On day 3 we continued the installation of PVC pipes and HDPE pipes.
Breakfast and also catching up with morning news from TV (we have astro NJOI at our houseboat).
Our houseboat (at the back) and our barge (at the front). The barge is used for transporting our pipes and equipments.
On the third day our houseboat moved to another site of the river since the waste tank is already full and need to be emptied 🙂
On the third day also we completed the final connection of the pipes.
Finally the PVC pipes and the HDPE pipes met.
Dr. Shamsul installing the reducer at the end of the PVC pipes.
We didn’t forget our solat.
Recent Comments