Skip to content
Sr. Ts. Dr. Radzuan Bin Sa'ari
School of Civil Engineering, UTM
Sr. Ts. Dr. Radzuan Bin Sa'ari
  • Home
  • Biography
    • Academic Qualification
    • Field of Specialization
    • Working Experience
    • Curriculum Vitae
    • Administrative
    • Awards
  • Teaching
    • Basic Engineering Surveying
    • Engineering Surveying
    • Survey Camp
    • Advanced Engineering Surveying
    • Integrated Design Project (Site Planning & Earthwork)
    • Industrial Training Supervision
    • FYP, Master & PhD Suoervision
    • My eContent
  • Research
    • Journal & Conference Publication
    • Thesis & Technical Reports
    • Book Chapter
    • Intelectual Property
    • Invited Speaker
    • Supervision
    • Research Activities
  • Surveying Unit
    • Project Experience
    • Short Course Available
    • Showcase
    • Surveying Consultancy Services
    • Surveying Equipment Rental Services
  • Surveying Method
    • Levelling
    • Traverse Survey
    • Detail Survey
    • Setting-Out /As-Built Survey
    • GNSS Surveying
    • Close Range Photogrammetry
    • Terrestrial Laser Scanner (TLS)
    • Unmanned Aerial Vehicle (UAV)
    • Hydrographic Survey
    • Deformation & Monitoring Survey
    • Tide Observation & Monitoring
  • Community Service
    • Community Service Activities
    • Activities In MedSOS
  • Link
  • Leave Your Message Here….

Tide Observation & Monitoring

Setup Tide Gauge System
Tide Gauge Setup and Pre Installation
Tide Gauge Setup and Pre InstallationTide Gauge Trial To Record Real Time Tide Reading and TestingLevelling From TBM to Tige Gauge StationLevelling From TBM to Tige Gauge StationLevelling From TBM to Tige Gauge StationTide Gauge Installation & ConfigurationTide Gauge Installation & Configuration
Tide Gauge Installation & ConfigurationTide Gauge Installation & Site CalibrationTide Gauge Installation & Configuration
Realtime Tide Monitoring Team For Offshore Structure LoadoutRealtime Tide Monitoring Display in Loadout Command CentreRealtime Tide Monitoring Display in Loadout Command Centre
Remote Control Display Unit – Realtime Tide Monitoring System

Installation and Setup Vefiried by Client Representative

Jacket Structure Ready for Loadout
Jacket Structure Ready for Loadout
Jacket Structure Ready for LoadoutJacket Structure Ready for Loadout OperationTopside  Structure Ready for Loadout OperationTopside  Structure Ready for Loadout
Loadout Operation Almost Completed

  • Calendar

    June 2025
    S M T W T F S
    1234567
    891011121314
    15161718192021
    22232425262728
    2930  
         
Sr. Ts. Dr. Radzuan Bin Sa'ari
Proudly powered by WordPress.