhd
- Amount: RM 77,000
- Location: Tanjung Langsat, Pasir Gudang
- Date of Appointment: June 2009
- Role: Quantitative Risk Assessment
- PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR A PROPOSED QUARRY AT BELUNGKUR, KOTA TINGGI (Vot: 58001)
- Project Proponent: Kami Granite Sdn Bhd
- Amount: RM 65,000
- Location: Mukim Belungkur, Pengerang, Kota Tinggi
- Date of Appointment: November 2008
- Role: Air and Noise Pollution
- A Preliminary Environmental Impact Assessment for Paints, Coolant, Aluminium Hydroxide and Nickel Recovery Facilities
- Project Proponent: Positive Chemicals Sdn Bhd. (Co No. 225966 D)
- Amount: RM 45,000
- Location: Lot 617, Jalan MIEL 1 Off, Jalan Keluli Sembilan, Kawasan Perindustrian MIEL Fasa IV, Pasir Gudang Mukim Plentong, Johor Bahru.
- Date: December 2009
- Role: Quantitative Risk Assessment
- PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT FOR RAGS/FILTERS, CONTAINERS, OIL/WATER MIXTURE, ALUMINIUM/COOLANT SCRAP RECYCLING & RECOVERY AT PTD 150
- Project Proponent: Perniagaan Saudara Baru
- Amount: RM 72,000
- Location: Mukim Sungai Tiram, Ulu Tiram, Johor Bahru
- Date of Appointment: January 2009
- Role: Quantitative Risk Assessment (QRA), Industrial Process
- PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT – SPENT OIL AND CHEMICAL RECOVERY ACTIVITY AT at PLO 593 AND 594, MUKIM PLENTONG, JOHOR BAHRU, JOHOR
- Project Proponent: Yozai (M) Sdn Bhd
- Amount: RM 82,000
- Location: Plentong, Johor Bahru
- Date of Appointment: October 2008
- Role: Water Quality & Modelling, Air and Vibration Modelling and Noise, Risk Assessment and Emergency Response Plan (ERP)
- ENVIRONMENTAL MONITORING PROGRAMME – THE PROPOSED Manufacture 400 TPD Refined Bleached Deodorised Palm Oil (RBDPO) through Physical Refinery and Later Produce 360 TPD Palm based Methylester On-Site.
- Project Proponent: YPJ Palm International Sdn Bhd
- Amount: RM 67,000
- Location: PLO 71 Tanjung Langsat Industrial Complex, 81700 PASIR GUDANG
- Date of Appointment: August 2008
- Role: Water Quality, Air and Noise
- Supplementary Environmental Impact Assessment for The Proposed Conversion of Light Industry to Medium Industry on Part of Lot PTD106885, Mukim Kulai, Kulaijaya, Johor
a) Project Proponent: AXIS AME IP Sdn Bhd
b) Location: Mukim, Kulai Kulaijaya
c) Date: April, 2013 Role: Water Quality and Modelling
24. Preliminary Environmental Impact Assessment for Development of UTHM Campus, at LO38, Mukim Minyak Beku, Tanjung Laboh, Batu Pahat, Johor
a) Project Proponent: Pejabat Pembangunan dan Pengurusan Harta Bina, UTHM, 86400, Parit Raja
b) Location: Mukim Minyak Beku, Tanjong Laboh, Johor
c) Date: July, 2013
d) Role: EIA consultant, Risk Assessment
25. SUPPLEMENTARY ENVIRONMENTAL IMPACT ASSESSMENT FOR CONTAMINATED SCRAP METAL RECOVERY, AT PLO 99, JALAN NIBONG 2, TANJUNG LANGSAT INDUSTRIAL PARK, MUKIM SG TIRAM, JOHOR
(a) Project Proponent: Eng Song Aluminium Industries Sdn BhdAmount: RM 83,000
(b) Location: Tanjung Langsat, Pasir Gudang
(c) Date: July 2013
(d) Role: EIA consultant, Risk Assessment
26. SUPPLEMENTARY ENVIRONMENTAL IMPACT ASSESSMENT FOR JETTYY CONSTRUCTION FOR QUARRY OPERATION ON LOT 1831 AND PART OF PTD 1834 OF BUKIT BELUNGKOR, MUKIM TANJUNG SURAT, KOTA TINGGI, JOHOR
(a) Project Proponent: Johor Corporation
(b) Location: Bukit Belungkor, Kota Tinggi, Johor
(c) Date: February 2013
(d) Role: EIA consultant, Risk Assessment
27. EIA Pembangunan Bandar Baru Kijal, Kemaman dan Pembangunan Pusat Pentadbiran Daerah Kuala Nerus, Terengganu (vot: pending)
(a) Project Proponent: Majlis Perbandaran Kemaman, Terengganu
(b) Amount: RM 94,500
(c) Location: Bandar Baru, Kijal, Terengganu
(d) Date: January 2013
(e) Role: Project Leader
28. PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT (PEIA) For Proposed an Off Site Scheduled Waste Recovery Plant
(a) Project Proponent: KAS Aluminium Sdn Bhd, PLO 46, Jalan Perindustrian 5, Kawasan Perindustrian Pontian, 82000 Pontian Johor
(b) Amount: RM 15,000
(c) Location: Lot PLO 547, Jalan Keluli 3, 81700, Pasir Gudang, Johor
(d) Role: Environmental Risk Assessment
29. PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT (PEIA) For Proposed Mixed Development of Meridin East Mukim Plentong, Daerah Johor Bahru, Johor
(a) Project Proponent: Kualiti Ceria Sdn Bhd, 33A Jalan Indah 10/1, Taman Bukit Indah, 81200 Johor Bahru
(b) Amount: RM 15,000
(c) Location: Sanjung Tropika Development Sdn Bhd, Wisma Mah Sing, Jalan Mutiara Emas Putih, Taman Austin Perdana, 81100, Skudai Johor
(d) Role: Water Quality Modelling